Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹2.4 L
EMD Value
₹4,800
Closing Date
11 Oct 2022, 6:00 pmClosed
EXECUTIVE ENGINEER REW DODA
OFFICE OF THE EXECUTIVE ENGINEER REW DODA
Constt of Water Tank at Kanda Pyt Upper Behota Block Marmat (PRIs Grant) 2nd Call
2022_RDPR_190805_1
e-NIT No84/capex of REW Doda 2022-23 DT01.10.2022
Open Tender
Civil Works
Item Rate
30 days
DODA
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Rural Development and Panchayati Raj
₹4,800
24 Oct 2022
1 Oct 2022
12 Oct 2022
1 Oct 2022
11 Oct 2022
1 Oct 2022
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil :
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) including carriage of material all complete
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) including carriage of material all complete
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. including carriage of material all complete
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc
Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms. Shelves (cast-in-situ)
15mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand)
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate.
Labour for futting and fixing of washout /outlet/inlet pipes including cost of fitting materials lumpsum
CIB (citizen information Board ) size 4'00"x5'00"x0'9" (above plinth level) with tepered top having 20 degree slope in Brick Masonary(1:4) including plaster , paint, lettering and logos as per instruction of Engineer -in-charge including carriage of material. ( complete job)
Mohd Ishfaq
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .