| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LAccepted-Finance | L1 | Accepted-Finance BOQ Accepted | |
| 2 | L2₹7.3 L+₹58,610 (8.79%)Accepted-Finance 40 E SUNDARAVELPURAM 7TH STREET TUTICORIN 628 002 | TUTICORIN | TAMIL NADU | 628002 | L2 | Accepted-Finance BOQ Accepted | |
| 3 | Rejected-Technical | - | Rejected-Technical BQR No.1 not satisfied |
| Sl No | Description | Qty | Unit | S. MURUGAN CONTRACTOR L2 | SRI SATHYA ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for draining the dirty oil from the gear box by opening the top cover by loosening the fixing bolt and nuts. Cleaning and checking at the gear wheel teeth, slag-ness of gear wheel and checking the tightness of all the gear. After the works completed the gear box and refilling with new oil to the required quantity. Closing the gear box top cover by using fixing bolt and nut.(12.5Ton- 2 Nos& 15 Ton-1 No & 5Ton - 1No:) | 4 | Operation | 1,60,000 ₹1,88,800 | 1,46,000 ₹1,72,280 Lowest |
| 2.00 | Charges for complete removing of 15 T /12.5 T/5Ton capacity Electrical hoist from the mono rail by providing “A” frame / Derrick & chain block arrangement , loading and unloading and transporting to the workshop, erection of the Hoists after completion of the overhauling work , testing and commissioning etc. | 4 | Operation | 2,20,000 ₹2,59,600 | 1,99,000 ₹2,34,820 Lowest |
| 3.00 | Charges for dismantling of rope drum, inspection, cleaning and applying compound & re winding the steel wire rope and assembling the drum with hoist. | 4 | Operation | 60,000 ₹70,800 | 55,600 ₹65,608 Lowest |
| 4.00 | Charges for overhauling of hoist hook assembly, compensating pulleys and changing of hook pulley bearings. | 4 | Operation | 1,40,000 ₹1,65,200 | 1,34,800 ₹1,59,064 Lowest |
| 5.00 | Charges for complete overhauling of motor including dismantling , cleaning of the stator coils, checking the tightness of the stator wedges and applying one coat of insulating varnish.(12.5 Ton-2Nos & 15Ton-1No) | 3 | Operation | 45,000 ₹53,100 | 42,000 ₹49,560 Lowest |
| 6.00 | Charges for complete overhauling of motor including dismantling , cleaning of the stator coils, checking the tightness of the stator wedges and applying one coat of insulating varnish,replacement of both DE and NDE bearings and assembling( 5Ton=1No: ) | 1 | Operation | 4,000 ₹4,720 | 3,890 ₹4,590.2 Lowest |
| 7.00 | Charges for cleaning of all electrical accessories such as motor contactors, push buttons, panel etc., and checking for proper operation. | 4 | Operation | 20,000 ₹23,600 | 19,600 ₹23,128 Lowest |
| 8.00 | Fixing of Hoist system rotary geared type limit switches for lifting operation including supply of limit switches. | 3 | Operation | 40,500 ₹47,790 | 36,000 ₹42,480 Lowest |
| 9.00 | Charges for load testing of 15Ton /12.5Ton / 5Ton Electrical hoists by using test weights with the presence of the competent authority and site Engineer in-charge, loading, transporting and unloading of test weights from Switch yard-II to PCH-I area to the respective hoist and return back the test weights to Switch yard-II after completing the load test. (Necessary Transport vehicle, crane & test weights will be supplied by TNPGCL at free of cost). | 4 | Operation | 36,000 ₹42,480 | 30,000 ₹35,400 Lowest |
Tender Value
Refer Docs
EMD Value
₹7,000
Closing Date
21 Sept 2026, 2:00 pmClosed
Chief Engineer/TTPS
O/o CE/TTPS
ECHP-I- Complete overhauling and load testing of 2 Nos. 12.5 Ton, 1 No.-15 Ton and 1 No.-5 Ton electrical wire rope hoists located at PCH-I
2026_EB_701664_1
CE/TTPS/SE/MI/91/2026-2027
Open Tender
Miscellaneous Works
Works
45 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,000
Yes
25 Sept 2026
5 Sept 2026
22 Sept 2026
5 Sept 2026
21 Sept 2026
5 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for draining the dirty oil from the gear box by opening the top cover by loosening the fixing bolt and nuts. Cleaning and checking at the gear wheel teeth, slag-ness of gear wheel and checking the tightness of all the gear. After the works completed the gear box and refilling with new oil to the required quantity. Closing the gear box top cover by using fixing bolt and nut.(12.5Ton- 2 Nos& 15 Ton-1 No & 5Ton - 1No:) | 4 | Operation | 55 | ₹220 |
| 2 | Charges for complete removing of 15 T /12.5 T/5Ton capacity Electrical hoist from the mono rail by providing “A” frame / Derrick & chain block arrangement , loading and unloading and transporting to the workshop, erection of the Hoists after completion of the overhauling work , testing and commissioning etc. | 4 | Operation | 55 | ₹220 |
| 3 | Charges for dismantling of rope drum, inspection, cleaning and applying compound & re winding the steel wire rope and assembling the drum with hoist. | 4 | Operation | 55 | ₹220 |
| 4 | Charges for overhauling of hoist hook assembly, compensating pulleys and changing of hook pulley bearings. | 4 | Operation | 55 | ₹220 |
| 5 | Charges for complete overhauling of motor including dismantling , cleaning of the stator coils, checking the tightness of the stator wedges and applying one coat of insulating varnish.(12.5 Ton-2Nos & 15Ton-1No) | 3 | Operation | 55 | ₹165 |
| 6 | Charges for complete overhauling of motor including dismantling , cleaning of the stator coils, checking the tightness of the stator wedges and applying one coat of insulating varnish,replacement of both DE and NDE bearings and assembling( 5Ton=1No: ) | 1 | Operation | 55 | ₹55 |
| 7 | Charges for cleaning of all electrical accessories such as motor contactors, push buttons, panel etc., and checking for proper operation. | 4 | Operation | 55 | ₹220 |
| 8 | Fixing of Hoist system rotary geared type limit switches for lifting operation including supply of limit switches. | 3 | Operation | 55 | ₹165 |
| 9 | Charges for load testing of 15Ton /12.5Ton / 5Ton Electrical hoists by using test weights with the presence of the competent authority and site Engineer in-charge, loading, transporting and unloading of test weights from Switch yard-II to PCH-I area to the respective hoist and return back the test weights to Switch yard-II after completing the load test. (Necessary Transport vehicle, crane & test weights will be supplied by TNPGCL at free of cost). | 4 | Operation | 55 | ₹220 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_843399.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .