Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAccepted-Finance | ₹3.3 L | L1 | Accepted-Finance Selected in Lottery |
| 2 | L1₹3.3 LRejected-Finance | ₹3.3 L | L1 | Rejected-Finance Not Selected in Lottery |
Tender Value
₹3.8 L
EMD Value
₹38,410
Closing Date
14 Aug 2026, 3:00 pmClosed
Chief Engineer, KNN
Chief Engineer Office, KNN, Motijheel.
Repair and painting work on the first floor of the Primary Health Centre located at Tuti Masjid in Jawahar Nagar under Ward-05, Zone-04.
2026_NNKAN_1175397_1
206/AA-4/26-27
Open Tender
Civil Works
Percentage
30 days
ward-05
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹38,410
21 Sept 2026
7 Aug 2026
14 Aug 2026
7 Aug 2026
14 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling existing plaster including disposal of refuse as directed by Engineer-In-Charge within a distance of 60 meters. Dismantling existing plaster including disposal of refuse as directed by Engineer-In-Charge within a distance of 60 meters. | 1 | sqm | 45 | ₹44.96 |
| 2 | 12mm cement plaster 1:3 (1 cement : 3 coarse sand) finished with a floating coat of neat cement. 12mm cement plaster 1:3 (1 cement : 3 coarse sand) finished with a floating coat of neat cement | 1 | sqm | 257 | ₹256.74 |
| 3 | Finishing walls with Putty approved brand and manufacture and of required shade on undacorated wall surface Finishing walls with Putty approved brand and manufacture and of required shade on undacorated wall surface to give even shade over including curing and cost of all material, labour, T&P etc. required for proper completion of work | - | sqm | 135 | - |
| 4 | Finishing walls with exterior emulsion paint (Apex) Finishing walls with exterior emulsion paint (Apex) of approved brand and manufacture and of required shade on undacorated wall surface to give even shade over @ 1.25 Ltr/l0sqm including one coat of primer applld @ 0.75Ltr/10sqm coat curing and cost of all material, labour, T&P etc. required fororooer comoletlon of work.for two coat | - | sqm | 132 | - |
| 5 | Providing and Fixing of 1/2 x 24 gauge Murga jali etc all complete. Providing and Fixing of 1/2 x 24 gauge Murga jali etc all complete. | 1 | sqm | 55 | ₹54.99 |
| 6 | Scrapping old white or colour wash including disposal of refuse as directed by Engineer-In-charge within a distance of 60 meters (200 feet) Scrapping old white or colour wash including disposal of refuse as directed by Engineer-In-charge within a distance of 60 meters (200 feet) | 121.56 | sqm | 14 | ₹1,701.84 |
| 7 | Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying: (a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. (b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of Joints of fibre cloth should not be less than 10 cm. (c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. (d) fourth and final layer of brick tiling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured." "Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying:(a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm.(b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of Joints of fibre cloth should not be less than 10 cm.(c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around.(d) fourth and final layer of brick tiling with cement mortar (which will be paid for separately.For the purpose of measurement the entire treated surface will be measured." | - | sqm | 387 | - |
| 8 | DISTEMPERING-Painting on iron work with one coat of priming coat and two coat with superior synthetic enamel including supply of all material etc all comp. Painting on iron work with one coat of priming coat and two coat with superior synthetic enamel including supply of all material etc all comp | 0.9 | sqm | 103 | ₹92.7 |
| 9 | Tile work in skirting risers of steps and dado up to 2m height over 12mm thick bed of cement mortar 1:3 (1 cement : 3coarse sand) 8mm thick Tile work in skirting risers of steps and dado up to 2m height over 12mm thick bed of cement mortar 1:3 (1 cement : 3coarse sand) 8mm thick etc all comp | 18.84 | sqm | 975 | ₹18,369 |
| 10 | Providing and laying Vitrified tiles In different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % Size of TIie 600x600 mm Providing and laying Vitrified tiles In different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, In all colours & shade, In skirting. riser of steps, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), Jointing with grey cement slurry @ 3.3 kg/ sqm including grouting the init with white cement & matching pigments etc. complete. | - | sqm | 1,024 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_2208853.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.22 MB
BOQ_2208853.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .