Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹57.9 CrAdmitted-Finance T 3 PARMESHWARI BLDG CHATRIBARI RD GUWAHATI ASSAM 781001 | KAMRUP METRO | ASSAM | 781001 | ₹57.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹63.0 Cr+₹5.1 Cr (8.74%)Admitted-Finance INFINITY THINK TANK TOWER II 10TH FLOOR PLOT NO A3 BLOCK G SECTOR V SALT LAKE CITY KOLKATA 700091 WB | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | ₹63.0 Cr+₹5.1 Cr (8.74%) | L2 | Admitted-Finance |
| 3 | L3₹69.8 Cr+₹11.9 Cr (20.6%)Admitted-Finance | ₹69.8 Cr+₹11.9 Cr (20.6%) | L3 | Admitted-Finance |
| 4 | L4₹74.4 Cr+₹16.5 Cr (28.5%)Admitted-Finance 4A SWAIKA CENTRE POLLOCK STREET DALHOUSIE KOLKATA WEST BENGAL 700001 | KOLKATA | WEST BENGAL | 700001 | ₹74.4 Cr+₹16.5 Cr (28.5%) | L4 | Admitted-Finance |
| 5 | L5₹75.4 Cr+₹17.4 Cr (30.1%)Admitted-Finance | ₹75.4 Cr+₹17.4 Cr (30.1%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | T N T Projects Ltd L1 | Ms HEMEN DEKA L5 | Techno Power Enterprises Private Limited L2 | Cabcon India Limited L4 | Texmaco Rail and Engineering Limited L6 | Laser Power & Infra Limited L3 | KAY CEE ENERGY & INFRA LIMITED L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Tower Superstructure | ||||||||||
| 1.01 | Fabrication, galvanising and supply of various types of towers and tower parts, tower body/leg (equal & unequal) extensions including hangers, D-shackles, pack washers, Hex. Bolts & nuts including step bolts, anti-theft bolts & nuts, washers etc. | 825 | MT | 1,13,097 ₹9,33,05,025 | 1,20,000 ₹9,90,00,000 | 1,18,414 ₹9,76,91,550 | 1,36,670.8 ₹11,27,53,410 | 1,41,248 ₹11,65,29,600 | 1,11,882 ₹9,23,02,650 Lowest | 1,15,440 ₹9,52,38,000 |
| 2.00Stub sets | ||||||||||
| 2.01 | Fabrication, galvanising and supply of stubs and cleats for various types of towers with pack washers including Hex. bolts & nuts, plain washers etc. | 48 | MT | 1,13,097 ₹54,28,656 | 1,20,000 ₹57,60,000 | 1,18,414 ₹56,83,872 | 1,39,460 ₹66,94,080 | 1,37,430 ₹65,96,640 | 1,11,882 ₹53,70,336 Lowest | 1,19,220 ₹57,22,560 |
| 3.00Stub setting | ||||||||||
| 3.01 | Stub setting template including galvanized nuts & bolts etc.
(DA=4Sets, DB=2Sets, DC=2Sets & DD=4Sets) | 12.13 | MT | 1,25,032 ₹15,16,638.16 | 1,20,000 ₹14,55,600 | 1,18,414 ₹14,36,361.82 | 1,33,881.6 ₹16,23,983.81 | 1,01,800 ₹12,34,834 | 89,505 ₹10,85,695.65 Lowest | 1,19,220 ₹14,46,138.6 |
| 4.00Power Conductor | ||||||||||
| 4.01 | ACSR Zebra conductor (Route length 26.5km) | 190.8 | KM | 5,88,840 ₹11,23,50,672 | 6,30,000 ₹12,02,04,000 | 6,48,458 ₹12,37,25,786.4 | 6,87,976.33 ₹13,12,65,883.76 | 6,48,975 ₹12,38,24,430 | 4,75,167 ₹9,06,61,863.6 Lowest | 5,44,110 ₹10,38,16,188 |
| 5.00Insulators | ||||||||||
| 5.01 | 120KN, single tension disc insulator string complete with hardware fittings including tension clamp for zebra conductor comprising of 15 disc insulators(B&S type) per string | 588 | Set | 24,097 ₹1,41,69,036 | 10,000 ₹58,80,000 | 1,128 ₹6,63,264 Lowest | 29,346.57 ₹1,72,55,783.16 | 27,995 ₹1,64,61,060 | 17,269 ₹1,01,54,172 | 17,700 ₹1,04,07,600 |
Tender Value
Refer Docs
EMD Value
₹1.6 Cr
Closing Date
18 Aug 2026, 12:00 pmClosed
CGM PPnD
AEGCL HQ First Floor Bijulee Bhawan
Turnkey Construction of 220 KV Sonapur-TSAT Double Circuit Transmission Line for redundant power supply to TATA semiconductor
2026_AEGCL_53153_1
AEGCL/MD/Tech-1142/TATA Semiconductor/Bid/line
Open Tender
Electrical Works
Turn-key
730 days
Sonapur
Please refer Tender documents.
7 documents required · 7 mandatory
₹5,000
₹1.6 Cr
Yes
29 Aug 2026
20 Jul 2026
19 Aug 2026
20 Jul 2026
18 Aug 2026
2 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Tower Superstructure | |||||
| 1.01 | Fabrication, galvanising and supply of various types of towers and tower parts, tower body/leg (equal & unequal) extensions including hangers, D-shackles, pack washers, Hex. Bolts & nuts including step bolts, anti-theft bolts & nuts, washers etc. | 825 | MT | - | - |
| 2Stub sets | |||||
| 2.01 | Fabrication, galvanising and supply of stubs and cleats for various types of towers with pack washers including Hex. bolts & nuts, plain washers etc. | 48 | MT | - | - |
| 3Stub setting | |||||
| 3.01 | Stub setting template including galvanized nuts & bolts etc.
(DA=4Sets, DB=2Sets, DC=2Sets & DD=4Sets) | 12.13 | MT | - | - |
| 4Power Conductor | |||||
| 4.01 | ACSR Zebra conductor (Route length 26.5km) | - | KM | - | - |
| 5Insulators | |||||
| 5.01 | 120KN, single tension disc insulator string complete with hardware fittings including tension clamp for zebra conductor comprising of 15 disc insulators(B&S type) per string | 588 | Set | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.42 MB
Bid_Vol-I.pdf
Tender Documents • 1.87 MB
Volume-II_0.0 Cover Page.docx
Tender Documents • 0.03 MB
Volume-II_0.0 Scope of the Work.docx
Tender Documents • 0.02 MB
Volume-II_0.0 Table Content.docx
Tender Documents • 0.02 MB
Volume-II_1.0 Technical Specification Survey & Soil Investigation.docx
Tender Documents • 0.47 MB
Volume-II_12.0 Technical specification of Lightning Arrester.docx
Tender Documents • 0.02 MB
Volume-II_2.0 Tecnical specifications of Pile Foundation (Solo).docx
Tender Documents • 0.02 MB
Volume-II_20.0 Technical specifications of EHV XLPE Cable with termination.docx
Tender Documents • 0.21 MB
Volume-II_26.0 Technical specifications for design and fabrication of substation steel structures.docx
Tender Documents • 0.03 MB
Volume-II_35.0 Technical specifications for Earthing and DSLP.docx
Tender Documents • 0.14 MB
Volume-II_37.0 Scope and General Technical Condition for transmission line .docx
Tender Documents • 0.07 MB
Volume-II_38.0 Technical specification for design and fabrication of transmission towers.docx
Tender Documents • 0.05 MB
Volume-II_39.0 Technical specifications for tower foundation of 220kV and 132kV lines.docx
Tender Documents • 0.06 MB
Volume-II_41.0 Technical specification for erection of transmission tower.docx
Tender Documents • 0.02 MB
Volume-II_43.0 Technical specifications for ACSR conductor.docx
Tender Documents • 0.03 MB
Volume-II_44.0 Technical specifications for insulator string hardware.docx
Tender Documents • 0.20 MB
Volume-II_45.0 Technical specifications for disc insulators.docx
Tender Documents • 0.03 MB
Volume-II_47.0 Technical specifications for OPGW.docx
Tender Documents • 0.18 MB
Volume-II_GTR Data (Annexure).docx
Tender Documents • 0.02 MB
Additional Documents_APPROVED TOWER SCHEDULE.pdf
Additional Documents • 5.93 MB
Additional Documents_Bank Details of AEGCL.pdf
Additional Documents • 0.06 MB
Additional Documents_Earthing_EARTHING-0001.pdf
Additional Documents • 0.04 MB
Additional Documents_Earthing_EARTHING-0002.pdf
Additional Documents • 0.03 MB
Additional Documents_Earthing_EARTHING.pdf
Additional Documents • 0.04 MB
Additional Documents_FINAL ROUTE 610 X 1000.pdf
Additional Documents • 2.60 MB
Additional Documents_JMC Format.xlsx
Additional Documents • 0.02 MB
Additional Documents_Pile foundatio 220kV upto +9M.pdf
Additional Documents • 0.12 MB
Additional Documents_Pile foundation 220kV above +9m.pdf
Additional Documents • 0.12 MB
Additional Documents_TREE ENUMERATION.pdf
Additional Documents • 9.70 MB
BOQ_83739.xls
BOQ • 0.38 MB
Time_extension_I.pdf
PDF • 0.63 MB
Minutes_of_the_Prebid_Meeting.pdf
PDF • 4.86 MB
CORRIGENDUM-I.pdf
PDF • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .