Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance THE UNIVERSE 3RD FLOOR OFFICE BLOCK SARBAPALLY NEAR EASTERN BYPASS SILIGURI WEST BENGAL 734008 | SILIGURI | DARJEELING | WEST BENGAL | 734008 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical Non Responsive |
Tender Value
Refer Docs
EMD Value
₹36 L
Closing Date
15 Jun 2024, 2:30 pmClosed
Chief Engineer cum Nodal Officer - ADB
Top Floor, Power Department Sikkim, Power Secretariat, Kazi Road, Gangtok, Sikkim-737101
Turnkey Contract for LT Network Renovation and Augmentation and Pkg3-Lot1(PCE-1 Soreng and Geyzing District)
2024_PDAT_738_1
CE/HQ/ADB/Pkg3/Lot1-2023-24
Global Tenders
Power/Energy Projects/Products
1080 days
Soreng and Geyzing District
Please refer Tender documents.
5 documents required · 5 mandatory
₹25,000
PCE-cum-Secretary, Power Dept
₹36 L
Top Floor, Power Department Sikkim,
15 Nov 2024
8 Mar 2024
15 Jun 2024
8 Mar 2024
15 Jun 2024
23 Mar 2024
22 Mar 2024
Schedule A1 : Schedule of Quantities for 11/0.433 kV Distribution Transformer (Non-Sealed Type) - 750 kVA, 500 kVA, 315 KVA, 250 KVA
DISTRIBUTION TRANSFORMER (NON-SEALED TYPE), 11/ 0.433 KV, Dyn 11, Copper Wound (3 phase), ONAN COOLED, OUT-DOOR TYPE WITH OFF-CIRCUIT TAPPINGS OF +5% TO -10% IN STEPS OF 2.5% ON H.V SIDE, PROVIDED WITH STANDARD FITTINGS & ACCESSORIES WITH FIRST FILLING OF TRANSFORMER OIL CONFORMING TO IS:1180 (PART-I)2014 : ENERGY EFFICIENCY LEVEL -2
INCOMING:- No. 800 Amp, 415 Volt, FP, manually Draw Out type ACB with in built Thermo Magnetic Release & 6No+6Nc Auxiliary contacts. Outgoing:- 3 Nos. 200 Amp TP MCCB breaking capacity 35 KA , 1 No. 100 Amp TP MCCB breaking capacity 35 KA & 1 No. 63 Amp. TP MCCB breaking capacity 35 KA, all with built in Thermo Magnetic Release
INCOMING: 1 No. 630 A, 4P,50KA, MCCB OUTGOING: 3 Nos. 200A TP MCCB, 50 KA & 1 No. 63A TP MCCB, 35 KA all with built in Thermo Magnetic Release.
INCOMING: 1 No. 400 A, 4P,50KA, MCCB OUTGOING: 1 No. 200A TP MCCB, 50 KA ,2 Nos. 100A TP MCCB, 35 KA & 1 No. 63A TP MCCB, 35 KA, all with built in Thermo Magnetic Release.
11 KV, 3 Pole 400 amp, Air Break Gang Operated Switch (G.O.S) tilting type, three insulator per phase, complete with all fittings confirming to IS: 9920 & IS: 9921 Raychem RPG make or equivalent
11 KV, 3 Pole, 400 amp. Drop-out Fuse (D.O.F Unit) complete with all accessories including fuse element rated for transformer capacity confirming to IS: 9385 Raychem RPG make or equivalent
11 kV, 3 X 35 sq.mm Cu / XPLE Cable
Heat Shrinkable Outdoor type end termination kit for 11 KV (E) 3 core XLPE (Kit No.EOKT 3091-3131) Raychem make or equivalent : 3 C X 35 sqmm
9 Mtrs. Steel lattice structure of 35x35x6mm M.S Angle complete with nuts & bolts conforming to specification of design detail No. 2/L/FT/E&PD/ 9 Mtrs.
G.I. channel 75X40X4.8mmX2.2 m long for DP.
Back clamps of 50x8mm G.I. flat for holding channel.
G.I. nuts & bolts of 16mm dia.X 40mm length.
9 KV, 10 KA Single pole unit Metal Oxide Gapless Surge Arrestor with earth lead disconnector, bird protection cap and mounting brackets. for 11 KV, 50 c/s solidly earthed neutral system confirming to IS:3070 (Part III) Raychem RPG make or equivalent
SAFE EARTHING MODEL T-19 SHORT CURRENT 20KA RMS FOR 1 SEC(LV / MV) APPLICATION CONFORMING TO IS: 3043: 50 mm diameter x 2 mtrs. Electrode (Copper bonded) & One bag backfill chemical compound.
G.I. strip 25x6 mm. for earthing
1.1 kV 1Cx240 sqmm, Cu/XLPE/PVC (DTR to LT D-Board Incomer) (2 cables /cct for 750 / 500 KVA, 1 cable/cct for 315/250 KVA)
Tinned Copper Lugs - 240 sqmm
AAAC Rabbit Conductor (for down wires)
Al Line Tap / PG Clamp, Double Bolt, 25-150 sqmm
Red oxide paint @ 1.5 ltr/ pole
Aluminium paint @ 1.0 ltr / pole
11 kV Caution Board
Mandetory Spare Parts
Spare Fuse element tubes for DOF of 500 KVA Distribution Transformer
Spare Fuse element tubes for DOF of 315 KVA Distribution Transformer
Spare Fuse element tubes for DOF of 250 KVA Distribution Transformer
Schedule A2 : Schedule of Quantities for 11/0.433 kV Distribution Transformer (Hermetically Sealead) - 100 kVA, 63 kVA, 25 KVA
DISTRIBUTION TRANSFORMER (SEALED TYPE), 11/ 0.433 KV, 50 Hz, Dyn 11, Copper Wound (3 phase), ONAN COOLED, OUT-DOOR TYPE (WITH OFF-CIRCUIT TAPPINGS +2.5% TO -5% IN STEPS OF 2.5% ON H.V SIDE) PROVIDED WITH STANDARD FITTINGS & ACCESSORIES OIL FILLED AND HERMETICALLY SEALED CONFORMING TO IS:1180 (PART-I) 2014: ENERGY EFFICIENCY LEVEL -2
INCOMING: 1 No. 200 A, 4P,50KA, MCCB OUTGOING: 3 Nos. 100A TP MCCB, 35 KA, & 1 No. 32A TP MCCB, 35 KA all with built in Thermo Magnetic Release.
INCOMING: 1 No. 100 A, 4P,50KA, MCCB OUTGOING: 3 Nos. 63A TP MCCB, 35 KA, & 1 No. 32A TP MCCB, 35 KA all with built in Thermo Magnetic Release.
INCOMING: 1 No. 63 A, 4P,50KA, MCCB OUTGOING: 2 Nos. 40A TP MCCB, 35 KA, & 1 No. 32A TP MCCB, 35 KA all with built in Thermo Magnetic Release.
11 KV, 3 Pole 400 amp, Air Break Gang Operated Switch (G.O.S) tilting type, three insulator per phase, complete with all fittings confirming to IS: 9920 & IS: 9921 Raychem RPG make or equivalent
11 KV, 3 Pole 200 amp, Air Break Gang Operated Switch (G.O.S) tilting type, three insulator per phase, complete with all fittings confirming to IS: 9920 & IS: 9921 Raychem RPG make or equivalent
11 KV, 3 Pole, 400 amp. Drop-out Fuse (D.O.F Unit) complete with all accessories including fuse element rated for transformer capacity confirming to IS: 9385 Raychem RPG make or equivalent
11 KV, 3 Pole, 200 amp. Drop-out Fuse (D.O.F Unit) complete with all accessories including fuse element rated for transformer capacity confirming to IS: 9385 Raychem RPG make or equivalent
9 Mtrs. Steel lattice structure of 35x35x6mm M.S Angle complete with nuts & bolts conforming to specification of design detail No. 2/L/FT/E&PD/ 9 Mtrs.
G.I. channel 75X40X4.8mmX2.2 m long for DP.
G.I. channel 75 X 40x4.8mm X 1.2 m long for mounting of DT
Back clamps of 50x8mm G.I. flat for holding channel.
G.I. nuts & bolts of 16mm dia.X 40mm length.
9 KV, 10 KA Single pole unit Metal Oxide Gapless Surge Arrestor with earth lead disconnector, bird protection cap and mounting brackets. for 11 KV, 50 c/s solidly earthed neutral system confirming to IS:3070 (Part III)
SAFE EARTHING MODEL T-19 SHORT CURRENT 20KA RMS FOR 1 SEC(LV / MV) APPLICATION CONFORMING TO IS: 3043: 50 mm diameter x 2 mtrs. Electrode (Copper bonded) & One bag backfill chemical compound.
GI strip 25x6 mm. for earthing
1.1 kV 1Cx50 sqmm, Cu/XLPE/PVC (DTR to LT D-Board Incomer)
Tinned Copper Lugs - 50 sqmm
AAAC Rabbit Conductor (or down wires)
Al Line Tap / PG Clamp, Double Bolt, 25-150 sqmm
Red oxide paint @ 1.5 ltr/ pole
Aluminium paint @ 1.0 ltr / pole
11 kV Caution Board
Mandetory Spare Parts
Spare Fuse element tubes for DOF of 100 KVA Distribution Transformer
Spare Fuse element tubes for DOF of 63 KVA Distribution Transformer
Spare Fuse element tubes for DOF of 25 KVA Distribution Transformer
Schedule B : Schedule of Quantities for 11/0.433 kV Packaged Substation - 750 kVA, 500 kVA
Packaged sub-station 11/0.433 KV, 50 Hz consisting of 11 kV, 3 way SF6 insulated compact RMU, oil cooled (Aluminium wound)/ dry type copper wound transformer and LT section with one ACB as incoming and 4 nos outgoing MCCB feeders and with encloser made of electromechanically galvanized
11 kV RMU - 2 X 630 A LBS + 1 X 200 A VCB (Motor Operated / SCADA ready ) 500 KVA Oil cooled (Al wound) / Dry Type (Cu wound) transformer LT Compartment : INCOMING:- 1 No. 800 Amp, 415 Volt, 50 KA, FP, ACB with microprocessor Release (IPR E 4 Pole) Outgoing:- - 2 Nos. 200 Amp + 1x100 Amp + 1x63 Amp, TP MCCBs breaking capacity 35 KA with built in Thermo Magnetic Release
SAFE EARTHING MODEL T-19 SHORT CURRENT 20KA RMS FOR 1 SEC(LV / MV) APPLICATION CONFORMING TO IS: 3043: 50 mm diameter x 2 mtrs. Electrode (Copper bonded) & One bag backfill chemical compound.
G.I. strip 25x6 mm. for earthing
Schedule C : Schedule of Quantities for Low Voltage OH Lines
8.5 mtr. steel latticed structure of 35x35x6 mm complete with nuts & bolts.
LT shackle insulator 3"x3 1/2".
D-clamp complete with G.I. pin, washers, nuts & bolts.
Guy assembly complete with 7/12 SWG GI stay wire, 110x75 mm LT guy insulator, 16mm dia stay rod,1.8 mtrs. long with bow thimble, turn buckle and 150x150x6mm anchor plate, GI stay clamp for lattice structure
AAC ANT conductor 50 sq.mm.
AAC GNAT conductor 25 sq.mm.
No. 12 SWG G.I wire for continuous earth wire
Al Binding Wire 10 SWG
SAFE EARTHING MODEL T-19 SHORT CURRENT 20KA RMS FOR 1 SEC(LV / MV) APPLICATION CONFORMING TO IS: 304350 mm diameter x 2 mtrs. Electrode (Copper bonded) & One bag backfill chemical compound.
Danger Board 440 Volts.
Red Oxide paint @1.5 Ltr./pole.
Aluminium paint @1 Ltr./pole.
G.I Barbed wire @ 2Kg/pole.
Schedule D : Schedule of Quantities for Low Voltage UG cable lines
1.1 kV grade armoured cable (Al Conductor/XLPE Insulated/SWA/PVC Sheathed)
3.5 core x 240 sq.mm.
3.5 core x 185 sq.mm.
3.5 core x 120 sq.mm.
3.5 core x 95 sq.mm.
3.5 core x 50 sq.mm.
3.5 core x 25 sq.mm.
4 core x 16 sq.mm.
2 core x 16 sq.mm.
2 core x 10 sq.mm.
Rigid U PVC pipe as per IS 4985-2000 working pressure 6Kgf/cm2
160 mm dia.
110 mm dia.
75 mm dia.
50 mm dia.
1.1 KV indoor/outdoor end termination kit suitable for:
3.5 core x 240 sq.mm.
3.5 core x 185 sq.mm.
3.5 core x 120 sq.mm.
3.5 core x 95 sq.mm.
3.5 core x 50 sq.mm.
3.5 core x 25 sq.mm.
1.1 KV straight through jointing kit suitable for:
3.5 core x 240 sq.mm.
3.5 core x 185 sq.mm.
3.5 core x 120 sq.mm.
3.5 core x 95 sq.mm.
3.5 core x 50 sq.mm.
FEEDER PILLARS: OUTDOOR TYPE CUBICLE CONFORMING TO IS:8623-1 Main Feeder Panel: Cubicle design totally enclosed and water proof outdoor type floor mounted suitable for use in 440 V,400A as main feeder pillar Incomer : 1 No 400 A, MCCB, 50KA Outgoing: 2 Nos. 200 A TPN MCCB & 4 Nos. 32 A TPN, MCB for individual service connections.
FEEDER PILLARS: OUTDOOR TYPE CUBICLE CONFORMING TO IS:8623-1 Sub-Main Feeder Panel: Cubicle design totally enclo.& water proof outdoor type floor mounted suitable for use in 440V 200 A as a sub-main feeder pillar: Incomer: 1 No. 200 A, TPN MCCB Outgoing: 3 Nos. 63 A TPN MCCB & 4 Nos. 32 A MCCB for individual service connections & 8 Nos.16 A TPN for individual service
Safe earthing electrode Model T-19 short time current 20 KA rms for 1 sec (MV) application: 50 mm dia.x3 mtrs. electrode & 2 bags backfill Chemical compound .
GI strip 25mm X 5mm for earthing
Aluminium thimble of size;
Sundry itmes for 3.5C x 25 or 35 / 4C x 16 sqmm cable line installation for upto 30 Nos 3-phase connections for termination at switchgear / meterboxes ( like nails, saddle, etc.)
Sundry itmes for 4C x 16 / 2Cx 16 & 10 sqmm cable line installation for upto 50 Nos 1-phase & 3-phase connections for termination at switchgear / meterboxes ( like nails, saddle, etc.)
Schedule E : Schedule of Quantities for Low Voltage ABC lines
8.5 Mtr STP 410 SP21 complete with base plate, nuts & bolts
Tension / Dead End Clamp with hook attachment for AB Cable with insulated messenger, 50-70 sqmm, 20 kN breaking load
Tension / Dead End Clamp with hook attachment for AB Cable with insulated messenger, 25-35 sqmm, 20 kN breaking load
Suspension Clamp with hook attachment for AB Cable with insulated messenger, 25-95 sqmm, 16 kN breaking load
GI Pole Clamp for fixting hook attachment on STP pole
Piercing Connector TYPE -I, (Main 25-120 sqmm Tap Off 25-120 Sqmm)
Piercing Connector TYPE -II, (Main 35 -120 sqmm Tap Off 16-25 Sqmm) (provisional qty for st. lighting tapping)
1.1 kV XLPE Aerial Bunched Cable 3x120+1x70+1x16 sqmm, insulated neutral cum Messenger
1.1 kV XLPE Aerial Bunched Cable 3x95+1x70 +1x16 sqmm, insulated neutral cum Messenger
1.1 kV XLPE Aerial Bunched Cable 3x70+1x50+1x16 sqmm, insulated neutral cum Messenger
1.1 kV XLPE Aerial Bunched Cable 3x50+1x35+1x16 sqmm, insulated neutral cum Messenger
1.1 kV XLPE Aerial Bunched Cable 3x35+1x35+1x16 sqmm, insulated neutral cum Messenger
Stay set including 16 mm Dia x 1.8 mtr Long Rod, and 110 x 75 x 6 mm Anchor Plate complete with 7/12 SWG Stay Wire, G.I Stay clamp
G.I. Back Clamps 75 x 8 mm flat complete with G.I Pole Clamp
Earthing Coil of 115 Turns of 50 MM Dia and 2.5 Mtr Lead of 4.0 mm G.I Wire
Push on type end caps for ABC, 16-120 sqmm
Three phase LT ABC Distribution Box with Spring Loaded Busbar System suitable for 1 Incoming 3 Outgoing 3 Phase Circuits
Single phase LT ABC Distribution Box Spring Loaded Busbar System suitable for 1 Incoming 6 Outgoing 1 Phase Circuit
4C x35 sqmm Al/PVC cable for connecting Dist. Box to ABC
2C x25 sqmm Al/PVC cable for connecting Dist. Box to ABC
Red Oxide Paint
Aluminium Paint
Anti Climbing Device (Barbed Wire)
440 Volt Caution Board
Description of Work / Item(s)
Amount
Schedule A1 : Schedule of Quantities for 11/0.433 kV Distribution Transformer (Non-Sealed Type) - 750 kVA, 500 kVA, 315 KVA, 250 KVA
DISTRIBUTION TRANSFORMER (NON-SEALED TYPE), 11/ 0.433 KV, Dyn 11, Copper Wound (3 phase), ONAN COOLED, OUT-DOOR TYPE WITH OFF-CIRCUIT TAPPINGS OF +5% TO -10% IN STEPS OF 2.5% ON H.V SIDE, PROVIDED WITH STANDARD FITTINGS & ACCESSORIES WITH FIRST FILLING OF TRANSFORMER OIL CONFORMING TO IS:1180 (PART-I)2014 : ENERGY EFFICIENCY LEVEL -2
INCOMING:- No. 800 Amp, 415 Volt, FP, manually Draw Out type ACB with in built Thermo Magnetic Release & 6No+6Nc Auxiliary contacts. Outgoing:- 3 Nos. 200 Amp TP MCCB breaking capacity 35 KA , 1 No. 100 Amp TP MCCB breaking capacity 35 KA & 1 No. 63 Amp. TP MCCB breaking capacity 35 KA, all with built in Thermo Magnetic Release
INCOMING: 1 No. 630 A, 4P,50KA, MCCB OUTGOING: 3 Nos. 200A TP MCCB, 50 KA & 1 No. 63A TP MCCB, 35 KA all with built in Thermo Magnetic Release.
INCOMING: 1 No. 400 A, 4P,50KA, MCCB OUTGOING: 1 No. 200A TP MCCB, 50 KA ,2 Nos. 100A TP MCCB, 35 KA & 1 No. 63A TP MCCB, 35 KA, all with built in Thermo Magnetic Release.
11 KV, 3 Pole 400 amp, Air Break Gang Operated Switch (G.O.S) tilting type, three insulator per phase, complete with all fittings confirming to IS: 9920 & IS: 9921 Raychem RPG make or equivalent
11 KV, 3 Pole, 400 amp. Drop-out Fuse (D.O.F Unit) complete with all accessories including fuse element rated for transformer capacity confirming to IS: 9385 Raychem RPG make or equivalent
11 kV, 3 X 35 sq.mm Cu / XPLE Cable
Heat Shrinkable Outdoor type end termination kit for 11 KV (E) 3 core XLPE (Kit No.EOKT 3091-3131) Raychem make or equivalent : 3 C X 35 sqmm
9 Mtrs. Steel lattice structure of 35x35x6mm M.S Angle complete with nuts & bolts conforming to specification of design detail No. 2/L/FT/E&PD/ 9 Mtrs.
G.I. channel 75X40X4.8mmX2.2 m long for DP.
Back clamps of 50x8mm G.I. flat for holding channel.
G.I. nuts & bolts of 16mm dia.X 40mm length.
9 KV, 10 KA Single pole unit Metal Oxide Gapless Surge Arrestor with earth lead disconnector, bird protection cap and mounting brackets. for 11 KV, 50 c/s solidly earthed neutral system confirming to IS:3070 (Part III) Raychem RPG make or equivalent
SAFE EARTHING MODEL T-19 SHORT CURRENT 20KA RMS FOR 1 SEC(LV / MV) APPLICATION CONFORMING TO IS: 3043: 50 mm diameter x 2 mtrs. Electrode (Copper bonded) & One bag backfill chemical compound.
G.I. strip 25x6 mm. for earthing
1.1 kV 1Cx240 sqmm, Cu/XLPE/PVC (DTR to LT D-Board Incomer) (2 cables /cct for 750 / 500 KVA, 1 cable/cct for 315/250 KVA)
Tinned Copper Lugs - 240 sqmm
AAAC Rabbit Conductor (for down wires)
Al Line Tap / PG Clamp, Double Bolt, 25-150 sqmm
Red oxide paint @ 1.5 ltr/ pole
Aluminium paint @ 1.0 ltr / pole
11 kV Caution Board
Mandetory Spare Parts
Spare Fuse element tubes for DOF of 500 KVA Distribution Transformer
Spare Fuse element tubes for DOF of 315 KVA Distribution Transformer
Spare Fuse element tubes for DOF of 250 KVA Distribution Transformer
Schedule A2 : Schedule of Quantities for 11/0.433 kV Distribution Transformer (Hermetically Sealead) - 100 kVA, 63 kVA, 25 KVA
DISTRIBUTION TRANSFORMER (SEALED TYPE), 11/ 0.433 KV, 50 Hz, Dyn 11, Copper Wound (3 phase), ONAN COOLED, OUT-DOOR TYPE (WITH OFF-CIRCUIT TAPPINGS +2.5% TO -5% IN STEPS OF 2.5% ON H.V SIDE) PROVIDED WITH STANDARD FITTINGS & ACCESSORIES OIL FILLED AND HERMETICALLY SEALED CONFORMING TO IS:1180 (PART-I) 2014: ENERGY EFFICIENCY LEVEL -2
INCOMING: 1 No. 200 A, 4P,50KA, MCCB OUTGOING: 3 Nos. 100A TP MCCB, 35 KA, & 1 No. 32A TP MCCB, 35 KA all with built in Thermo Magnetic Release.
INCOMING: 1 No. 100 A, 4P,50KA, MCCB OUTGOING: 3 Nos. 63A TP MCCB, 35 KA, & 1 No. 32A TP MCCB, 35 KA all with built in Thermo Magnetic Release.
INCOMING: 1 No. 63 A, 4P,50KA, MCCB OUTGOING: 2 Nos. 40A TP MCCB, 35 KA, & 1 No. 32A TP MCCB, 35 KA all with built in Thermo Magnetic Release.
11 KV, 3 Pole 400 amp, Air Break Gang Operated Switch (G.O.S) tilting type, three insulator per phase, complete with all fittings confirming to IS: 9920 & IS: 9921 Raychem RPG make or equivalent
11 KV, 3 Pole 200 amp, Air Break Gang Operated Switch (G.O.S) tilting type, three insulator per phase, complete with all fittings confirming to IS: 9920 & IS: 9921 Raychem RPG make or equivalent
11 KV, 3 Pole, 400 amp. Drop-out Fuse (D.O.F Unit) complete with all accessories including fuse element rated for transformer capacity confirming to IS: 9385 Raychem RPG make or equivalent
11 KV, 3 Pole, 200 amp. Drop-out Fuse (D.O.F Unit) complete with all accessories including fuse element rated for transformer capacity confirming to IS: 9385 Raychem RPG make or equivalent
9 Mtrs. Steel lattice structure of 35x35x6mm M.S Angle complete with nuts & bolts conforming to specification of design detail No. 2/L/FT/E&PD/ 9 Mtrs.
G.I. channel 75X40X4.8mmX2.2 m long for DP.
G.I. channel 75 X 40x4.8mm X 1.2 m long for mounting of DT
Back clamps of 50x8mm G.I. flat for holding channel.
G.I. nuts & bolts of 16mm dia.X 40mm length.
9 KV, 10 KA Single pole unit Metal Oxide Gapless Surge Arrestor with earth lead disconnector, bird protection cap and mounting brackets. for 11 KV, 50 c/s solidly earthed neutral system confirming to IS:3070 (Part III)
SAFE EARTHING MODEL T-19 SHORT CURRENT 20KA RMS FOR 1 SEC(LV / MV) APPLICATION CONFORMING TO IS: 3043: 50 mm diameter x 2 mtrs. Electrode (Copper bonded) & One bag backfill chemical compound.
GI strip 25x6 mm. for earthing
1.1 kV 1Cx50 sqmm, Cu/XLPE/PVC (DTR to LT D-Board Incomer)
Tinned Copper Lugs - 50 sqmm
AAAC Rabbit Conductor (or down wires)
Al Line Tap / PG Clamp, Double Bolt, 25-150 sqmm
Red oxide paint @ 1.5 ltr/ pole
Aluminium paint @ 1.0 ltr / pole
11 kV Caution Board
Mandetory Spare Parts
Spare Fuse element tubes for DOF of 100 KVA Distribution Transformer
Spare Fuse element tubes for DOF of 63 KVA Distribution Transformer
Spare Fuse element tubes for DOF of 25 KVA Distribution Transformer
Schedule B : Schedule of Quantities for 11/0.433 kV Packaged Substation - 750 kVA, 500 kVA
Packaged sub-station 11/0.433 KV, 50 Hz consisting of 11 kV, 3 way SF6 insulated compact RMU, oil cooled (Aluminium wound)/ dry type copper wound transformer and LT section with one ACB as incoming and 4 nos outgoing MCCB feeders and with encloser made of electromechanically galvanized
11 kV RMU - 2 X 630 A LBS + 1 X 200 A VCB (Motor Operated / SCADA ready ) 500 KVA Oil cooled (Al wound) / Dry Type (Cu wound) transformer LT Compartment : INCOMING:- 1 No. 800 Amp, 415 Volt, 50 KA, FP, ACB with microprocessor Release (IPR E 4 Pole) Outgoing:- - 2 Nos. 200 Amp + 1x100 Amp + 1x63 Amp, TP MCCBs breaking capacity 35 KA with built in Thermo Magnetic Release
SAFE EARTHING MODEL T-19 SHORT CURRENT 20KA RMS FOR 1 SEC(LV / MV) APPLICATION CONFORMING TO IS: 3043: 50 mm diameter x 2 mtrs. Electrode (Copper bonded) & One bag backfill chemical compound.
G.I. strip 25x6 mm. for earthing
Schedule C : Schedule of Quantities for Low Voltage OH Lines
8.5 mtr. steel latticed structure of 35x35x6 mm complete with nuts & bolts.
LT shackle insulator 3"x3 1/2".
D-clamp complete with G.I. pin, washers, nuts & bolts.
Guy assembly complete with 7/12 SWG GI stay wire, 110x75 mm LT guy insulator, 16mm dia stay rod,1.8 mtrs. long with bow thimble, turn buckle and 150x150x6mm anchor plate, GI stay clamp for lattice structure
AAC ANT conductor 50 sq.mm.
AAC GNAT conductor 25 sq.mm.
No. 12 SWG G.I wire for continuous earth wire
Al Binding Wire 10 SWG
SAFE EARTHING MODEL T-19 SHORT CURRENT 20KA RMS FOR 1 SEC(LV / MV) APPLICATION CONFORMING TO IS: 304350 mm diameter x 2 mtrs. Electrode (Copper bonded) & One bag backfill chemical compound.
Danger Board 440 Volts.
Red Oxide paint @1.5 Ltr./pole.
Aluminium paint @1 Ltr./pole.
G.I Barbed wire @ 2Kg/pole.
Schedule D : Schedule of Quantities for Low Voltage UG cable lines
1.1 kV grade armoured cable (Al Conductor/XLPE Insulated/SWA/PVC Sheathed)
3.5 core x 240 sq.mm.
3.5 core x 185 sq.mm.
3.5 core x 120 sq.mm.
3.5 core x 95 sq.mm.
3.5 core x 50 sq.mm.
3.5 core x 25 sq.mm.
4 core x 16 sq.mm.
2 core x 16 sq.mm.
2 core x 10 sq.mm.
Rigid U PVC pipe as per IS 4985-2000 working pressure 6Kgf/cm2
160 mm dia.
110 mm dia.
75 mm dia.
50 mm dia.
1.1 KV indoor/outdoor end termination kit suitable for:
3.5 core x 240 sq.mm.
3.5 core x 185 sq.mm.
3.5 core x 120 sq.mm.
3.5 core x 95 sq.mm.
3.5 core x 50 sq.mm.
3.5 core x 25 sq.mm.
1.1 KV straight through jointing kit suitable for:
3.5 core x 240 sq.mm.
3.5 core x 185 sq.mm.
3.5 core x 120 sq.mm.
3.5 core x 95 sq.mm.
3.5 core x 50 sq.mm.
FEEDER PILLARS: OUTDOOR TYPE CUBICLE CONFORMING TO IS:8623-1 Main Feeder Panel: Cubicle design totally enclosed and water proof outdoor type floor mounted suitable for use in 440 V,400A as main feeder pillar Incomer : 1 No 400 A, MCCB, 50KA Outgoing: 2 Nos. 200 A TPN MCCB & 4 Nos. 32 A TPN, MCB for individual service connections.
FEEDER PILLARS: OUTDOOR TYPE CUBICLE CONFORMING TO IS:8623-1 Sub-Main Feeder Panel: Cubicle design totally enclo.& water proof outdoor type floor mounted suitable for use in 440V 200 A as a sub-main feeder pillar: Incomer: 1 No. 200 A, TPN MCCB Outgoing: 3 Nos. 63 A TPN MCCB & 4 Nos. 32 A MCCB for individual service connections & 8 Nos.16 A TPN for individual service
Safe earthing electrode Model T-19 short time current 20 KA rms for 1 sec (MV) application: 50 mm dia.x3 mtrs. electrode & 2 bags backfill Chemical compound .
GI strip 25mm X 5mm for earthing
Aluminium thimble of size;
Sundry itmes for 3.5C x 25 or 35 / 4C x 16 sqmm cable line installation for upto 30 Nos 3-phase connections for termination at switchgear / meterboxes ( like nails, saddle, etc.)
Sundry itmes for 4C x 16 / 2Cx 16 & 10 sqmm cable line installation for upto 50 Nos 1-phase & 3-phase connections for termination at switchgear / meterboxes ( like nails, saddle, etc.)
Schedule E : Schedule of Quantities for Low Voltage ABC lines
8.5 Mtr STP 410 SP21 complete with base plate, nuts & bolts
Tension / Dead End Clamp with hook attachment for AB Cable with insulated messenger, 50-70 sqmm, 20 kN breaking load
Tension / Dead End Clamp with hook attachment for AB Cable with insulated messenger, 25-35 sqmm, 20 kN breaking load
Suspension Clamp with hook attachment for AB Cable with insulated messenger, 25-95 sqmm, 16 kN breaking load
GI Pole Clamp for fixting hook attachment on STP pole
Piercing Connector TYPE -I, (Main 25-120 sqmm Tap Off 25-120 Sqmm)
Piercing Connector TYPE -II, (Main 35 -120 sqmm Tap Off 16-25 Sqmm) (provisional qty for st. lighting tapping)
1.1 kV XLPE Aerial Bunched Cable 3x120+1x70+1x16 sqmm, insulated neutral cum Messenger
1.1 kV XLPE Aerial Bunched Cable 3x95+1x70 +1x16 sqmm, insulated neutral cum Messenger
1.1 kV XLPE Aerial Bunched Cable 3x70+1x50+1x16 sqmm, insulated neutral cum Messenger
1.1 kV XLPE Aerial Bunched Cable 3x50+1x35+1x16 sqmm, insulated neutral cum Messenger
1.1 kV XLPE Aerial Bunched Cable 3x35+1x35+1x16 sqmm, insulated neutral cum Messenger
Stay set including 16 mm Dia x 1.8 mtr Long Rod, and 110 x 75 x 6 mm Anchor Plate complete with 7/12 SWG Stay Wire, G.I Stay clamp
G.I. Back Clamps 75 x 8 mm flat complete with G.I Pole Clamp
Earthing Coil of 115 Turns of 50 MM Dia and 2.5 Mtr Lead of 4.0 mm G.I Wire
Push on type end caps for ABC, 16-120 sqmm
Three phase LT ABC Distribution Box with Spring Loaded Busbar System suitable for 1 Incoming 3 Outgoing 3 Phase Circuits
Single phase LT ABC Distribution Box Spring Loaded Busbar System suitable for 1 Incoming 6 Outgoing 1 Phase Circuit
4C x35 sqmm Al/PVC cable for connecting Dist. Box to ABC
2C x25 sqmm Al/PVC cable for connecting Dist. Box to ABC
Red Oxide Paint
Aluminium Paint
Anti Climbing Device (Barbed Wire)
440 Volt Caution Board
Description of Work / Item(s)
Amount
GPS survey and mapping
GPS survey and mapping of proposed LT overhead, LT ABC and LT Underground (main and sub-main feeders) lines
Description of Work / Item(s)
Amount
Schedule A1 : Schedule of Quantities for 11/0.433 kV Distribution Transformer (Non-Sealed Type) - 750 kVA, 500 kVA, 315 KVA, 250 KVA
INSTALLATION AND OTHER SERVICES
Erection, testing and commisioning of 750 / 500/ 315 / 250 KVA Distribution Transformer Station including H-pole with all equipment / accessories & painting, Distribution Transformer & LV Distribution Switchboard on parapet, cables and all connections earthing complete.
Civil Works (including material and works)
Concreting of 9 Mtrs. Lattice Structure / Swaged Steel Tubelar Pole in 1:4:8 cc in 0.9x0.9x1.75 mtrs Pit, Construction of parapet 0.61 x 0.61x0.153 mtrs. In 1:3:6 cc i/c 12mm cement plaster of parapet in 1:4 Mix.
Construction of parapet of size 1.5xl.5xlm trs. In 1:3:6 cc Mix including 12mm thick cement plaster in 1:4 Mix. for placement of 500/750 KVA Distribution Transformer
Construction of parapet of size 1.2x1.2x1mtrs. In 1:3:6 cc Mix including 12 mm thick cement plaster in 1:4 mix. for placement of 315 / 250 KVA Distribution Transformer
Construction of parapet of size 2x0.61x0.35x0.61 mtrs. In 1:3:6 cc mix including 12mm thick cement plaster in 1:4 mix. for Placement of L.T Distribution Board
Fencing for 400/500/630/750 KVA parapet mounted distribution sub-station of size 3.5x4 mtrs. constructed with 50x50x5mm M.S angle vertical props, 35x35x6mm M.S angle supports(double run), M.S wire mesh, 50x6mm M.S flat iron for clamping wire mesh complete with gate with locking arrangement, site development, concreting of props in 1:2:4 cc i/c soling & flooring works in 1:4:8 cc as per Layout No. 3/F/E&PD/400-750 KVA.
Fencing for 100/150/200/315 KVA parapet mounted distribution sub-station of size 3x3 mtrs.constructed with 50x50x5mm M.S angle vertical props, 35x35x6mm M.S angle supports(double run), M.S wire mesh, 50x6mm M.S flat iron for clamping wire mesh complete with gate with locking arrangement, site development, concreting of props in 1:2:4 cc i/c soling & flooring works in 1:4:8 cc as per Layout No.2/F/E&PD/100-315 KVA.
Schedule A2 : Schedule of Quantities for 11/0.433 kV Distribution Transformer (Hermetically Sealead) - 100 kVA, 63 kVA, 25 KVA
INSTALLATION AND OTHER SERVICES
Erection, testing and commisioning of 100 KVA Distribution Transformer Station including H-pole with all equipment / accessories & painting, Distribution Transformer and LV Distribution Switchboard on parapet, cables and all connections earthing complete.
Erection, testing and commisioning of 63 / 25 KVA Distribution Transformer Station including H-pole with all equipment / accessories & painting, Distribution Transformer on H-pole and LV Distribution Switchboard on parapet, cables and all connections & earthing, complete.
Civil Works (including material and works)
Concreting of 9 Mtrs. Lattice Structure / Swaged Steel Tubelar Pole in 1:4:8 cc in 0.9x0.9x1.75 mtrs Pit, Construction of parapet 0.61 x 0.61x0.153 mtrs. In 1:3:6 cc i/c 12mm cement plaster of parapet in 1:4 Mix.
Construction of parapet of size 1.2x1.2x1mtrs. In 1:3:6 cc Mix including 12 mm thick cement plaster in 1:4 mix. for placement of 100 KVA Distribution Transformer
Construction of parapet of size 2x0.61x0.35x0.61 mtrs. In 1:3:6 cc mix including 12mm thick cement plaster in 1:4 mix. for Placement of L.T Distribution Board
Fencing for 100/ KVA parapet mounted distribution sub-station of size 3x3 mtrs.constructed with 50x50x5mm M.S angle vertical props, 35x35x6mm M.S angle supports(double run), M.S wire mesh, 50x6mm M.S flat iron for clamping wire mesh complete with gate with locking arrangement, site development, concreting of props in 1:2:4 cc i/c soling & flooring works in 1:4:8 cc as per Layout No.2/F/E&PD/100-315 KVA.
Fencing for 10/16/25/63 KVA pole mounted distribution sub-station of size 2x3 mtrs.constructed with 50x50x5mm M.S angle vertical props, 35x35x6mm M.S angle supports(double run), M.S wire mesh, 50x6mm M.S flat iron for clamping wire mesh complete with gate with locking arrangement, site development, concreting of props in 1:2:4 cc i/c soling & flooring works in 1:4:8 cc as per layout No. 1/F/E&PD/10-63 KVA.
Schedule B : Schedule of Quantities for 11/0.433 kV Packaged Substation - 750 kVA, 500 kVA
INSTALLATION AND OTHER SERVICES
Erection, testing and commisioning of Packaged Substation (750/500 kVA) including all equipment / accessories, cables and all connections earthing, complete.
Civil Works (including material and works)
Construction of parapet upto 1 m high of required dimensions for placement of 500 KVA PSS with provisions for HT & LT cable runs in 1:3:6 cc mix including 12mm thick cement plaster in 1:4 mix. and complying with OEM recommendations
Fencing for 400/500/630/750 KVA parapet mounted PSS of size 3.5x4 mtrs.constructed with 50x50x5mm M.S angle vertical props, 35x35x6mm M.S angle supports(double run), M.S wire mesh, 50x6mm M.S flat iron for clamping wire mesh complete with gate with locking arrangement, site development, concreting of props in 1:2:4 cc i/c soling & flooring works in 1:4:8 cc as per Layout No. 3/F/E&PD/400-750 KVA.
Schedule C : Schedule of Quantities for Low Voltage OH Lines
INSTALLATION AND OTHER SERVICES
Dismantling of existing bare conductor 3P5W LT OH lines including removal of poles / lattice structures, insulators, D-clamps, conductors, stays and all accessories, filling and restoration of pits / surfaces, clearance of RoW and returning all salvaged materials to PDS regional stores (provisional qty subject to field requirement)
Dismantling of existing bare conductor 2P2W LT OH lines (as per field requirement) including removal of poles / lattice structures, insulators, D-clamps, conductors, stays and all accessories, filling and restoration of pits / surfaces, clearance of RoW and returning all salvaged materials to PDS regional stores (provisional qty subject to field requirement)
Erection of 8.5 mtr. steel lattice structure, fitting and fixing of all materials (fully dressed) including LT shackle insulatosr, D-clamps & other accesories, existing street lamps, danger plate & barbed wire etc and painting ( but excluding concreting to be priced seperately)
Erection of complete LT Guy assembly with GI stay wire (excluding concreting to be priced seperately)
Stringing of 3 x phase + neutral conductors and earth wire at proper tension/ sag, including insulator binding, earthing (as per applicable std), connecting line with DTR switchboard, reconnecting all exsisting consumer services and street lamps, testing and commisioning of line, complete
Stringing of 1 x phase + neutral conductors at proper tension/ sag, including insulator binding, earthing (as per applicable std), connecting line with DTR switchboard, reconnecting all exsisting consumer services & street lamps, testing and commisioning of line complete
Civil Works (including material and works)
Concreting of 8.5 mtr. Structure in 1:4:8 cc in 0.9x0.9x1.50 mtrs. pit, contruction of parapet 0.35x0.475xx0.153 mtrs. in 1:3:6cc i/c 12mm cement plaster of parapet in 1:4 mix.
Concreting of LT guy assembly in 1:4:8cc in 0.30x0.30x1.05 mts. pit.
Schedule D : Schedule of Quantities for Low Voltage UG cable lines
INSTALLATION AND OTHER SERVICES
Dismataling of existing bare conductor 3P5W LT OH lines including removal of poles / lattice structures, insulators, D-clamps, conductors, stays and all accessories, filling and restoration surfaces of pits and returning all salvaged materials to PDS regional stores (provisional qty as per field requirement)
Erection of Main LV Feeder Lines : Laying of cables of size 3.5 C x 150 / 185/ 240 or 300 sqmm in UPVC pipes including cable joints, connecting cable line with existing DTR / PSS, testing and commisioning (excluding trench works to be quoted seperately under civil works)
Erection of Sub-Main LV Feeder Lines : Laying of cables of size 3.5 C x 50/ 95 or 120 sqmm in UPVC pipes including cable joints , testing and commisioning (excluding trench works to be quoted seperately under civil works)
Erection of LV line connections : Laying of cables of size 3.5C x 25 / 35 sqmm and 4Cx 16 sqmm and in UPVC pipes ( multiple circuits) including all connections & terminations for upto 20 Nos 3-phase connections , testing and commisioning (excluding trench works to be quoted seperately under civil works)
Erection of LV line connections : Laying of cables of size 4Cx 16 sqmm and 2C x 16 / 10 sqmm in UPVC pipes ( multiple circuits) including all connections & terminations for upto 50 Nos 1-phase & 3-phase connections , testing and commisioning (excluding trench works to be quoted seperately under civil works)
Installation, testing and commisioing of 400 A Main Feeder Pillar Panel inclding all cable connections, terminations and earthing ( excluding mounting parapet to be quoted seperately under civil works)
Installation, testing and commisioing of 200 A Sub-Main Feeder Pillar Panel / L.T distribution switch board inclding all cable connections, terminations and earthing ( excluding mounting parapet to be quoted seperately under civil works)
Civil Works (including material and works)
Excavation of 0.45x0.90x1.00 m cable trench in mix soil & refilling with available excavated earth and providing concreting / tiles on the top of the trench.
Construction of parapet of size 2x0.61x0.35x0.61 mtrs. In 1:3:6 cc mix i/c 12mm thick cement plaster in 1:4 mix. for lacement of L.T. Feeder Pillar / Distribution Board
Schedule E : Schedule of Quantities for Low Voltage ABC lines
INSTALLATION AND OTHER SERVICES
Dismataling of existing bare conductor 3P5W LT OH lines (as per field requiremen t) including removal of poles / lattice structures, insulators, D-clamps, conductors, stays and all accessories, filling and restoration surfaces of pits and returning all salvaged materials to PDS regional stores (provisional qty)
Erection of 8.5 mtr. STP pole including fixing of all materials (fully dressed) including , tension / suspension clamps, ABC distribution boxes. other accesories, existing street lamps, danger plate & barbed wire etc and painting ( excluding concreting to be priced seperately under civil works)
Erection of complete LT Guy assembly with GI stay wire (excluding concreting to be priced seperately uunder civil works)
Stringing of AB cable at proper tension / sag and providing connections to existing DTR switchboard, ABC distribution boxes, line earthing, end caps, reconnecting all existing consumer services and street lighting, testing and commissioning of AB line, complete. (All connections shall be made via Insulated Piercing Connectors and any damages or exposed parts of AB cable strictly not permitted)
Civil Works (including material and works)
Concreting of 8.5 STP M15 Grade, 0.25 cum per pole including muffling above GL 300 mm
Concreting of Guy Assy Set, M15 Grade, 0.2 cum per stay
Description of Work / Item(s)
Amount
Total Price CIP in EUR (Schedule 1)
Total Price CIP in USD (Schedule 1)
Total Price CIP in JPY (Schedule 1)
Total Price of Taxes & Duties in INR (Schedule 1)
Total Price EXW in INR (Schedule-2)
Total Price of Design Services in INR ( Schedule-3)
Total Price of Incidental Expenses in INR( Schedule-4A)
Sushil Kumar Goyal (BID ID -2853)
Sushil Kumar Goyal (BID ID -2853)
Sushil Kumar Goyal (BID ID -2853)
Sushil Kumar Goyal (BID ID -2853)
Sushil Kumar Goyal (BID ID -2853)
US Dollar
Japanese yen
European Euro
US Dollar
Japanese yen
European Euro
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
Japanese yen
European Euro
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid