| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance 646 SECTOR 4 PANCHKULA | PANCHKULA | HARYANA | 133301 | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.1 Cr+₹4.3 L (3.87%)Admitted-Finance MAIN STREET GONDER 35 VILL GONDER KARNAL HARYANA 132024 | KARNAL | KARNAL | HARYANA | 132024 | ₹1.1 Cr+₹4.3 L (3.87%) | L2 | Admitted-Finance |
| 3 | L3₹1.2 Cr+₹8.2 L (7.46%)Admitted-Finance 0 DHANA TEJA BARARI DHANA TEJA MATHURA MATHURA UTTAR PRADESH 281005 | MATHURA | UTTAR PRADESH | 281005 | ₹1.2 Cr+₹8.2 L (7.46%) | L3 | Admitted-Finance |
| 4 | L4₹1.3 Cr+₹15.8 L (14.4%)Admitted-Finance | ₹1.3 Cr+₹15.8 L (14.4%) | L4 | Admitted-Finance |
| 5 | L5₹1.3 Cr+₹19.5 L (17.8%)Admitted-Finance 1036 B STREET 11 PATEL NAGAR GURGAON HARYANA 122001 | GURUGRAM | HARYANA | 122001 | ₹1.3 Cr+₹19.5 L (17.8%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | S.K. CONSTRUCTION L3 | A TECH BUILDERS L1 | R K AND CO L5 | Classicon Projects India Pvt. Ltd. L4 | Vipul Constructions L6 | Pavee Construction L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to CHIAL premisses dumping ground for lead upto 1 km for all lifts, complete as per directions of Engineer-in-charge. | 465 | Cum | 145 ₹67,425 | 149 ₹69,285 | 270 ₹1,25,550 | 600 ₹2,79,000 | 180 ₹83,700 | 100 ₹46,500 Lowest |
| 2.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.
a) All kinds of soil | 610 | Cum | 115 ₹70,150 | 119 ₹72,590 | 144 ₹87,840 | 180 ₹1,09,800 | 140 ₹85,400 | 100 ₹61,000 Lowest |
| 3.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 310 | Cum | 105 ₹32,550 | 144 ₹44,640 | 126 ₹39,060 | 130 ₹40,300 | 160 ₹49,600 | 70 ₹21,700 Lowest |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
a) 1:4:8 (1 Cement : 4 coarse sand (zone-lll) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 30 | Cum | 4,865 ₹1,45,950 | 4,200 ₹1,26,000 | 5,400 ₹1,62,000 | 4,800 ₹1,44,000 | 4,800 ₹1,44,000 | 3,250 ₹97,500 Lowest |
| 5.00 | Centering and shuttering including strutting, propping etc. and removal of form for
a) Foundations, footings, bases of columns, etc. for mass concrete | 430 | Sqm | 185 ₹79,550 Lowest | 349 ₹1,50,070 | 270 ₹1,16,100 | 350 ₹1,50,500 | 350 ₹1,50,500 | 200 ₹86,000 |
| 6.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
a) 1:1.5:3 (1 cement : 1.5 coarse sand (zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 270 | Cum | 6,820 ₹18,41,400 | 5,000 ₹13,50,000 | 6,660 ₹17,98,200 | 6,500 ₹17,55,000 | 6,500 ₹17,55,000 | 4,500 ₹12,15,000 Lowest |
| 7.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
a) Thermo-Mechanically Treated bars of grade Fe-500D or more. | 29,700 | Kg | 78 ₹23,16,600 | 82 ₹24,35,400 | 81 ₹24,05,700 | 78 ₹23,16,600 | 72 ₹21,38,400 | 70 ₹20,79,000 Lowest |
| 8.00 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 8,930 | Kg | 95 ₹8,48,350 | 90 ₹8,03,700 | 99 ₹8,84,070 | 92 ₹8,21,560 | 88 ₹7,85,840 Lowest | 100 ₹8,93,000 |
| 9.00 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position including welding and bolted with special shaped washers etc. complete.
a) Hot finished welded type tubes | 17,510 | Kg | 105 ₹18,38,550 | 102 ₹17,86,020 Lowest | 108 ₹18,91,080 | 120 ₹21,01,200 | 110 ₹19,26,100 | 130 ₹22,76,300 |
| 10.00 | Providing and fixing mild steel round holding down bolts with nuts and washer plates complete. | 18,750 | Kg | 115 ₹21,56,250 | 90 ₹16,87,500 | 99 ₹18,56,250 | 100 ₹18,75,000 | 88 ₹16,50,000 | 75 ₹14,06,250 Lowest |
Tender Value
₹1.5 Cr
EMD Value
₹4.6 L
Closing Date
2 Jun 2026, 6:00 pmClosed
Senior Manager (Engg-C)
Engineering Office, Chandigarh International Airport Limited
Provision of Canopy at Entry and Exit of basement and other locations inside operational area at Chandigarh International Airport Limited.
2026_AAI_277215_1
CHIAL/ENGG(C)/Canopy/2026
Open Tender
Civil Works
Item Rate
Chandigarh International Airport Limited
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Chandigarh International Airport Limited
₹4.6 L
8 Jul 2026
12 May 2026
3 Jun 2026
13 May 2026
2 Jun 2026
13 May 2026
13 May 2026 - 19 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to CHIAL premisses dumping ground for lead upto 1 km for all lifts, complete as per directions of Engineer-in-charge. | 465 | Cum | 1.25 | ₹581.25 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.
a) All kinds of soil | 610 | Cum | 1.25 | ₹762.5 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 310 | Cum | 1.25 | ₹387.5 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
a) 1:4:8 (1 Cement : 4 coarse sand (zone-lll) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 30 | Cum | 1.25 | ₹37.5 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for
a) Foundations, footings, bases of columns, etc. for mass concrete | 430 | Sqm | 1.25 | ₹537.5 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
a) 1:1.5:3 (1 cement : 1.5 coarse sand (zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 270 | Cum | 1.25 | ₹337.5 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
a) Thermo-Mechanically Treated bars of grade Fe-500D or more. | 29,700 | Kg | 1.25 | ₹37,125 |
| 8 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 8,930 | Kg | 1.25 | ₹11,162.5 |
| 9 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position including welding and bolted with special shaped washers etc. complete.
a) Hot finished welded type tubes | 17,510 | Kg | 1.25 | ₹21,887.5 |
| 10 | Providing and fixing mild steel round holding down bolts with nuts and washer plates complete. | 18,750 | Kg | 1.25 | ₹23,437.5 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
NIT.pdf
Tender Documents • 7.30 MB
BOQ_323832.xls
BOQ • 0.33 MB
Corrigendum1.pdf
PDF • 0.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .