Tender Value
₹11.3 L
EMD Value
₹12,000
Closing Date
17 Nov 2023, 3:00 pmClosed
The Block Development Officer VP
Block Development Office Bargur
Krishnagiri DT Bargur Block RBIOCGS 2022-23 3 Works Repair And Renovation of RCC School Building At Valasagoundanoor Village at Valasagoundanoor Panchayat BRG_33
2023_RDTN_384789_1
7278_2023_R9Dt_13_10_2023
Open Tender
Civil Works - Others
Item Rate
180 days
Block Development Office Bargur
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹12,000
12 Dec 2023
2 Nov 2023
17 Nov 2023
2 Nov 2023
17 Nov 2023
2 Nov 2023
Amount
1.Repair and Renovation of RCC Roof Building PUPS at Valasagoundanoor Valasagoundanoor Estimate Amount: Rs.538000/-
Towards clean removal of damaged plastering surfaces including all cost and conveyance of men and materials
Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three M.Sand) 10mm thick including hacking the surfaces, providing cement mortar nosing, beading for sunshades, staircases, steps, landing slabs and curing, etc., in all floors complying with standard specification and as directed by the departmental officers
Towards clean removal of damaged plastering surfaces including all cost and conveyance of men and materials
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Towards chipping and roughening the concrete surfaces including all cost and conveyance of men and materials
Paving the floor with kotta stone of size 610x610x 20mm cm 1:3 20mm thick
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone M.Sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use)
Painting two coats with approved Black Oxide for Old Black board
Provision For rain Water Down Fall Pipe
Towards provision for Chappal rack outside the class room
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Providing cuddapah slab 38 to 40mm for shelfs etc., all complete
labour charges for fixing cuddapah slab 38 to 40mm for shelfs etc., all complete
Towards drawing Bala painting including all cost and conveyance of men and materials etc.,(the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Shorter wall
Longer wall
Verandah pillars painting with pictures of birds, domestic animals, wild animals, creatures living in sea with names(both English and Tamil)
Ceiling Solar system Painting Included Charges All cost And Conveyance
Towards Drawing in Emulasion Logo Including All Cost And Conveyance of Man and Metireals
Towards drawing ENNUM EZHUTHUM logo inlcuding all cost and conveyance of men and materials etc.,
Provision for Name Board including all cost and conveyance
2. Repair and Renovation of RCC Roof Building PUPS at Valasagoundanoor Valasagoundanoor Estimate Amount: Rs.542000/-
Towards clean removal of damaged plastering surfaces including all cost and conveyance of men and materials
Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three M.Sand) 10mm thick including hacking the surfaces, providing cement mortar nosing, beading for sunshades, staircases, steps, landing slabs and curing, etc., in all floors complying with standard specification and as directed by the departmental officers
Towards clean removal of damaged plastering surfaces including all cost and conveyance of men and materials
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Towards chipping and roughening the concrete surfaces including all cost and conveyance of men and materials
Paving the floor with kotta stone of size 610x610x 20mm cm 1:3 20mm thick
Dismantling of pressed tiles & weathering course including all cost and conveyance of men and materials etc/. All complete
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone M.Sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use)
Painting two coats with approved Black Oxide for Old Black board
Provision For rain Water Down Fall Pipe
Towards provision for Chappal rack outside the class room
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Providing cuddapah slab 38 to 40mm for shelfs etc., all complete
labour charges for fixing cuddapah slab 38 to 40mm for shelfs etc., all complete
Towards drawing Bala painting including all cost and conveyance of men and materials etc.,(the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Shorter wall
Longer wall
Verandah pillars painting with pictures of birds, domestic animals, wild animals, creatures living in sea with names(both English and Tamil)
Ceiling Solar system Painting Included Charges All cost And Conveyance
Towards Drawing in Emulasion Logo Including All Cost And Conveyance of Man and Metireals
Towards drawing ENNUM EZHUTHUM logo inlcuding all cost and conveyance of men and materials etc.,
Provision for Name Board including all cost and conveyance
Provision for Lock and Key
3. Repair and Renovation of School Boys toilet at Valasagoundanoor PUPS H/O Valasagoundanoor Estimate Amount: Rs.50000/-
Towards provision for RCC rings for leach pit including all cost and coneyance of men and materials etc.,
Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use)
Towards provision for Sanitary fittings including all cost and conveyance etc., all complete
32mm PVC Pipe
32mm PVC Bend
25mm PVC Tee
Toward Water Supply Arrangements
110mm PVC Pipe
110mm PVC Bend
Supply of door size 1.10 x 2.10 m - 1No
Labour charges for fixing door including cost and conveyence of all materials to site and labour charges etc completed.
Towards drawing Bala painting including all cost and conveyance of men and materials etc.,(the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Towards drawing of clean environment nlcuding all cost and conveyance of men and materials etc.,
Towards drawing ENNUM EZHUTHUM logo inlcuding all cost and conveyance of men and materials etc.,
Provision for Name Board including all cost and conveyance
Provision for lock and key
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K Sundaramoorthy
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .