Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC | ₹1.7 Cr | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹1.7 Cr+₹2.2 L (1.30%)Rejected-Finance | ₹1.7 Cr+₹2.2 L (1.30%) | L2 | Rejected-Finance due not lowest one |
| 3 | L3₹1.7 Cr+₹3.0 L (1.80%)Rejected-Finance | ₹1.7 Cr+₹3.0 L (1.80%) | L3 | Rejected-Finance due not lowest one |
Tender Value
₹1.7 Cr
EMD Value
₹3.3 L
Closing Date
10 Jan 2022, 5:00 pmClosed
Superintending Engineer, Central Circle,PHE Dte.
Purta Bhawan, 2nd Floor, Sadarghat, Sripally, Burdwan.
Augmentationof Kharsari Piped WS scheme withLDS RisingmainConstruction of switch room without ws toiletconstruction repairing of boundarywall switch roomwithFHTC work at ChanditalaIIBlock of HooghlyDist under Hooghly DivnPHEDte.
2021_PHED_356381_1
WBPHED/15/HUG of SE/CC of 21-22
Open Tender
CIVIL WORKS
Percentage
180 days
Chanditala-II Block Hooghly.
Please refer Tender documents.
8 documents required · 8 mandatory
₹3.3 L
Yes
2 Feb 2022
16 Dec 2021
12 Jan 2022
16 Dec 2021
10 Jan 2022
18 Dec 2021
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .