Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹31.5 LAdmitted-Finance | -34.99% | ₹31.5 L | L1 | Admitted-Finance |
| 2 | L2₹37.3 L+₹5.8 L (18.6%)Admitted-Finance 1849 JUGRAJPUR SACHENDI KANPUR KANPUR NAGAR UTTAR PRADESH 208023 UDYAM UP 43 0012110 | KANPUR NAGAR | UTTAR PRADESH | 208023 | -22.91% | ₹37.3 L+₹5.8 L (18.6%) | L2 | Admitted-Finance |
| 3 | L3₹41.5 L+₹10.0 L (31.8%)Admitted-Finance | -14.29% | ₹41.5 L+₹10.0 L (31.8%) | L3 | Admitted-Finance |
| 4 | L4₹45.1 L+₹13.7 L (43.4%)Admitted-Finance 0 0 LATERI LATERI VIDISHA MADHYA PRADESH 464114 | VIDISHA | MADHYA PRADESH | 464114 | -6.75% | ₹45.1 L+₹13.7 L (43.4%) | L4 | Admitted-Finance |
| 5 | L5₹48.3 L+₹16.9 L (53.7%)Admitted-Finance | -0.11% | ₹48.3 L+₹16.9 L (53.7%) | L5 | Admitted-Finance |
Tender Value
₹48.4 L
EMD Value
₹96,781
Closing Date
30 Apr 2026, 6:00 pmClosed
Executive Officer
MUNICIPALOFFICE GHARSANA
Construction and Repair Work of Drain at Various Places Ward No. 1 to 25
2026_DLB_551774_17
NPGSN/NIRMAN/2026-27/38
Open Tender
Civil Works
Percentage
Gharsana
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
MUNICIPAL BOARD
₹96,781
Yes
25 Jul 2026
17 Apr 2026
1 May 2026
20 Apr 2026
30 Apr 2026
20 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CIVIL WORK | |||||
| 1.01 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge
In cement mortar. | - | CUM | - | - |
| - | Silt clearance of drains, channels and canals with lift 1.5 Mtr and lead up to 50 Mtr. | - | CUM | - | - |
| - | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer.
Lime Concrete, cement concrete grade M-10 (1:5:10) and below | - | CUM | - | - |
| - | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.Depth upto 1.5 m | 354.2 | cum | 229.5 | ₹81,288.9 |
| - | Brick work with FPS bricks of class designation 75 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) | 348.26 | cum | 5,400 | ₹18,80,604 |
| - | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded 20mm nominal size stone aggregate) finished with a floating coat ofneat cement including cement slurry, but excluding the cost of nosing of steps etc. complete.
40mm thick | 1,518 | Sqm | 422.5 | ₹6,41,355 |
| - | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix :
1:4 (1 cement : 4 fine/ coarse sand) | 2,024 | Sqm | 315.5 | ₹6,38,572 |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :
1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 264 | cum | 5,910 | ₹15,60,240 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_983537.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .