| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC 1 KHEMAJI TOLA SANDHA SARAN BIHAR 841301 | SARAN | BIHAR | 841301 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹2.0 L+₹1,495.75 (0.75%)Rejected-Finance | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | Chakravartty Constructions L2 | SURYA AND CO L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling Plain Cement Concrete all materials conveyance of all labour charges etc complete.as per standard Specifications | 17 | m3 | 490 ₹8,330 | 486.2 ₹8,265.4 Lowest |
| 2.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 68 | m3 | 250 ₹17,000 | 246.52 ₹16,763.36 Lowest |
| 3.00 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 9 | m3 | 5,215 ₹46,935 | 5,212.15 ₹46,909.35 Lowest |
| 4.00 | Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. | 9 | m3 | 6,000 ₹54,000 | 5,995.91 ₹53,963.19 Lowest |
| 5.00Supply and delivery of 90 mm Dia 6kg/cm2 Pvc Pipe including cost and conveyance of all materials to site and laying and jointing of fixing all labour charges etc complete. | |||||
| 5.01 | 90 mm Dia 6kg/cm2 Pvc Pipe | 280 | Rm | 235 ₹65,800 | 232.3 ₹65,044 Lowest |
| 6.00Lowering PVC/ DWSC rigid pipes and specials to trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste including of all labour charges etc complete. | |||||
| 6.01 | 90 mm Dia 6kg/cm2 Pvc Pipe | 280 | Rm | 20 ₹5,600 | 19.11 ₹5,350.8 Lowest |
| 7.00 | Refilling with excavated soil (other than sand) complying with standard ecification for filling in foundation and basement. | 59 | m3 | 45 ₹2,655 | 42.85 ₹2,528.15 Lowest |
Tender Value
₹2.6 L
EMD Value
₹5,200
Closing Date
12 Aug 2025, 3:00 pmClosed
Executive Officer
Unjalur Town Panchayat
Extension of pipe line 110m at Ward No.09 ,Panappalayam Nadar Street in Unjalur Town Panchayat.
2025_DTP_590522_1
215/2025
Open Tender
Pipe Laying Works
Works
180 days
Unjalur Town Panchayat
As Per Tender Document
2 documents required · 2 mandatory
₹0
₹5,200
22 Sept 2025
8 Aug 2025
12 Aug 2025
8 Aug 2025
12 Aug 2025
8 Aug 2025
Amount
Dismantling Plain Cement Concrete all materials conveyance of all labour charges etc complete.as per standard Specifications
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum
Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications.
Supply and delivery of 90 mm Dia 6kg/cm2 Pvc Pipe including cost and conveyance of all materials to site and laying and jointing of fixing all labour charges etc complete.
90 mm Dia 6kg/cm2 Pvc Pipe
Lowering PVC/ DWSC rigid pipes and specials to trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste including of all labour charges etc complete.
90 mm Dia 6kg/cm2 Pvc Pipe
Refilling with excavated soil (other than sand) complying with standard ecification for filling in foundation and basement.
Chakravartty Constructions (BID ID -1424885)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .