Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical all documents as per eNIT |
| 2 | Accepted-Technical | Accepted-Technical all documents as per eNIT |
| 3 | Rejected-Technical | Rejected-Technical latest GSTR3B, Annexure E not uploaded |
| 4 | Rejected-Technical | Rejected-Technical Tender fee and EMD money pledged wrongly |
| 5 | Rejected-Technical | Rejected-Technical Registration Card not renewed |
Tender Value
₹18.2 L
EMD Value
₹36,320
Closing Date
18 Aug 2026, 4:00 pmClosed
Executive Engineer
Peerbagh Srinagar near ACB Hqrs.
Construction of Chawki Rearing Center (CRC) at Mulberry Farm Zainapora Shopian.
2026_DGPJK_318989_2
e-NIT/EE/PHC/07/2026-27
Open Tender
Civil Works
Percentage
Zainpora Shopian
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Executive Engineer
₹36,320
22 Aug 2026
1 Aug 2026
19 Aug 2026
3 Aug 2026
18 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in all kind of soil for foundation Trenches, lift up to 1.5 mtr including getting out the excavated soil and disposal of surplus excavated soil within a lead of 1 mtr from cutting edge. | 50.09 | Cum | 262.7 | ₹13,158.64 |
| 2 | Providing and laying of stone soling hand packing incld.ramming watering and all carriages upto site of work. | 10.44 | Cum | 850 | ₹8,874 |
| 3 | Providing and laying of cement concrete of sp.grade excld.cost of centring shuttering.All work upto plinth level in 1:4:8 mix.incld. All carriages. | 7.91 | Cum | 5,500 | ₹43,505 |
| 4 | Providing and laying of cement concrete of sp.grade excld.cost of centring shuttering.All work upto plinth level in 1:1.5:3 mix.incld. All carriages. | 5.81 | Cum | 8,100 | ₹47,061 |
| 5 | Providing and laying ofcement concrete of sp.grade excld.cost of centring shuttering.All work upto plinth level in 1:3:6 mix.incld. All carriages | 30.88 | Cum | 6,100 | ₹1,88,368 |
| 6 | Providing and laying of cement concrete of sp.grade excld.cost of centring shuttering.All work above plinth upto floor v level in 1:1.5:3 mix.incld. All carriages. | 3.39 | Cum | 10,100 | ₹34,239 |
| 7 | Reinforcement for RCC work incld.straightening cutting bending binding and placing in position and binding all complete. | 816.23 | Kg | 123.2 | ₹1,00,559.54 |
| 8Centring and shuttering incld.strutting protting etc and removal of form work for: | |||||
| 8.01 | Foundation footings and bases of columns | 22.86 | Sqm | 286.35 | ₹6,545.96 |
| 8.02 | Walls (any thikness) incld.attached pillasters. | 111.43 | Sqm | 628.95 | ₹70,083.9 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
BOQ_1054295.xls
BOQ • 0.33 MB
crcextension.pdf
PDF • 0.69 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .