Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹67,928.51Admitted-Finance | -5.86% | ₹67,928.51 | L1 | Admitted-Finance |
| 2 | L2₹70,713.76+₹2,785.26 (4.10%)Admitted-Finance DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | -2.00% | ₹70,713.76+₹2,785.26 (4.10%) | L2 | Admitted-Finance |
| 3 | L3₹76,486.31+₹8,557.81 (12.6%)Admitted-Finance | +6.00% | ₹76,486.31+₹8,557.81 (12.6%) | L3 | Admitted-Finance |
Tender Value
₹72,000
EMD Value
₹1,440
Closing Date
5 Sept 2026, 6:00 pmClosed
XEN REW JAMMU
XEN REW JAMMU
Construction of 01 no. of Community Compost Pit at the land of Sri bodh raj s/o sh. Nikku ram ward no.2 in pyt Bansultan Lower block Miran Sahib 2026-27 and Construction of 01 no.s.Community Compost Pit at the land of sh. Ramesh kumar s/o sh. Mang
2026_RDPR_322699_2
e_NIT No. 500 -REWJ of 2026-27 dated 29-08-2026
Open Tender
Civil Works
Percentage
XEN REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹1,440
10 Sept 2026
29 Aug 2026
7 Sept 2026
29 Aug 2026
5 Sept 2026
29 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kind of soil | - | cum. | 479.3 | - |
| 2 | P/L in position Cement conc. 1 cement:5fine sand:10graded crushed stone agg. 40 mm excluding the cost of centring & shuttering all work upto plinth level. | 1 | cum. | 4,826.5 | ₹4,821.67 |
| 3 | P/L in position Cement conc. 1 cement:3fine sand:6graded crushed stone agg. 20 mm excluding the cost of centring & shuttering all work upto plinth level. | 1.59 | cum. | 5,733.6 | ₹9,116.42 |
| 4 | Centring & shuttering including strutting, propping etc. and removal of the formwork. | 12.27 | sqm. | 286.35 | ₹3,513.51 |
| 5 | Honey-comb brick work 10/11.4 cm thick with common burnt clay (non-modular) bricks of class designation 75 in superstructure above plinth level upto floor five level incement mortar 1:4 (1 cement : 4 coarse sand)including curing complete | 2.51 | sqm. | 713.1 | ₹1,789.88 |
| 6 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in
foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 4.33 | cum. | 7,571.55 | ₹32,784.81 |
| 7 | 12mm Cement plaster of mix: (1 cement :4 fine sand) | 47.4 | sqm. | 283.8 | ₹13,452.12 |
| 8 | Carriage of sand 3.0km | 2.14 | cum. | 165.84 | ₹354.9 |
| 9 | Carriage of aggregates 3.0km | 1.92 | cum. | 165.84 | ₹318.41 |
| 10 | Carriage of Bricks 3.0km | 2,058.2 | no. | 0.54 | ₹1,101.14 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
BOQ_1083784.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .