Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹7.0 L+₹36,112.38 (5.43%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹7.0 L+₹37,900.81 (5.70%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹7.1 L+₹45,123.29 (6.78%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹7.2 L+₹49,938.27 (7.50%)Rejected-Finance | L5 | Rejected-Finance L5 |
Tender Value
₹6.9 L
EMD Value
₹13,757
Closing Date
27 May 2026, 2:00 pmClosed
The Executive Engineer, Malda Highway Division
Singatala, Malda
Replacement of RCC railing with rectification work of approach slab Bulbulchandi end and inward slope of Ghoshpara bridge at 14.139 km of Malda Bulbulchandi road under Malda Highway Division during the year 2025-26.
2026_WBPWD_5014069_1
WBPWRD/EE/MHD/eNIT-01/2026-27
Open Tender
CIVIL WORKS
Percentage
45 days
Malda
Please refer Tender documents.
3 documents required · 3 mandatory
₹13,757
Yes
15 Aug 2026
15 May 2026
29 May 2026
15 May 2026
27 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of
masonry, cement concrete, steel work, including T&P and scaffolding wherever necessary, sorting the
dismantled material, disposal of unserviceable material and stacking the serviceable material with all
lifts and lead of 1000 m as per Technical Specifications Clause 202 for Rural Roads of MORD.
(I) By Manual Means
c) Reinforced Cement Concrete | 1 | Cu.m | 1,011 | ₹1,009.99 |
| 2 | Diagonally woven crushed bamboo mat including durma mat lining and both longitudinal and transverse intermediate stiffners (about 300 mm. centre each way) and tied with 18 B.W.G. galvanised wire fitted and fixed in position complete but excluding costof supporting frame work.
(a) In wall fencing etc | - | Sq.M | 102 | - |
| 3 | Furnishing and Placing Reinforced / Pre-stressed Cement concrete in Super-structure with coarse
aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement and admixtures, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete as per drawing and technical specification including the cost of necessary form work and staging complete. as per drawing and technical specifications.
C RCC Grade M 30
I. Using Concrete Mixer: a) Height upto 5m | - | Cu.m | 6,637.48 | - |
| 4 | Supplying, fitting and placing HYSD bar reinforcement in Bridge Super-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications. | 1 | M.T. | 63,429.75 | ₹63,366.32 |
| 5 | Welding by gas / electric plant including transportation of welding plant at site including cutting, forging & drilling to required shape. | - | Cu.m | 1.8 | - |
| 6 | Painting the vertical end faces of posts, wheel guards or railing or parapet with alternate bands of different colours as directed by the Engineer-in-charge with approved synthetic enamel paint.
b) Two Coats | 1 | Sq.M | 99 | ₹98.9 |
| 7 | Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC.
In Ground Floor:
(b) Two Coat | 1 | Sq.M | 45.1 | ₹45.05 |
| 8 | Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer's specification and as per direction of Engineer-in-Charge to be applied over acrylic primer as required. The
rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer.
In Ground floor (Two Coat)
a) Normal Acrylic Emulsion | 1 | Sq.m | 67 | ₹66.93 |
| 9 | Cleaning and removing conservancy garbage mixed with rubbish & other filthy materials from the road side flank, drain and compound including cutting, loading, unloading to and from truck or cart by Mathor labour & removing the same to any distance. | - | Cu.m | 56.62 | - |
| 10 | Earthwork in excavation from borrow pits (land owned/arranged by the Department) and depositing
in layers of 250 mm. including breaking clods in embankment works and to fill up back of abutments,
depressions and ruts with an initial lead up to 50 m and initial lift up to 1.5 m making bunds at top as directed
dressing complete. (Borrow pit measurement).
(i) In ordinary soil
Extra for every additional lift of 1.5 m or part thereof in all kind of soil. (Borrow pit measurement) | - | Cu.m | 99.9 | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
Form2911.pdf
Tender Documents • 0.29 MB
BOQ_5081994.xls
BOQ • 0.35 MB
OID.pdf
Additional Documents • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .