Loading…
Loading…
Tender Value
₹1.0 Cr
EMD Value
₹2.0 L
Closing Date
8 Jun 2026, 2:00 pm3d left
General Manager, UPPCL, Zone-6 Noida
K-2, Sector-116, Noida Gautambudha Nagar
Construction Work of Multipurpose Seed Store and Technology Dissemination Centre (Kisan Kalyan Kendra) at Vikas Khand Deoband in District Saharanpur
2026_UPPRC_1139055_2
02/PCL/GM/Zone-6/Noida/2026-27 Dt 18.04.2026
Open Tender
Civil Works
540 days
Deoband in District Saharanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹17,700
₹2.0 L
25 May 2026
25 May 2026
8 Jun 2026
25 May 2026
8 Jun 2026
25 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation of foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches. | - | CUM | 84.65 | - |
| 2 | Filling of carted Earth. | 1 | CUM | 288.51 | ₹288.22 |
| 3 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 kms. from the site of work and including watering, dressing etc rate to include cost of all materials labour T & P etc required for proper completion of work. | - | CUM | 357.43 | - |
| 4 | Providing and laying in cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded stone aggregate 40 mm nominal size) and curing complete,including cost of form- work,in foundation and floors. | - | CUM | 4,496.04 | - |
| 5 | Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and alround the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete | 1 | SQM | 188.12 | ₹187.93 |
| 6 | R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone grit in the proportion of 1:1.5:3 (1 cement : 1.5 coarse sand : 3 stone aggregates) in lintels of doors and windows Ground Floor | - | CUM | 6,548.28 | - |
| 7 | R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone grit in the proportion of 1:1.5:3 (1 cement : 1.5 coarse sand : 3 stone aggregates) in lintels of doors and windows First Floor | - | CUM | 6,548.28 | - |
| 8 | R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone grit in the proportion of 1:1.5:3 (1 cement : 1.5 coarse sand : 3 stone aggregates for slabs (Using 1:1.5:3(1 cement : 1.5 coarse sand : 3 stone aggregates) Mix concrete) (M-20) Ground Floor | 1 | CUM | 6,866.34 | ₹6,859.47 |
| 9 | R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone grit in the proportion of 1:1.5:3 (1 cement : 1.5 coarse sand : 3 stone aggregates for slabs (Using 1:1.5:3(1 cement : 1.5 coarse sand : 3 stone aggregates) Mix concrete) (M-20) First Floor | 1 | CUM | 6,866.34 | ₹6,859.47 |
| 10 | R.C.C. work with cement approved coarse sand and 20 mm. guage for the lighter beams i.e. having spans upto 6 m. (Using 1:1.5:3(1 cement : 1.5 coarse sand : 3 stone aggregates) Mix concrete) (M-20) Ground Floor | - | CUM | 7,253.73 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
BOQ_2161070.xls
BOQ • 0.68 MB
ReTender02seed.pdf
Tender Documents • 3.45 MB
DWG02.pdf
Additional Documents • 10.28 MB
Download all tender documents and submit your bid