Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹34.5 L
EMD Value
₹34,500
Closing Date
24 Nov 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
commissioner
13,sendurai main rd,elil nagar,dindigul
Formation of bituminous road in Anna Nagar South (078014R512), Siluvathur Road Cross Street-078017R1334 and Supreme Nagar (078014R509) in Dindigul City Municipal Corporation.
2026_MAWS_722451_3
11491/2026/E4
Open Tender
Civil Works
Works
180 days
13, sendurai main rd, elil nagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹34,500
13,sendurai main rd,elil nagar,dindigul
5 Nov 2026
5 Nov 2026
24 Nov 2026
5 Nov 2026
24 Nov 2026
5 Nov 2026
12 Nov 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Preparing the Existing surface to laying the road to Proper Gradient and remove the loose soil without damage the Water Supply and other Pipe lines. The Rate inclusive of all charges such as Earth work and remove the same away from the site etc, complete as per standard specifications. | 1,500 | m3 | - | - |
| 2 | Providing Granular surface base to the required surface using murram, Granular soil of size varying from 4mm to 75mm including cost of material and cost of labour for stacking, spreading and consolidating layer by layer (Each layer not exceeding 100mm) including hire charges of Roller etc, complete as per the direction of Departmental officers. | 150 | m3 | - | - |
| 3 | Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 225 | m3 | - | - |
| 4 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications. | 1,500 | m2 | - | - |
| 5 | Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications | 1,500 | m2 | - | - |
| 6 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50- 13.20mm, 0.25cum of 13.20 -2.36mm and 0.23 cum of 2.6mm & below and with 53.20 kgs of VG30/ bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site , heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity , conveying the mix by tipper trucks to work site , spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by vibratory / pneumatic roller to the required density etc., including labour for attending to paver ay site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler , tipper trucks , paver Finisher ,/9 m paver finisher, vibratory / pneumatic rollers and all other tools and plant required , including fuel and all other incidental charges etc., complete and per specification using CMP as per clause 505 MORTH Rev-5. | 75 | m3 | - | - |
| 7 | Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications. | 1,500 | m2 | - | - |
| 8 | Providing and laying Bituminous Concrete to 30mm thick using 0.13cum of 19.00- 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26 cum of 2.36mm & below and with 47.28 kgs of VG30 & 3.02 kg of plastic waste (total.50.30 kg) bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site , heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity , conveying the mix by tipper trucks to work site , spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tone vibratory / pneumatic roller to the required density etc., Including labour for attending to paver ay site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler , tipper trucks , paver Finisher ,/9 m paver finisher, vibratory / pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., Complete and per specification using CMP as per clause 507 MORTH Rev-5 Specifications. | 45 | m3 | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.43 MB
3450.pdf
Tender Documents • 0.67 MB
BOQ_867528.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .