| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.7 LAccepted-AOC NOT FOUND | L1 | Accepted-AOC L1 | |
| 2 | L2₹21.9 L+₹2.1 L (10.8%)Rejected-Finance | L2 | Rejected-Finance Other than L1 | |
| 3 | L3₹22.5 L+₹2.8 L (14.0%)Rejected-Finance H NO 2049 HANUMAN COLONY NEAR TCP 3 HISAR CANTT PIN 125006 HARYANA | HISAR | HARYANA | 125006 | L3 | Rejected-Finance Other than L1 | |
| 4 | L4₹22.8 L+₹3.0 L (15.3%)Rejected-Finance CC III 28A JANTA BHAWAN ROAD SIRSA HARYANA 125055 | SIRSA | HARYANA | 125055 | L4 | Rejected-Finance Other than L1 | |
| 5 | L5₹22.8 L+₹3.1 L (15.5%)Rejected-Finance | L5 | Rejected-Finance Other than L1 |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
13 Jun 2023, 6:00 pmClosed
GE (AF) Sirsa
GE (AF) Sirsa-125055
Camouflage to certain Bldgs and Boundary Wall in Tech Area at AF Stn Sirsa
2023_MES_598450_1
GE/SRA/T-13/2023-24
Open Tender
Miscellaneous Works
Item Rate
210 days
GE (AF) Sirsa
Please Refer Tender Documents
8 documents required · 8 mandatory
₹500
GE (AF) Sirsa
₹40,000
Yes
4 Jul 2023
27 May 2023
14 Jun 2023
27 May 2023
13 Jun 2023
8 Jun 2023
29 May 2023 - 3 Jun 2023
Amount
Taking down Cement Plaster including raking out Joints, hacking for Key, scrubbing down with Water and removing Debris, etc. to Outside MD/AF Land, complete all as specified and as directed.
M&L Rough Cast Plaster on Brick Walls consisting Under Coat of Cement and Sand Mortar 1:3 not less than 10mm thick and while it is still in Plastic state the Rough Cast Mixture consisting of Crushed Stone or Fine Gravel mixed with Coarse Sand and Cement in the ratio 1:1:1 shall be applied and finish Even, complete all as specified and as directed.
M&L for 15 mm thick plastering in two layers, 10 mm + 5 mm in cement mortar 1:4, top layer of 5 mm thickness mixed with with water proofing compound (as per manufacturer's instructions) on brick/stone walls or concrete surfaces finished even and fair (upto any height) for external surfaces complete all as specified and directed. Note : Water Proofing compound shall be measured and paid seperately as "Supply only".
Supply only Integral Water Proofing Compound, conforming to IS and/or as approved, complete all as specified.
Material & Labour for preparing new Plastered Surfaces of Walls and applying Two coats of weatherproof exterior emulsion paint of required shade (Camouflage pattern) over and including priming coat of suitable exterior primer applied over new surfaces. complete all as specified and as directed. (NOTE: Paint & Primer ashall be applied as per manufacturer's recommendations)
Material & Labour for preparing new Rough Cast Plastered Surfaces of Walls and applying Two coats of weatherproof exterior emulsion paint of required shade (Camouflage pattern) over and including priming coat of suitable exterior primer applied over new surfaces. complete all as specified and as directed. (NOTE: Paint & Primer ashall be applied as per manufacturer's recommendations)
M&L for preparation of old painted steel sheet (corrugated/plain), by brooming down or steel wire brushing; scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots over 10cm width or girth complete all as specified and as directed.
Material & Labour for preparation of old painted steel sheet (corrugated/plain) by removing complete existing treatment over 10cm width or girth and applying a coat red oxide Zinc chrome primer, complete all as specified and as directed. NOTE FOR ITEM NO. 7 & 8:- (a) All safety measures for the safety of workers shall be ensured by contractor before exeution of work. (b) Insurance of worker shall be got done by conractor before execution of the work and the cost for the same shall deemed to be included in rate quoted by contractor. (c) The quoted rate shall deem to incude the cost of necessary scaffolding and form works as required for a height of building not exceeding 18mtr (Approx).
M&L for applying two coats of synthetic enamel paint (in camouflage pattern) over steel surfaces (corrugated/plain) exceeding 10cm width or girth complete all as specified and as directed. NOTE: (a) All safety measures for the safety of workers shall be ensured by contractor before exeution of work. (b) Insurance of worker shall be got done by conractor before execution of the work and the cost for the same shall deemed to be included in rate quoted by contractor. (c) The quoted rate shall deem to incude the cost of necessary scaffolding and form works as required for a height of building not exceeding 18mtr (Approx). (d) Painting to be done by using Airless Paint Sprayer Painting Machine Ceiling Spray Gun, having maximum pressure 3300PSI(22.7MPa), Max flow rate 2.0±10%(L/min), standard nozzle size 0.017,Length of high pressure hose 50m maximum complete all as per manufacturer instruction. (e) Contractor shall bring the required quantity of material in two lots in selaed containrs after approval of Make/sample and keep in MES store under custody of JE/Engr-in-charge.
Material & Labour for preparing old Plastered Surfaces of Walls and roof by Complete Removing of existing Treatment, rubbing to obtain a Smooth Surface, and applying a coat of alkali resistant priming paint complete all as specified and as directed.
Material & Labour for applying Two coats of weatherproof exterior emulsion paint of required shade (Camouflage pattern) complete all as specified and as directed. NOTE FOR ITEM NO 10 & 11: Rates quoted by the tenderer are included with following apllication as under:- (a) The surfaces shall be cleaned to remove loose dirt or dust,lichen, algae, fungi or any organic growth by use of stiff brush , washed well and allow water to dry. (b) All cracks, voids and minor damages shall be patched/repaired prior to application of paint with white cement putty or with Plaster of Paris. (c) All safety measures for the safety of workers shall be ensured by contractor before exeution of work. Insurance of worker shall be got done by conractor before execution of the work and the cost for the same shall deemed to be incudided in rate quoted by contractor. (d) The quoted rate shall deem to incude the cost of necessary scaffolding and form works as required for a height of building not exceeding 18mtr (Approx). (e) Contractor shall bring the required quantity of material in two lots in selaed containrs after approval of Make/sample and keep in MES store under custody of JE/Engr-in-charge.
DCM ENTERPRISES
STAR CONSTRUCTIONS
M/s Satguru Traders
M/s GURFATEH BUILDERS
M/s Luxmi Constructions
Goyal Enterprises
Aditi Formation Company
Ajay Enterprises
YOGINDER KUMAR GUPTA AND COMPANY
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .