Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.0 LAccepted-AOC | ₹11.0 L | L1 | Accepted-AOC AWARDS OF CONTRACTS ITEM WISE |
| 2 | L2₹11.2 L+₹24,852.31 (2.26%)Rejected-AOC | ₹11.2 L+₹24,852.31 (2.26%) | L2 | Rejected-AOC REJECTS |
| 3 | L3₹13.2 L+₹2.2 L (19.8%)Rejected-AOC | ₹13.2 L+₹2.2 L (19.8%) | L3 | Rejected-AOC REJECTS |
| Sl No | Description | Qty | Unit | SHANKAR BHAIYAJI BORKAR L3 | Bawankar Building Materials Suppler L1 | H D CONSTRUCTION AND SUPPLIER L2 |
|---|---|---|---|---|---|---|
| 1.00Construction Items : | ||||||
| 1.01 | 80 MM METAL | 1 | Per Fut | 42 ₹44.1 | 36 ₹37.8 Lowest | 38 ₹39.9 |
| 1.02 | 40 MM METAL | 1 | Per Fut | 40 ₹42 | 35 ₹36.75 Lowest | 36 ₹37.8 |
| 1.03 | 20 MM METAL | 1 | Per Fut | 41 ₹43.05 | 38 ₹39.9 Lowest | 39 ₹40.95 |
| 1.04 | 10 MM METAL | 1 | Per Fut | 38 ₹39.9 | 32 ₹33.6 Lowest | 35 ₹36.75 |
| 1.05 | Dust | 1 | Per Fut | 25 ₹26.25 | 20 ₹21 Lowest | 21 ₹22.05 |
| 1.06 | SOFT MURUM | 1 | Per Fut | 25 ₹26.25 | 20 ₹21 Lowest | 21 ₹22.05 |
| 1.07 | HARD MURUM | 1 | Per Fut | 22 ₹23.1 | 20 ₹21 Lowest | 21 ₹22.05 |
| 1.08 | Sand (Kanhan) | 1 | Per Fut | 65 ₹68.25 | 59 ₹61.95 Lowest | 62 ₹65.1 |
| 1.09 | Sand (Local) | 1 | Per Fut | 65 ₹68.25 | 60 ₹63 Lowest | 62 ₹65.1 |
Tender Value
Refer Docs
Closing Date
4 Jul 2026, 5:00 pmClosed
SACHIV/SARPANCH
GP KAVDAS
26/27 1call Supply Of Construction Material And Water Supply Material At Gp Kavdas Ta Hingna Di Ngp
2026_NAGPU_1311941_1
GP/KAVDAS/CONS/WATER/PS/HIN/
Open Tender
Construction Works
Item Wise
365 days
KAVDAS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
16 Jul 2026
27 Jun 2026
6 Jul 2026
27 Jun 2026
4 Jul 2026
27 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction Items : | |||||
| 1.01 | 80 MM METAL | 1 | Per Fut | - | - |
| 1.02 | 40 MM METAL | 1 | Per Fut | - | - |
| 1.03 | 20 MM METAL | 1 | Per Fut | - | - |
| 1.04 | 10 MM METAL | 1 | Per Fut | - | - |
| 1.05 | Dust | 1 | Per Fut | - | - |
| 1.06 | SOFT MURUM | 1 | Per Fut | - | - |
| 1.07 | HARD MURUM | 1 | Per Fut | - | - |
| 1.08 | Sand (Kanhan) | 1 | Per Fut | - | - |
| 1.09 | Sand (Local) | 1 | Per Fut | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_2250137.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .