Loading…
Loading…
Tender Value
₹2.0 L
EMD Value
₹3,980
Closing Date
9 Jun 2026, 5:00 pm4d left
BHUPENDER SINGH
DIV 2 Hissar
ANNUAL MAINTENANCE ESTIMATE FOR STORM WATER DRAINAGE SCHEME IN SECTOR 14P-II AND SECTOR 33P HISAR (2026-2027)
2026_HBC_526017_1
202669948C93 2478 440B 95DB 351B83EBCD2C260HSV
Open Tender
Civil Works
60 days
Hisar
109/2026
2 documents required · 2 mandatory
₹250
Yes
₹3,980
Yes
2 Jun 2026
2 Jun 2026
10 Jun 2026
2 Jun 2026
9 Jun 2026
2 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | [20.114.1]Supplying erection, testing of fully
automatic electric control panel board for
T/Wells in Pump Chamber consisting of
MS sheet of thickness 14 gauge duly
painted box type floor mounted made of
angle Frame containing 1 no. fully
automatic air brake starter suitable for
Motor of the following capacity, Min
switch of suitable range with HRC fuse, 1
no. volt meter (0 to 500 volts), 1 No.
Amp. Meter of 0 to 100 amp. 3 sets of
indicating lamp capacitor of suitable
capacity and 1 no. single phase preventers
with the timer switch including wiring in
panel board and suitable electric energy
meter wiring in Electric Control Panel
Board complete in all respect as per
specification given in Schedule No. II,
Including MCB, suitable, Capacitor,
Wooden Box etc as per site
requirement complete in all respect. 1. 10 HP Motor | 1 | Each | 11,595 | ₹11,595 | BI01010001010000000000000515BI0100001115 |
| 2 | [21.106.22]Supplying, erection, testing and
commissioning of submersible motor
pumping set non clog for sewerage
having head 15.00 m as per the indicated
requirements of discharge in LPM and
power capacity in BHP as per IS marked
including all accessories (like SS Pipes,
SS Chain (Shackle Chain) ,SS Foundation
Bolt, complete base frame, Monorail,
Chain Guide Line, Auto Compiling, Duct
Foot Bend (D/F Bend) etc. complete in all
respect 22. Discharge Capacity (LPM) - 1300
Power Capacity (BHP) - 7.5 | 1 | Each | 82,557 | ₹82,557 | BI01010001010000000000000515BI0100001116 |
| 3 | [22.87.10]Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings This includes jointing of pipes and fittings with one step CPVC solvent cement, trenching, refilling and testing of joints complete as per direction of Engineer in Charge.
External work 10. 150 mm nominal inner dia Pipes | 10 | Metre | 4,706 | ₹47,060 | BI01010001010000000000000515BI0100001117 |
| 4 | [24.2.2.2]LT CABLE 2.2. Laying of underground cable 0.75 metre below ground level covered with sand and bricks including excavation and refilling of trenches.:- 16 Sq mm to 35 sqmm 2 to 4 Core | 100 | Metre | 161 | ₹16,100 | BI01010001010000000000000515BI0100001118 |
| 5 | Providing and fixing Rubber Hose Pipe with labour, material, jointing, nut and bolt and flange etc. with complete commissioning from existing manhole where to fitted Burma tractor mounted to RCC Storm water Drain upto the entire satisfaction of Engineer in-Charge.”. | 28 | Per Mtr. | 1,485 | ₹41,580 | BI01010001010000000000000515BI0100001119 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_604989.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid