| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹65.2 LAdmitted-Finance PAC MUKAND VIHAR COLONY RAMGHAT ROAD ALIGARH U P 202001 | ALIGARH | UTTAR PRADESH | 202001 | -1.91% | ₹65.2 L | L1 | Admitted-Finance |
| 2 | L2₹66.1 LAdmitted-Finance | -0.55% | ₹66.1 L | L2 | Admitted-Finance |
| 3 | L3₹66.1 LAdmitted-Finance 1 217 RAWANTEELA SANJAY GANDHI COLONY ALIGARH | -0.50% | ₹66.1 L | L3 | Admitted-Finance |
Tender Value
₹66.5 L
EMD Value
₹1.3 L
Closing Date
7 Feb 2026, 12:00 pmClosed
VC ADA
ADA office Ramghat Road Aligarh
Construction of a crematorium at plot number 328B near the Transport Nagar scheme.
2026_ALIDA_1106488_47
5410
Open Tender
Civil Works
aligarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
Yes
VC ADA
₹1.3 L
Yes
6 Mar 2026
16 Jan 2026
7 Feb 2026
16 Jan 2026
7 Feb 2026
16 Jan 2026
Earth work in excavation in foundation trenches in ordinary soil(Loam, Clay or Sand) including laft upto 1.50 M and lead up to 30m and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the side of the foundation trenches ot into the plinth and rewmoval and disposal of surplus Earth as directed by the engineer-in-charge up to a distance of 30m from the foundation trenches.SI No 251 page 25
Cement Concrete with 4 cm. gauge stone ballast, fine sand of 1.25 F.M. & cement in proportion of 10:5:1 in foundation & under floors including supply of all materials. labour. Tools & plants etc. required for proper completion of the work SI NO 274 SOR 2022 page 27
Providing and laying in position specified grade of reinforcement cement concrete, including the cost of centering shuttering finishing and excluding reinforcement All upto plinth level 1:1.5:3 (1Cement:1.5Coarse sand:3Stone Aggregate 20mm nominal size) for Footing UPPWD SOR 2022 SI no 5.1.2
RCC Work in walls including attacked Pilasters buttresses plinth and string course fillet column pillar piers abutments posts and struts etc.including cost of centering shuttering finishing and excluding Reinforcement with 1:1.5:3 (1Cement:1.5Coarse sand:3Stone Aggregate 20mm nominal size) for Column UPPWD SOR 2022 SI no 5.3
Brick work with common burnt clay F.P.S (non modular) bricks of class Mdesignation -100 class brickwork 1:6 Cement and Coarse sand for foundation and Plinth UPPWD SOR 2022 SI no 6.1.2 page 30
RCC Work in walls including attacked Pilasters buttresses plinth and string course fillet column pillar piers abutments posts and struts etc.including cost of centering shuttering finishing and excluding Reinforcement with 1:1.5:3 (1Cement:1.5Coarse sand:3Stone Aggregate 20mm nominal size) for Plinth Beam UPPWD SOR 2022 SI no 5.2.2
M.S. (tor steel or plain) in plain work such as R.C.C. Or R.B. Work including bending for proper shape & including supply of steel & its wastage, bend, hooks and authorised overlaping shall be measured and including cost of binding wire 16 mm dia bar used (8mm to 16 mm)
Earthwork in filling or in embankment in ordinary soil. including cartage or earth from 8 Km any where out side the limit of regulated area distance and including loading unloading of earth etc. required for proper completion of the work.Approved Rate
Brick work with common burnt clay F.P.S (non modular) bricks of class designation -100 class brickwork 1:6 Cement and Coarse sand for foundation and Plinth UPPWD SOR 2022 SI no 6.4.2 page 30
RCC Work with for Beam suspended floor roof having slope upto 15 degree landing balconies shelves chajjas lintels band plain window sill staircase and spiral stair cases above plinth level upto floor five level including the cost of centering shuttering finishing and excluding reinforcement with 1:1.5:3(1Cement:1.5Coarse sand:3Stone Aggregate 20mm nominal size) for UPPWD SOR 2022 SI no 5.3 (LINTELS)
RCC Work with for Beam suspended floor roof having slope upto 15 degree landing balconies shelves chajjas lintels band plain window sill staircase and spiral stair cases above plinth level upto floor five level including the cost of centering shuttering finishing and excluding reinforcement with 1:1.5:3(1Cement:1.5Coarse sand:3Stone Aggregate 20mm nominal size) for BEAM UPPWD SOR 2022 SI no 5.3
RCC Work with for Beam suspended floor roof having slope upto 15 degree landing balconies shelves chajjas lintels band plain window sill staircase and spiral stair cases above plinth level upto floor five level including the cost of centering shuttering finishing and excluding reinforcement with 1:1.5:3(1Cement:1.5Coarse sand:3Stone Aggregate 20mm nominal size) for COLUMN UPPWD SOR 2022 SI no 5.3
RCC Work with for Beam suspended floor roof having slope upto 15 degree landing balconies shelves chajjas lintels band plain window sill staircase and spiral stair cases above plinth level upto floor five level including the cost of centering shuttering finishing and excluding reinforcement with 1:1.5:3(1Cement:1.5Coarse sand:3Stone Aggregate 20mm nominal size) for SLAB UPPWD SOR 2022 SI no 5.3
M.S. (tor steel or plain) in plain work such as R.C.C. Or R.B. Work including bending for proper shape & including supply of steel & its wastage, bend, hooks and authorised overlaping shall be measured and including cost of binding wire 16 mm dia bar used (8mm to 16 mm)
M S Iron Work for grill balcony and staircase railing of approved quality and drawing including supply of all material fabrication labour T&P etc in all respect as per direction of Engineer-In-Charge for proper completion of work. UPPWD SOR 2022 SI no 16new page 44
12mm thick cement plaster on brick work with cement mortar of mix 1:4 (1cement:4Coarse sand) UPPWD SOR 2022 SI no 584 (ii)page 55
15mm thick cement plaster on rough side og single or half brick wall with cement mortar of mix 1:4 (1cement:4Coarse sand) UPPWD SOR 2022 SI no 2new page 55
Supply and Fixing of S.S Mosquito proof heavy quality iron wire gauge or expanded metal heavy quality over window and including supply of C.P teak wood batten 8cmx1cm flat iron 25mm x 4mm and including supply of necessary screw all material labour totl and plant etc required for proper completion of work. UPPWD SOR 2022Page 35 SI No 455(a)
Providing and laying vitrified floor tiles in different sizes with water absorption less than 0.8% and confirming to IS: 15622, of approved make in all colours and shades laid on 20mm thick cement motar 1:4 (1 cement: 4 coarse sand ), jointing with grey cement slurry @ 3.3 kg/ sqm including grouting the joints with white cement and matching pigments etc, complete.With Base page 59
Providing and Laying "Brick Coba" 12mm thick laid with M-100 class brick bat coba 7.50cm thick with gap of 15mm to each other over 20mm thick base of cement mortar 1:4 cement and coarse sand mixed with water proofing compound spreding cement slurry mixed with acrelic cement concrete water proofing compound in1:4 cement and coarse sand mortar finished smooth and top mashed false squre 30cmx30cm and side wall parapet shall be mono tythic plaster wall upto 30cm higher and junction and corner shall be rounded by brick ballast cement and coarse sand masonry coba with top finished plaster mixed with acetic water proofing compound @ 2% by weight and including supply of all material labour T&P etc complete for proper completion of work.UPPWD SOR 2022 Page 46
Providing and Applying white cement based putty of average thickness 2 mm of approved brand and manufacture, over the plastered wall surface to prepare the surface even and smooth complete including cost of all material Labour T&P etc. Complete required for proper completion of the work.SINo 13.80 UPPWD SOR 2022 Page 61
Painting two coat or including preparing the surface by thoroughly clearing the surface of all dirt dust and scrapping and papering Including cost of all material labour T&P etc required for proper completion of work.UPPWD SOR 2022 SI no (2New+3New)(33+80)=113 Page 61
Distempering with oil bound distemper (first coat including priming coat)of approved brand and manufacture on undercoated wall surface to give an even surface including supply of all material labour and T&P etc required for proper completion of work.UPPWD SOR 2022 SI No (649+2x650)Page 62
Finishing wall (Two Coat ) with exterior paint (Apex) of approved brand and manufacture and of required shade on undercoated wall surface to give even shade including one coat of primer applied curing cost of all material labour T&P etc.UPPWD SOR 2022 SI No 21new Page 63
Electrical Works
Point Wiring in PVC Conduit, with Modular Type Switch Wiring Point for Light with 1.5 Sq.mm
Wiring Point for Fan/Fresh Air Fan
Wiring Point for Plug with 1.5 Sq.mm.
Suuply & Fixing Power Plug With
Supply & Fixing of Switch Box Made 175x100x65 mm Size
Supply & Wiring of circuit wiring with two number 2.5 Sq.mm. FRLSH PVC
Supply & Wiring of circuit wiring with two number 4 Sq.mm. FRLSH PVC
Supplying And Fixing of 6Amp to 32 Amp SP MCB (10KA) C Curve
Supply & Fixing/Flush Mountain 8 Way SPN Distribution Board
Supply & Fixing of Fan Box With hexagonal Side of
Supply of Ceiling Fan mototr of A.C Permanent insulation, capacitor rating confirming BEE 5 Star rating and IS:374/79 and also comply with IS:1709/1984 with latest amendment. The rated voltage 220/240 volts,50Hz,1-ph AC the fan assemble should consist of down rod blades, shackle canopies etc and with double ball bearing system (BEE 4 Star rated-1200mm Sweep) SI No 1501(ii) (ELECTRICAL WORKS )
Supply And Fixing of LED Tube Light1x22 watt, 2200 system lumens 100lm/watt PF>0.95 THD<10%,CRI>80,Tube with aluminium heat with 3 year warrantee with polycarbonate tube light complete including tube suitable for both surface and suspended complete in all respect. SI No 1413 (ii) (ELECTRICAL WORKS)
Earth work in excavation in foundation trenches in ordinary soil(Loam, Clay or Sand) including laft upto 1.50 M and lead up to 30m and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the side of the foundation trenches ot into the plinth and rewmoval and disposal of surplus Earth as directed by the engineer-in-charge up to a distance of 30m from the foundation trenches.SI No 251 UPPWD SOR-2022
Cement concrete with 4cm gauge stone ballast, fine sand of 1.25 F.M & cement in propotion of 8:4:1 in foundation & under floors including supply of all materials , labour, tools & plants etc. Required for proper completion of the work SI No 275(a) UPPWD SOR-2022
Brick work with common burnt clay F.P.S (non modular) bricks of class Mdesignation -100 class brickwork 1:4 Cement and Coarse sand for foundation and Plinth UPPWD SOR 2022 SI no 6.1.1 page 30
Concrete with 2 cm. Gauge approved stone ballast, coarse sand and cement in foundation and under floors in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. Required for proper completion of the work.SI No. 279 SOR 2022
Construction of Granular Sub Base by providing close graded material spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to acheive the desired density complete As per MORTH Specification 401/SI No 4.1
Laying of 80mm I-shaped precast Interlocking tiles of thickness 80 mm.(Compressive strength not less than 30Mpa and weight 4.50 kg ) including 25 mm thick local sand base levelling and dressing of surface to required level and slope filling joint with local sand all complete work.UPPWD SOR-2022 page 70
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.68 MB
BOQ_2041776.xls
BOQ • 0.29 MB
DOC_RFP.pdf
Tender Documents • 9.37 MB
Download all tender documents and submit your bid