Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹91.1 LAccepted-AOC NO 45D KONDAPPANAYANPALLI VILLAGE BARGUR POST BARGUR TALUK KRISHNAGIRI 635 104 | BARGUR | KRISHNAGIRI | TAMIL NADU | 635104 | L1 | Accepted-AOC Admitted | |
| 2 | L2₹91.2 L+₹12,097.22 (0.13%)Rejected-AOC | L2 | Rejected-AOC Rejected |
Tender Value
₹92.3 L
EMD Value
₹93,000
Closing Date
28 Jun 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Addl. Collector (Dev.) / PD DRDA KRISHNAGIRI
DRDA KRISHNAGIRI
Strengthening of the road from Bargur-Jagadevi road to A.Nagamangalam Km 0/0-1/6 (R-40) in Bargur Block of Krishnagiri District under Mudhalvarin Grama Salaigal Membattu Thittam 2022-23 Package No TN 04 KRI 116
2023_RDTN_329740_1
RocNo_1433_2023_R3_04_06_2023
Open Tender
Civil Works - Roads
Item Rate
180 days
Bargur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹93,000
DRDA KRISHNAGIRI
11 Aug 2023
19 Jun 2023
28 Jun 2023
19 Jun 2023
28 Jun 2023
19 Jun 2023
20 Jun 2023
Amount
1.Strengthening of the road from Bargur-Jagadevi road to A.Nagamangalam Km 0/0-1/6 (R-40)- Rs.92.250 Lakhs
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B
Picking 5cm to 10cm Old Metalled Surface and Sectioning -1 Sqm
Providing and Laying Gravel to 100mm Compacted thick including cost & conveyance of Gravel From Approved sources to work site including labour for Spreading, watering and comp-acting by power roller to achieve the required proctor density at 100 % compaction.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WBM/WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WBM/ WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminous Macadam (BM) With 50mm compacted thickness which work shall consist of construction in a single course of compacted crouched aggregates premixed with bituminous binder 60/70 grade at grade at the requirement of 3.5 present by weight of the accordance with the drawing or as directed by the engineer in charge for advance patches using central hot mix plant as per MORT & H 504 (Using Plastic Waste)
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Provision for Rumble Strips with hot applied Themoplastic compound with reflecorining glass beads in bituminous surface
Rumble strip ch 5mt
Rumble strip ch 1500
Rumble strip ch 1600
Provision for Cautionary Sign Board 60cm size
Provision for Citizen Information board & Name Board
Provision for K.M Stone
Provision for H.M Stone
MAINTANANCE
For 1st year maintenance
For 2nd year maintenance
For 3rd year maintenance
For 4th year maintenance
For 5th year maintenance
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
K Sundaramoorthy
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .