Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAccepted-AOC | L1 | Accepted-AOC AS PER BOQ | |
| 2 | L2₹7.1 L+₹9,692.50 (1.39%)Rejected-AOC | L2 | Rejected-AOC AS PER BOQ | |
| 3 | L3₹7.5 L+₹51,884.34 (7.46%)Rejected-AOC | L3 | Rejected-AOC AS PER BOQ |
Tender Value
Refer Docs
EMD Value
₹17,000
Closing Date
17 Feb 2021, 4:00 pmClosed
Executive Engineer, Irrigation Division-2, Kushin
Executive Engineer, Irrigation Division-2, Kushinagar
RE-CONSTRUCTION OF DAMAGED BRIDGES AT KM 1.400 ON GAGALAWA MR IN DISTRICT KUSHINAGAR
2021_UPIDC_554611_18
02/EE ID-2,KU/2020-21
Open Tender
Civil Works
Item Rate
90 days
Irrigation Division-2, Kushina
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹17,000
Yes
18 Nov 2021
12 Feb 2021
18 Feb 2021
12 Feb 2021
17 Feb 2021
12 Feb 2021
Amount
Dismentling of old V.R.B. and proper disposal including all cost of materials, T&P, labours etc.
Earth work in digging foundation in all type of soil with all lead and lift including refilling the trench and proper disposal of excess earth.
Earth work for making Ramp and correction of bank, Diversion and making jeepable service road including all cost of materials, T&P, labours and other accessories required for proper completion of work.
Dry brick on Edge solling including prepration of sub-grade to prescrib Slop, filling joint with mortor, T&P etc.
Dry brick on edge solling including prepration of sub-grade to prescrib Slop, filling joint with mortor, T&P etc but excluding cost of Brick. (Reuse of brick from diversion in approach road)
Laying C.C. 1:3:6 in foundation with cement, coarse sand and stone grit (20mm to 40mm) for base of Box culvert and wing wall including all cost of materials, T&P, labours and other accessories required for proper completion of work.
Centering and shuttering for R.C.C. work including all cost of materials, T&P, labours and other accessories required for proper completion of work.
Bending, binding cutting placing in position rainforcement steel including cost of binding wire and tack wilding with material and other accessories required for proper completion of work.
Laying RCC work in 1:1:2 (M-25) with cement, coarse sand and dalla stone grit (10mm to 20mm) for Slab/base, vertical wall, Wearing coat and parapet including all cost of materials, T&P, labours and other accessories required for proper completion of work.
Ist class brick work in 1:4 cement mortar with coarse sand including all cost of materials, T&P, labours and other accessories required for proper completion of work.
Supply and laying of 18 MM thick joint filler board in construction joint including cost of all material, labour, T&P required for proper completion of work.
Fixing wheel guard stone including cost of all material, labour, T&P etc required for proper completion of work.
Sign board at site for Notice on both side including cost of all material, labour, T&P etc required for proper completion of work.
S. S. TRADERS
RM/S M J K INFRATECH
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .