| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.3 LAccepted-AOC 6 641 041 | COIMBATORE | TAMIL NADU | 641041 | L1 | Accepted-AOC Accept | |
| 2 | L2₹37.3 L+₹378 (0.01%)Rejected-AOC 93 SOUTH ZONE COIMBATORE CORPORATION | ERODE | TAMIL NADU | 638459 | L2 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | SHARVESH AND COMPANY L2 | A S P AND CO L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork Excavation in ORDINARY SOIL (SS20B) Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Sand, silt or other loose soil, wet sand or silt notunder water, light black cotton soil, sandy loam and ordinary soil including excavated earth (SS20B) | 615 | M3 | 90.6 ₹55,719 | 90.5 ₹55,657.5 Lowest |
| 2.00 | Conveying the excavated earth from the site to the distance of 15kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges etc complete as per the direction of departmental officers. | 615 | M3 | 166.5 ₹1,02,397.5 | 166 ₹1,02,090 Lowest |
| 3.00 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and 5306.80 m33 materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 342 | M3 | 5,338 ₹18,25,596 Lowest | 5,338 ₹18,25,596 Lowest |
| 4.00 | Centering with steel centering for revetment, drain and culvert upto 1.20m depth using MS sheet of size 0.90X0.60m 10 gauge thick and stiffened with MS 'L' angle wood runners of size 0.075 X 0.05 three rows with 270.30 M21 angle wood runners of size 0.075 X 0.05 three rows with support by casurina pullys 0.075 cm at 0.45 m length including cost of nails etc., Area. 10.80 sq.mtr (upto 4 Feet etc., Completed | 83 | M2 | 281 ₹23,323 Lowest | 281 ₹23,323 Lowest |
| 5.00 | Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification _ | 257 | M3 | 6,680.5 ₹17,16,888.5 Lowest | 6,680.5 ₹17,16,888.5 Lowest |
| 6.00 | Supply and Fixing of Bituminous Pad includiing all Labour Charges etc., Completed | 18 | m3 | 479.5 ₹8,631 | 479 ₹8,622 Lowest |
Tender Value
₹44.8 L
EMD Value
₹44,750
Closing Date
5 Jun 2025, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Providing Cement Concrete Flooring at Mohan Nagar Cut Road 1 2 3 Muniyappan Koil Street and Nagarajapuram Cut Road 1 2 3 6 7 8 in Ward No.97 South Zone
2025_MAWS_564577_5
e28/2025-Two Cover
Open Tender
Civil Works
Works
150 days
Coimbatore corporation
AS PER THE TENDER DOCUMENT
4 documents required · 4 mandatory
₹0
₹44,750
19 Aug 2025
4 Jun 2025
6 Jun 2025
4 Jun 2025
5 Jun 2025
4 Jun 2025
Amount
Earthwork Excavation in ORDINARY SOIL (SS20B) Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Sand, silt or other loose soil, wet sand or silt notunder water, light black cotton soil, sandy loam and ordinary soil including excavated earth (SS20B)
Conveying the excavated earth from the site to the distance of 15kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges etc complete as per the direction of departmental officers.
Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and 5306.80 m33 materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Centering with steel centering for revetment, drain and culvert upto 1.20m depth using MS sheet of size 0.90X0.60m 10 gauge thick and stiffened with MS 'L' angle wood runners of size 0.075 X 0.05 three rows with 270.30 M21 angle wood runners of size 0.075 X 0.05 three rows with support by casurina pullys 0.075 cm at 0.45 m length including cost of nails etc., Area. 10.80 sq.mtr (upto 4 Feet etc., Completed
Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification _
Supply and Fixing of Bituminous Pad includiing all Labour Charges etc., Completed
SHARVESH AND COMPANY (BID ID -1359408)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .