Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹181.7 CrAdmitted-Finance RG METRO ARCADE SECTOR 11 ROHINI DELHI 110085 | DELHI | NORTH WEST DELHI | DELHI | 110085 | L1 | Admitted-Finance | |
| 2 | L2₹190.2 Cr+₹8.5 Cr (4.66%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹229.4 Cr+₹47.7 Cr (26.2%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹240.8 Cr+₹59.1 Cr (32.6%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹251.1 Cr+₹69.4 Cr (38.2%)Admitted-Finance 1 PARSWADA POST SHAHAGANJ VILLAGE | INDORE | INDORE | MADHYA PRADESH | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Dineshchandra R Agrawal Infracon Pvt. Ltd. L9 | Triveni Engineering and Industries Ltd. L8 | VA TECH WABAG LTD L5 | AYYAPPA INFRA PROJECTS PVT.LTD L3 | JWIL INFRA Limited L7 | BEIL INFRASTRUCTURE LIMITED L6 | ENVIRO INFRA ENGINEERS LIMITED L1 | East India Udyog Ltd L2 | Ankita Construction L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00A) Design and Build Contract of various units for following: | ||||||||||||
| 1.01 | A-1 Design engineering and submission of drawing | 1 | Nos | 2,68,11,000 ₹2,68,11,000 | 1,06,00,000 ₹1,06,00,000 | 2,92,00,000 ₹2,92,00,000 | 3,96,00,000 ₹3,96,00,000 | 3,00,00,000 ₹3,00,00,000 | 1,74,15,000 ₹1,74,15,000 | 3,00,00,000 ₹3,00,00,000 | 77,16,886 ₹77,16,886 | 50,00,000 ₹50,00,000 Lowest |
| 1.02 | A-2 Capital cost for Zindpur.
1. Sewage Pumping Station – Zindpur & Hiranki {From
Price schedule-A2(a)}
2. Sewage treatment Plant{From Price schedule-A2 (b)}
3. Disposal Main up to Disposal point{From Price
schedule-A2(c)} | 1 | Nos | 1,84,72,77,900 ₹1,84,72,77,900 | 1,95,95,00,000 ₹1,95,95,00,000 | 1,43,06,99,996.73 ₹1,43,06,99,996.73 | 1,34,64,00,000 ₹1,34,64,00,000 Lowest | 1,88,57,19,535 ₹1,88,57,19,535 | 1,37,51,24,981 ₹1,37,51,24,981 | 1,50,00,00,000 ₹1,50,00,00,000 | 1,40,54,01,489 ₹1,40,54,01,489 | 1,50,00,00,000 ₹1,50,00,00,000 |
| 2.00B) Operation and maintenance Cost | ||||||||||||
| 2.01 | B-1 All in all Operation and Maintenance cost for 15 years at Zindpur
WWTP (From Price schedule-B1) | 1 | Nos | 80,70,11,100 ₹80,70,11,100 | 67,95,00,000 ₹67,95,00,000 | 73,70,44,862.04 ₹73,70,44,862.04 | 59,40,00,000 ₹59,40,00,000 | 73,61,16,326 ₹73,61,16,326 | 68,47,00,000 ₹68,47,00,000 | 20,29,13,223.58 ₹20,29,13,223.58 Lowest | 42,46,81,625 ₹42,46,81,625 | 49,99,20,756 ₹49,99,20,756 |
| 3.00C) Electricity Cost | ||||||||||||
| 3.01 | C-1 Annual Net Electricity Consumption for 15 Year (KWh/Year) for
Zindpur WWTP, Zindpur SPS & Hiranki SPS (From Table 10) | 1 | Nos | 1,29,23,70,465 ₹1,29,23,70,465 | 64,39,14,750 ₹64,39,14,750 | 31,42,12,440 ₹31,42,12,440 | 31,35,98,145 ₹31,35,98,145 | 47,06,98,815 ₹47,06,98,815 | 55,55,59,524.9 ₹55,55,59,524.9 | 8,39,31,750 ₹8,39,31,750 | 6,37,83,750 ₹6,37,83,750 Lowest | 40,33,43,452 ₹40,33,43,452 |
Tender Value
Refer Docs
EMD Value
₹2.6 Cr
Closing Date
24 Oct 2025, 3:00 pmClosed
EXECUTIVE ENGINEER (C) DR. III,
EXECUTIVE ENGINEER (C) DR. III, Kanhaiya Nagar, NEW DELHI- 110035
NIT No. 02 (2025-26)/EE(C)DR-III
2025_DJB_276914_1
NIT No. 02 (2025-26)/EE(C)DR-III
Open Tender
Composite Works
Works
5475 days
EXECUTIVE ENGINEER (C) DR. III
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,500
DJB EMD A/c No. 50448339804 at Indian Bank,
₹2.6 Cr
Office of SE(C)-5,
4 Dec 2025
15 Aug 2025
24 Oct 2025
15 Aug 2025
24 Oct 2025
28 Aug 2025
25 Aug 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1A) Design and Build Contract of various units for following: | |||||
| 1.01 | A-1 Design engineering and submission of drawing | - | Nos | - | - |
| 1.02 | A-2 Capital cost for Zindpur.
1. Sewage Pumping Station – Zindpur & Hiranki {From
Price schedule-A2(a)}
2. Sewage treatment Plant{From Price schedule-A2 (b)}
3. Disposal Main up to Disposal point{From Price
schedule-A2(c)} | - | Nos | - | - |
| 2B) Operation and maintenance Cost | |||||
| 2.01 | B-1 All in all Operation and Maintenance cost for 15 years at Zindpur
WWTP (From Price schedule-B1) | - | Nos | - | - |
| 3C) Electricity Cost | |||||
| 3.01 | C-1 Annual Net Electricity Consumption for 15 Year (KWh/Year) for
Zindpur WWTP, Zindpur SPS & Hiranki SPS (From Table 10) | - | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.79 MB
Volume_VI.pdf
Tender Documents • 0.83 MB
BOQ_365295.xls
BOQ • 0.34 MB
Volume_I.pdf
Tender Documents • 2.68 MB
Volume_III.pdf
Tender Documents • 1.46 MB
Volume_VII.pdf
Tender Documents • 1.27 MB
Volume_V.pdf
Tender Documents • 1.36 MB
Volume_IV.pdf
Tender Documents • 2.37 MB
Volume_VIII.pdf
Tender Documents • 2.10 MB
Volume_II.pdf
Tender Documents • 1.24 MB
Corr5.pdf
PDF • 0.49 MB
Corri4.pdf
PDF • 0.55 MB
Corri3.pdf
PDF • 4.71 MB
Corri2.pdf
PDF • 0.43 MB
Corrigendum1.pdf
PDF • 0.98 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .