Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹3.0 L+₹20,089.30 (7.19%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹3.1 L+₹29,398.98 (10.5%)Admitted-Fee/PreQual/Technical/Finance 7 1 MULLAI STREET AYYAPPAN NAGAR MADURAI | MADURAI | MADURAI | TAMIL NADU | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹3.1 L+₹34,298.81 (12.3%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹3.3 L+₹53,898.13 (19.3%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
25 Nov 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer,WRD
O/o, The Executive Engineer, WRD., Periyar Main Canal Division, Melur.
Special reparis to Surplus Weir of Padathalakurichi Tank in Narasingampatti village Melur taluk in Madurai District.
2026_WRD_720635_1
08 2026-2027 JDO2 F.105 DATED.02.11.2026
Open Tender
Civil Works
Percentage
90 days
Narasingampatti
4 documents required · 4 mandatory
₹0
₹5,000
25 Nov 2026
3 Nov 2026
25 Nov 2026
3 Nov 2026
25 Nov 2026
3 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling, clearing away and carefully stacking material useful for reuse for any thickness of brick or stone masonry in Cement Mortar walls under 3 (Three) metres high complying with standard specification and as directed by the Engineer. | 15.84 | Cubic Meter | 302.96 | ₹4,798.89 |
| 2 | Earth work excavating and depositting on bank with intial lead of 10 m & intial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc., complete complying with standard specification and as directed the Engineer in charge of work. (SS20B For Cut open and Foundation) | 7.2 | Cubic Meter | 147.02 | ₹1,058.54 |
| 3 | Gravel packing 15cm thick for cement concrete block revetment or apron including stacking watering and consolidation etc, complete as directed by the Engineer in charge of works and as per the technical specifications. | 15.6 | Cubic Meter | 1,217.2 | ₹18,988.32 |
| 4 | Providing and placing in position of Plain Cement Concrete of grade M 10 using hard well graded coarse aggregate of maximum nominal size of 40mm weigh batching the ingeridents and mixing in approved mixers/ batching plant (to produce concrete of the specified characteristic strength of 10N/Sqmm in 28 days) including dewatering the placement site by bailing / pumping and diverting wherever necessary, laying the concrete in layers of not exceeding 15cm thick and in bays, compacting and finishing the surface to the profile with all leads and lifts, watering, curing to attain the strength as specified in the drawing for various depth and height below and above ground level etc., complete complying with standard specification and as directed by the Engineer in charge of work. | 3.6 | Cubic Meter | 5,989.27 | ₹21,561.37 |
| 5 | Rough stone dry packing for revetment and apron using available Old/New hard granite stones obtained from approved sources including the cost of new wedges for filling the gaps etc, complete as directed by the Engineer in charge of works and as per the technical specifications. | 18.4 | Cubic Meter | 2,410.93 | ₹44,361.11 |
| 6Random Rubble masonry in cement mortor 1:4 (one part of cement and four part of m sand) using hard granite stones and bond stones from sources inluding simultaneous pointing of the exposed surface with same mortor and all incidental charges such as bailing out water, watering, curing, finishing etc., complete as directed by the Engineer in charge of works and as per the technical specifications. | |||||
| 6.01 | Using New Stones | 23.2 | Cubic Meter | 6,207.53 | ₹1,44,014.7 |
| 6.02 | Using Old Stones | 6.1 | Cubic Meter | 5,309.65 | ₹32,388.86 |
| 7 | Pointing with Cement Mortar 1:3 ( one cement and four M sand ) using 20 mm thick including curing and finishing etc complete complying with std specification. | 25.2 | Square Meter | 323.45 | ₹8,150.94 |
| 8 | Plastering with cement mortar 1:4 (One cement and four M sand ) 20 mm thick - 10m2 including curing, finishing etc., complete complying with the standard specification | 60.84 | Square Meter | 584.8 | ₹35,579.23 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
document39.pdf
Tender Documents • 0.64 MB
BOQ_865361.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .