Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹2.8 LAWARDED | ₹2.8 L | AWARDED |
Tender Value
₹2.8 L
EMD Value
₹7,063
Closing Date
23 Jul 2025, 10:30 pmClosed
Directorate of Municipal Administration
Construction of Retaining wall near BEO Office road
DMA/2025-26/BD/WORK_INDENT44739
DMA/2025-26/BD/WORK_INDENT44739
Open
Buildings
Electronic Documents, First(One Cover)
DMA Town Municipal Council Mudalagi
₹500
₹7,063
16 Jul 2025
16 Jul 2025
23 Jul 2025
Construction of Retaining wall near BEO Office road
Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works, as per drawing and technical specifications, inc...
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in double row including fixing collar with cement mortar 1:2 but excluding excavation,...
Erection and positioning of RCC Hume pipe pump house/Cistern on size stone masory platform including transportation charges and handling,finishing with all necessary tools ,plants and materials etc.,c...
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Materia...
Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine agg...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Form Work: As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate For Drain Form Works
Removal of Unserviceable Soil with Disposal upto a suitable
distance as directed by the Engineer incharge of work CSR 2023-24 Vol 3 Item no 3.1
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .