Loading…
Loading…
Tender Value
₹41.5 L
EMD Value
₹83,000
Closing Date
10 Jul 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
DRM WA
14 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
(a)(a) The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender. (b)(b) (i)In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note: for b (i) separate completed works of minimum required values shall also be considered for fulfilment of technical eligibility criteria for different components. (b)(ii)In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity.
(b) (iii) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contract or through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarized, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfilment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract, with prior approval of Chief Engineer in writing. Note for Item 10.1: Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. organization, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
2 conditions
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
I/ We have visited the works site and I / We am / are aware of the site conditions.
Infrastructure Enhancement of Satellite Track Machine Depot, BKI/JP with the provision of staff facilities.
ENGG-JP-2026-27-54
ENGG-JP-2026-27-54
Open
Works - General
6 Months
Jaipur, Rajasthan
₹0
₹83,000
10 Jul 2026
15 Jun 2026
26 Jun 2026
24 items across 1 schedule · ₹31,74,914.06 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | All kinds of soil | cum | 100 | 177.5 | 17,750 |
| 2 | All kinds of soil. | cum | 20 | 260.3 | 5,206 |
| 3 | 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | cum | 12 | 7,294.7 | 87,536.4 |
| 4 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | cum | .5 | 9,045.75 | 4,522.88 |
| 5 | Foundations, footings, bases of columns, etc. for mass concrete | Sqm | 24 | 392.15 | 9,411.6 |
| 6 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | Sqm | 244 | 842.5 | 2,05,570 |
| 7 | Suspended floors, roofs, landings, balconies and access platform | Sqm | 209 | 927.25 | 1,93,795.25 |
| 8 | Thermo-Mechanically Treated bars of grade Fe- 500D or more. | Kg | 3550 | 107.85 | 3,82,867.5 |
| 9 | Thermo-Mechanically Treated bars of grade Fe- 500D or more. | Kg | 4550 | 107.85 | 4,90,717.5 |
| 10 | Concrete of M25 grade with minimum cement content of 330 kg /cum | cum | 35.5 | 9,504.75 | 3,37,418.63 |
| 11 | Concrete of M25 grade with minimum cement content of 330 kg /cum | cum | 40.5 | 9,860.4 | 3,99,346.2 |
| 12 | Cement mortar 1:6 (1 cement : 6 coarse sand) | cum | 10 | 9,105.95 | 91,059.5 |
| 13 | Cement mortar 1:6 (1 cement : 6 coarse sand) | cum | 10 | 7,311.25 | 73,112.5 |
| 14 | Area of slab upto 0.50 sqm | Sqm | 15 | 5,413.5 | 81,202.5 |
| 15 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | Kg | 2000 | 133.7 | 2,67,400 |
| 16 | Hot finished seamless type tubes | Kg | 200 | 206.35 | 41,270 |
| 17 | In stringers, treads, landings etc. of stair cases, including use of chequered plate wherever required, all complete | Kg | 200 | 123.6 | 24,720 |
| 18 | In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | Kg | 1000 | 172.6 | 1,72,600 |
| 19 | Dark shade pigment using ordinary cement | Sqm | 50 | 1,442.15 | 72,107.5 |
| 20 | 110 mm diameter | Metre | 10 | 377.4 | 3,774 |
| 21 | Two or more coats on new work | Sqm | 243 | 155.9 | 37,883.7 |
| 22 | 20 mm nominal dia Pipes | Metre | 50 | 537.6 | 26,880 |
| 23 | 32 mm nominal dia Pipes | Metre | 200 | 739.3 | 1,47,860 |
| 24 | 15 mm nominal bore, 98 mm long, weighing not less than 75 gms | Each | 8 | 112.8 | 902.4 |
| Schedule total | ₹31,74,914.06 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
54-STD.pdf
ATTACHMENT
54-ASC.pdf
ATTACHMENT
GCC 2022
ATTACHMENT
ACS01to11_compressed1.pdf
ATTACHMENT
HQletterforbrandmaterialofworks.pdf HQ letter for brand material
ATTACHMENT
CableCutscircular_compressed.pdf
ATTACHMENT
10.GCC-2022-ACS10-updated_compressed.pdf
ATTACHMENT
HQletterforbrandmaterialofworks.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .