| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.2 LAccepted-Finance | ₹48.2 L | L1 | Accepted-Finance L4 |
| 2 | L2₹61.4 LRejected-Finance | ₹61.4 L | L2 | Rejected-Finance L2 |
| 3 | L3₹72.5 LRejected-Finance | ₹72.5 L | L3 | Rejected-Finance L3 |
| 4 | L4₹72.6 LRejected-Finance | ₹72.6 L | L4 | Rejected-Finance L4 |
| 5 | L5₹73.6 LRejected-Finance 303 SF SEC OMICRON 1 GR NOIDA G B NAGAR 201310 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201310 | ₹73.6 L | L5 | Rejected-Finance L5 |
Tender Value
₹74.0 L
EMD Value
₹1.5 L
Closing Date
18 Mar 2026, 5:00 pmClosed
GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Construction of Laying Interlocking tiles work, Brick/RCC Drain and Road in Village-Chanchali, YEA WC-06
2026_YEIDA_1122864_6
YEA/GM(PROJECT)/2026/480 DT-27/02/2026
Open Tender
Civil Works
Fixed-rate
180 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,920
₹1.5 L
23 Jun 2026
9 Mar 2026
19 Mar 2026
9 Mar 2026
18 Mar 2026
9 Mar 2026
Earth work in excavation in ordinary in all of foundation tranches including dressing of side and ramming of bottom lifts upto a 1.5m including getting out the excavation soil and disposal of surplus excavated soil as directed with in a lead of 50m . AR
Cement concrete with 4cm Guage Approved Stone ballast , Coarse Sand& Cement in the proportion of 8:4:1 including Supply of all material, Labour, Tools & Plants etc required for Proper completion of the work. UPPWD/SOR/281/P-17
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)UP PWD SOR 2020 /DAR-18/5.1.2
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars.. UP PWD SOR 2020 /DAR-18/5.22.6
Construction of un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30(Grade) coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm,mixed a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needie, screed and plate vibrators and| finished in continuous operation including provision of contraction and construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14 days,using curing compound (where specified) and water finishing to lines and grade as per drawing and finished with Power Trowel Cum Floter-Trimix Flooring Machine.Technical Specification Clause 1501. Including all taxes, material, T&P, Machinary. royalty, labour cess all taxes complete. Excluding GST as per E/l.
Dry brick on edge flooring in required pattern with bricks of class designation150 on a bed of earth including fillingcompressed with M-150Bricks(DAR/11.2/AR/YEIDA/BasedonUPPWD/SOR-2020)
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Morth-401
M-150 brick work in 1:4 cement and Coarse sand of ( 2.20 fineness modulous) mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work . UPPWD/SOR/303+(305)
Providing and laying 60mm thick I.S.I Mark factory made cement concrete interlocking paver block made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of Corse sand, filling the joints with fine sand and etc. all complete as per the direction of engineer in charge . with conforming to IS-15658 and IRC:SP:63. (AR)
concrete with 2cm Guage Stone grit , Coarse Sand& Cement in the proportion of 4:2:1 including Supply of all material, Labour, Tools & Plants etc required for Proper completion of the work. UPPWD/SOR/279a/P-17
12 mm cement plaster of mix : 1:6 (1cement :6 coarse sand) UP PWDSOR-2020/DAR-18/13.4.2
Centering and shuttering including strutting, proppingFoundations, footings, bases of columns, etc. for mass concrete. UP PWD SOR 2020 /DAR-18/5.9.1
Centering and Shuttering including strutting Walls (any thickness) including attached pilasters, butteresses, Plinth and string courses etc. UP PWD SOR-2020/5.9.2
Suspended floors, roofs, landings, balconies and access platform.UP PWD SOR 2020/DAR-18/ 5.9.3
Edges of Slabs and breaks in floors and walls.under 20 cms wide.DAR/5.9.16.1/Based on UPPWD/SOR-2020
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.96 MB
6.pdf
Tender Documents • 1.41 MB
BOQ_2091494.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].