Loading…
Loading…
Tender Value
₹1.3 L
EMD Value
₹3,810
Closing Date
27 Jul 2026, 6:00 pmDue tomorrow
Office of the Executive Engineer REW Anantnag
Office of the Executive Engineer REW Anantnag
C/O XING NHO AB RASHID BIMLA AND OTHERS WARD NO.8 BLOCK BRENG
2026_RDPR_316818_2
ENIT69of2026-27
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Office of the Executive Engineer REW Anantnag
₹3,810
20 Jul 2026
20 Jul 2026
28 Jul 2026
20 Jul 2026
27 Jul 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 1 metres: Ordinary Rock. | - | Cum | - | - |
| 0.0 | Providing and laying of stone soling of tightly hand picked by tamping including carriage | - | Cum | - | - |
| 0.0 | P/L in position C.C of specified grade walls,abuts,return walls excluding the cost of centring and shuttering 1: 3: 6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size). | - | Cum | - | - |
| 0.0 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:11/2:3 (1 cement : 11/2coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| 0.0 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level TMT Bars of Fe-500 or more | - | KGs | - | - |
| 0.0 | P/F Centring and shuttering including strutting, propping etc. and removal of formwork complete job Abuts, slab, beams | - | sqm | - | - |
| 0.0 | carriage of cement steel etc / 10kms | - | MT | - | - |
| 0.0 | Carriage of material by MT of 40 KM lead sand Aggregates | - | Cum | - | - |
| 0.0 | carriage of cement steel etc by means of manual transport 200m of eqvivalent horizontal lead | - | MT | 1 | - |
| 0.0 | Carriage of material by means of manual transport with equivalent lead of 200m of sand Aggregates and stone boulders | - | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_1035173.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].