Tender Value
₹3.2 Cr
EMD Value
₹3.2 L
Closing Date
2 Sept 2026, 5:00 pm
Executive Engineer (Central Tender Cell)
Central Tender Cell, BMC, ICOMC Tower, Unit-9, Satyanagar
Peripheral development and construction on Drain No. 8 at OUAT Farm.
2026_ORULB_138983_1
BMC-EE-Tender Cell-54/2026-27 dt. 14.08.2026
Open Tender
Civil Works - Others
Percentage
180 days
BMC, AREA
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹3.2 L
Yes
Office Chamber of EE(Central Tender Cell)
18 Aug 2026
18 Aug 2026
3 Sept 2026
18 Aug 2026
2 Sept 2026
18 Aug 2026
18 Aug 2026 - 24 Aug 2026
24 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantlling and removing cement concrete including stacking the useful materials for re-use and removing the debries within 50mtr lead as per the direction of the engineer in charge. | 1.8 | cum | 858.58 | ₹1,545.44 |
| 2 | Dismantlling and removing R.C.C. columns beams slab, staircase landing, lintels including stacking the useful materials for re-use and removing the debries within 50mtr lead. (Data for 1 Cum) | 2 | cum | 1,696.95 | ₹3,393.9 |
| 3 | Earth work excavation in all kinds of soil for foundation within initial lead of 50 m and initial lift of 1.5 m including rough dressing and levelling the bed as per the specification approved by the department and direction of Engineer-in-charge Up to 1.5m depth | 4,739.76 | cum | 276.89 | ₹13,12,392.15 |
| 4 | 1.5m to 3.0m depth | 3,764.76 | cum | 379.12 | ₹14,27,295.81 |
| 5 | 3.0m to 4.5 m depth | 514.45 | cum | 516.49 | ₹2,65,708.28 |
| 6 | Conveyance of excavated materials such as rough stone, metal, khoa, chips, sand, surki,quarry rubbish, moorum, laterite stone, washed gravel, flyash and earth away from the work site by mechanical means including loading and unloading and depositing the same within 5km truck lead as per the direction of the Engineer in charge. | 6,325.95 | cum | 160.68 | ₹10,16,453.65 |
| 7 | Filling in foundation with sand well watered & rammed including cost, conveyance, royalty & taxes etc. complete of all materials to work site as the specification approved by the department and direction of Engineer in charge. | 390.98 | cum | 519.79 | ₹2,03,227.49 |
| 8 | Cement Concrete (1:3:6) with 4cm size Hard Granite Crusher Broken metal including all cost, conveyance, royalty & taxes etc.compete of all materials to work site as per specification approved by the department & direction of Engineer-in-charge. | 210.98 | cum | 6,160.3 | ₹12,99,700.09 |
| 9 | Rigid smooth centring & shuttering including false work & removing the same after casting etc. complete. (1) RCC Foundation,plinth Band,footing,bases of columns, mass concrete & precast slabs etc. in ground floor. | 836.04 | sqm | 250.3 | ₹2,09,260.81 |
| 10 | Rigid smooth centring & shuttering including false work & removing the same after casting etc. complete. (2) RCC walls & fins including attached pillasters in ground floor. | 4,695.2 | sqm | 1,074.4 | ₹50,44,522.88 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
DTCN_54.pdf
Tender Documents • 0.92 MB
BOQ_606386.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].