Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance | -16.16% | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.6 Cr+₹14.0 L (9.58%)Admitted-Finance | -8.13% | ₹1.6 Cr+₹14.0 L (9.58%) | L2 | Admitted-Finance |
| 3 | L3₹1.7 Cr+₹21.3 L (14.5%)Admitted-Finance | -3.99% | ₹1.7 Cr+₹21.3 L (14.5%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.7 Cr
EMD Value
₹3.3 L
Closing Date
8 Aug 2026, 6:00 pmClosed
COMMISSIONER MUNICIPAL COUNCIL BANSWARA
COMMISSIONER MUNICIPAL COUNCIL BANSWARA
Municipal Council Banswara Construction of dog shelter near Vaneshwar Road Kagdi Nala
2026_DLB_580664_1
MUNICIPAL COUNCIL BANSWARA 11/2026-27/01
Open Tender
Civil Works
Percentage
365 days
COMMISSIONER MUNICIPAL COUNCIL BANSWARA
Municipal Council Banswara Construction of dog shelter near Vaneshwar Road Kagdi Nala
2 documents required · 2 mandatory
₹1,000
COMMISSIONER MUNICIPAL COUNCIL BANSWARA
₹3.3 L
Yes
12 Aug 2026
1 Aug 2026
10 Aug 2026
1 Aug 2026
8 Aug 2026
1 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.Depth upto 1.5 m | 261.38 | Cum | - | - |
| 2 | Earth filling with available surplus soil excavated from foundations and taken only from outside of building plinth in layers not exceeding 20cm in depth, consolidating each deposited layer including ramming and watering and consolidation with lead up to 50 m and lift upto 1.5 m. | 224 | cum | - | - |
| 3 | Filling with locally available river sand at all levels including watering ramming consolidating and dressing complete including cost of sand. | 64 | cum | - | - |
| 4 | Diluting and injecting Chlorpyriphos/ Lindane E.C. 20% with 1% concentration for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) :Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor : | 640 | Sqm | - | - |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | 75.23 | cum | - | - |
| 6 | Brick work with FPS bricks of class designation 75 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) | 114.35 | cum | - | - |
| 7 | Random rubble masonry with hard stone in foundation and plinth :Cement mortar 1:6 (1 cement : 6 coarse sand) | 75 | cum | - | - |
| 8 | Providing and laying damp-proof course with cement concrete grade M-15 (1 : 2 : 4) mortar prepared with 1% solution of water-proof compound complete as per specification . including Providing/mixing of synthetic fibers compulsorily complying with IS16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% byweight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms percum of Concrete/ mortar.75mm thick. | 65 | sqm | - | - |
| 9 | Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) over 75mm bed by dry brick ballast 40mm nominal size well rammed and consolidated and grouted with fine sand including finishing the top smooth. | 99.31 | sqm | - | - |
| 10 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level :1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 16.7 | cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.49 MB
BOQ_1031766.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .