Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.1 LAccepted-Finance | ₹17.1 L | L1 | Accepted-Finance Lowest Bid |
| 2 | L2₹17.1 LRejected-Finance GRAM KHEMPIPRA POST SAVAREJI THANA KOTWALI JANPAD MAHARAJGANJ UTTAR PRADESH | MAHARAJGANJ | MAHARAJGANJ | UTTAR PRADESH | ₹17.1 L | L2 | Rejected-Finance Higher Bid |
Tender Value
Refer Docs
EMD Value
₹35,000
Closing Date
18 Feb 2026, 2:00 pmClosed
EXECUTIVE ENGINEER
U.P. State Construction And Infrastructure Development Corporation Ltd., Rain Basera No.2, Bismil Nagar, Opposite Veer Abdul Hameed Academy, Maharajganj (U.P.)
Vidhyak Nidhi Yojana Antargat, Vikas Khand-Nichalaul, Gram-Pipariya Me Aodwaliya Mairy Marg Se Pipariya Jane Wale Chakmarg Par 1x3m Span Ki R.C.C. Puliya Ka Nirman Karya.
2026_SCIDC_1115371_1
163/EE/Maharajganj/2025-26 Date-12.02.2026
Open Tender
Civil Works
Works
As Per NIT
2 documents required · 2 mandatory
₹1,652
Yes
U.P. SCIDCO LTD,
₹35,000
Yes
U.P. SCIDCO LTD, MAHARAJGANJ
24 Feb 2026
12 Feb 2026
18 Feb 2026
12 Feb 2026
18 Feb 2026
12 Feb 2026
13 Feb 2026
Civil work
Excavation of foundation in ordinary soil (loam, clay or sand) i/c lift upto 1.50 meter & lead upto 30 meter & i/c filling, watering & ramming of excavated earth into the foundation trenches or into space between the building & sides of foundation & disposal of surplus earth as directed by the E/I upto a distance of 30 meter from the foundation trenches.
Concrete with 40 mm Gauge Stone Ballast fine sand and cement in proportion 8:4.1 in foundation and under floor Etc.
M-150 Brick work in 1:4 cement and Coarse sand of 2.25 finess modulus) mortar in foundation & plinth inculding supply of all materials, labour, and T&P etc. required for proper completion of work.
Class M 150 Brick work in 1:4 cement and coarse sand in super structure inculding supply of all materials, labour and T&P etc complete. required for proper completion of work Upto plinth
R C C with 2cm gauge approved stone approved coarse sand and cement in the proportion of 1:1:5:3 inculding supply of materials labour and T&P etc. required for proper completion of the work.
M S Iron Work as reinforcement in RCC Work including sytraightening cutting bending placing in position and binding all complete (TMT FE 500 ISI Mark) DSR 5.22.1
12mm C plaster in dado in 1:4 with F sand Mortor i/c floatcoat of neat cement
Plain cement in 1:2:4 with cement coarse sand 20mm stone grit in wearing coat and grit in wearing coat sand copling of parapets
Contruction of weep hole
Struck Pointing With Cement and fine sand mortar consisting one part of cemenl and two part of Fine Sand including supply of all materials labour T&P required for proper completion of the wolf
Earthwork in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 indepth and also including 1.5m lift & 30m lead including but top 30 to 50 cm including hire & fuel charges of road roller and water etc required for proper complition of the work as per direction of E/l of lhe work in 2.20
BOE soIing with SOB/M-150 class bricks including prepration of sub grade lo prescribed camber and including supply of bncks filling joints with local earth including supply of all material labour T&P Complete
Cost of Signboard
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_2069434.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid