Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAccepted-AOC N 944 947 MANIA MARG BAMLO NAGPUR OC DISTRICT NAGPUR 441002 | NAGPUR | NAGPUR | MAHARASHTRA | 441002 | L1 | Accepted-AOC LOWEST BIDDER L1 | |
| 2 | L2₹6.3 L+₹77,549.60 (14.1%)Rejected-Finance | L2 | Rejected-Finance REJECTED | |
| 3 | L3₹9.6 L+₹4.1 L (74.2%)Rejected-Finance 402 SWAPNIL SALAJ APPT GANDHI NAGAR GANDHI NAGAR NAGPUR NAGPUR MAHARASHTRA 440010 | NAGPUR | MAHARASHTRA | 440010 | L3 | Rejected-Finance REJECTED |
Tender Value
₹7.9 L
EMD Value
₹9,900
Closing Date
29 Sept 2023, 6:00 pmClosed
STAFF OFFICER CIVIL WCL NAGPUR AREA
OFFICE OF THE AREA GENERAL MANAGER NAGPUR AREA PO KASTURBA NAGAR JARIPATKA NAGPUR NAGPUR 440014
Providing and fixing green gym equipments at villages Hingna Barra(BSSA), Warada (GSA), Singori (BSSA) and New Gondegaon (GSA) under CSR activity of Nagpur Area 23-24.
2023_WCL_289056_3
na3250-civ-e-tender 53-2023-24
Open Tender
Civil Works - Others
Item Rate
60 days
BHANEGAON SINGHORI, GONDEGAON SUB AREA NAGPUR AREA
AS PER NIT
3 documents required · 3 mandatory
₹9,900
25 Nov 2023
18 Sept 2023
3 Oct 2023
19 Sept 2023
29 Sept 2023
19 Sept 2023
18 Sept 2023 - 24 Sept 2023
Amount
Providing and fixing green gym equipment at site inclusive of minor site preparation , earthwork, grouting , levelling , clearing site after installation all complete as per the instruction of the officer in charge ( labour , material , transport , handling etc to be carried out by the contractor) Equipment should be constructed from MS pipe (IS 1239-2004) , bearing used should be SKF /equivalent , bearing caps of HDPE material and powder coated paint with min 90 micron thickness - Shoulder Press Double
Providing and fixing green gym equipment at site inclusive of minor site preparation , earthwork, grouting , levelling , clearing site after installation all complete as per the instruction of the officer in charge ( labour , material , transport , handling etc to be carried out by the contractor) Equipment should be constructed from MS pipe (IS 1239-2004) , bearing used should be SKF /equivalent , bearing caps of HDPE material and powder coated paint with min 90 micron thickness - Surf Board Double
Providing and fixing green gym equipment at site inclusive of minor site preparation , earthwork, grouting , levelling , clearing site after installation all complete as per the instruction of the officer in charge ( labour , material , transport , handling etc to be carried out by the contractor) Equipment should be constructed from MS pipe (IS 1239-2004) , bearing used should be SKF /equivalent , bearing caps of HDPE material and powder coated paint with min 90 micron thickness - Single Twister
Providing and fixing green gym equipment at site inclusive of minor site preparation , earthwork, grouting , levelling , clearing site after installation all complete as per the instruction of the officer in charge ( labour , material , transport , handling etc to be carried out by the contractor) Equipment should be constructed from MS pipe (IS 1239-2004) , bearing used should be SKF /equivalent , bearing caps of HDPE material and powder coated paint with min 90 micron thickness -Leg Press Double
Providing and fixing green gym equipment at site inclusive of minor site preparation , earthwork, grouting , levelling , clearing site after installation all complete as per the instruction of the officer in charge ( labour , material , transport , handling etc to be carried out by the contractor) Equipment should be constructed from MS pipe (IS 1239-2004) , bearing used should be SKF /equivalent , bearing caps of HDPE material and powder coated paint with min 90 micron thickness - Sky walker
Providing and fixing green gym equipment at site inclusive of minor site preparation , earthwork, grouting , levelling , clearing site after installation all complete as per the instruction of the officer in charge ( labour , material , transport , handling etc to be carried out by the contractor) Equipment should be constructed from MS pipe (IS 1239-2004) , bearing used should be SKF /equivalent , bearing caps of HDPE material and powder coated paint with min 90 micron thickness - Cycle
Providing and fixing green gym equipment at site inclusive of minor site preparation , earthwork, grouting , levelling , clearing site after installation all complete as per the instruction of the officer in charge ( labour , material , transport , handling etc to be carried out by the contractor) Equipment should be constructed from MS pipe (IS 1239-2004) , bearing used should be SKF /equivalent , bearing caps of HDPE material and powder coated paint with min 90 micron thickness - Chest Press Double
Providing and fixing green gym equipment at site inclusive of minor site preparation , earthwork, grouting , levelling , clearing site after installation all complete as per the instruction of the officer in charge ( labour , material , transport , handling etc to be carried out by the contractor) Equipment should be constructed from MS pipe (IS 1239-2004) , bearing used should be SKF /equivalent , bearing caps of HDPE material and powder coated paint with min 90 micron thickness - Pull up station
Providing and fixing green gym equipment at site inclusive of minor site preparation , earthwork, grouting , levelling , clearing site after installation all complete as per the instruction of the officer in charge ( labour , material , transport , handling etc to be carried out by the contractor) Equipment should be constructed from MS pipe (IS 1239-2004) , bearing used should be SKF /equivalent , bearing caps of HDPE material and powder coated paint with min 90 micron thickness - Air Walker Single
Transportation Cost
Loading and unloading charges
Installation with material and labour charges (incl PF)
Total impact of GST for the purpose of CTC
Firdous Construction
Shivpriya Industries
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_299373.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .