Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-Finance P O SALANPUR DIST PASCHIM BARDHAMAN WEST BENGAL INDIA 713357 | SALANPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713357 | ₹4.2 L | L1 | Accepted-Finance As per TC committee recommendation |
| 2 | L2₹4.2 L+₹3,360 (0.81%)Rejected-Finance CHITTRANJAN ROAD NEAMATPUR P O SITARAMPUR DIST PASCHIM BARDHAMAN PIN 713359 | SITARAMPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713359 | ₹4.2 L+₹3,360 (0.81%) | L2 | Rejected-Finance As per TC committee recommendation |
| 3 | L3₹4.2 L+₹3,960 (0.95%)Rejected-Finance LALGANJ PO LALGANJ SALANPUR 713359 WEST BENGAL INDIA | SALANPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713359 | ₹4.2 L+₹3,960 (0.95%) | L3 | Rejected-Finance As per TC committee recommendation |
| Sl No | Description | Qty | Unit | NEW SANTI CONSTRUCTION L1 | M/S SHASTI ENTERPRISE L3 | MAJI ENTERPRISE L2 |
|---|---|---|---|---|---|---|
| 1.00 | 12.5 mtr High mast poles suitable for wind speed of 180 km/hr the entire mast should be Hot dip galvanized and the thickness of Galvanisation should be not less than 85 microne after fabrication intenally in accordance with BS-739. All steel material must comply with BSEN-10025 or equivalent and welding in accordance with BS:5135 & comprising with Lighting and earthing terminal. The Mast should be supplied with head frame & pulley assemvly, LED ,winch bracket,Lantern carriage ring for Luminaries, CG box, arms, resting bracket guide ring, Compesating disc,single spike lighting arrestor, double drum type winch, lanten carriage stainless wire rope of required length and size grade AIS1316 | 2 | Nos | 76,000 ₹1,52,000 Lowest | 76,000 ₹1,52,000 Lowest | 76,000 ₹1,52,000 Lowest |
| 2.00 | RCC foundation with 20 grade concrete considering SBC of soil at 10 T/sq mtr. At 2 meter depth (1.25M X 1.25 M X1.50M) reinforced steel used in foundation 12 mm tor at base and 16 mm tor in pedstrian as per direction | 2 | Nos | 4,800 ₹9,600 Lowest | 4,900 ₹9,800 | 4,800 ₹9,600 Lowest |
| 3.00 | Accessories like MCCB(32A),Electrotechnica timer switch,pipes feeder box etc | 2 | Nos | 19,000 ₹38,000 Lowest | 19,000 ₹38,000 Lowest | 19,000 ₹38,000 Lowest |
| 4.00 | Earthing protection for high mast structure | 2 | Nos | 9,600 ₹19,200 Lowest | 9,800 ₹19,600 | 9,600 ₹19,200 Lowest |
| 5.00 | Installation charge with necessary painting,priming,plastering and brick work | 2 | Nos | 9,000 ₹18,000 Lowest | 9,000 ₹18,000 Lowest | 9,000 ₹18,000 Lowest |
| 6.00 | Transportation charge | 2 | Nos | 7,000 ₹14,000 Lowest | 7,000 ₹14,000 Lowest | 7,000 ₹14,000 Lowest |
| 7.00 | LED Flood light 150 W with IP66 ingress protection and min 15000 lumens with 2 years warranty | 12 | Nos | 9,500 ₹1,14,000 Lowest | 9,500 ₹1,14,000 Lowest | 9,500 ₹1,14,000 Lowest |
| 8.00 | Supply and laying of 2 core 6 sqmm aluminium cable in underground with required sand ,gland socket etc. as required. | 120 | Mtr | 122 ₹14,640 Lowest | 150 ₹18,000 | 150 ₹18,000 |
| 9.00 | Add: Overhead expenses and contigencies @ 10% | 1 | No | 37,944 ₹37,944 Lowest | 37,944 ₹37,944 Lowest | 37,944 ₹37,944 Lowest |
| 10.00 | Add: Provident fund on Labour cost | 1 | No | - | - | - |
Tender Value
₹4.9 L
EMD Value
₹6,200
Closing Date
19 Mar 2026, 6:00 pmClosed
AE EandM
Office of AE EandM
Supply and installation of High mast Tower Light 02 nos with 06 nos 150 W LED luminaries in each tower at Area Complex under Salanpur Area.
2026_ECL_356077_1
ECL/SLN/GM/EnM/ etender/25-26/96, 09.03.2026
Open Tender
Electrical and Maintenance Works
Item Rate
21 days
Salanpur Area
6 documents required · 6 mandatory
₹6,200
31 Mar 2026
9 Mar 2026
20 Mar 2026
9 Mar 2026
19 Mar 2026
9 Mar 2026
9 Mar 2026 - 12 Mar 2026
12.5 mtr High mast poles suitable for wind speed of 180 km/hr the entire mast should be Hot dip galvanized and the thickness of Galvanisation should be not less than 85 microne after fabrication intenally in accordance with BS-739. All steel material must comply with BSEN-10025 or equivalent and welding in accordance with BS:5135 & comprising with Lighting and earthing terminal. The Mast should be supplied with head frame & pulley assemvly, LED ,winch bracket,Lantern carriage ring for Luminaries, CG box, arms, resting bracket guide ring, Compesating disc,single spike lighting arrestor, double drum type winch, lanten carriage stainless wire rope of required length and size grade AIS1316
RCC foundation with 20 grade concrete considering SBC of soil at 10 T/sq mtr. At 2 meter depth (1.25M X 1.25 M X1.50M) reinforced steel used in foundation 12 mm tor at base and 16 mm tor in pedstrian as per direction
Accessories like MCCB(32A),Electrotechnica timer switch,pipes feeder box etc
Earthing protection for high mast structure
Installation charge with necessary painting,priming,plastering and brick work
Transportation charge
LED Flood light 150 W with IP66 ingress protection and min 15000 lumens with 2 years warranty
Supply and laying of 2 core 6 sqmm aluminium cable in underground with required sand ,gland socket etc. as required.
Add: Overhead expenses and contigencies @ 10%
Add: Provident fund on Labour cost
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.34 MB
Tendernotice_2.pdf
PDF • 1.77 MB
Tendernotice_3.pdf
PDF • 0.24 MB
BOQ_368934.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .