| 1 | L1₹31.1 LAccepted-AOC MISSION HOSPITAL CHOWK KEDARPUR AMBIKAPUR DIST SURGUJA CG 497001 | SURGUJA | CHHATTISGARH | 497001 | L1 | Accepted-AOC L1 |
Tender Value
₹42.7 L
EMD Value
₹53,400
Closing Date
27 Nov 2023, 11:00 amClosed
SO EM BHATGAON AREA SECL
OFFICE OF THE SO EM BHATGAON AREA SECL
Dismantling of 02 no. 33 kV Over Head line (33 kV Jarhi and 33 kV Kalyani) and 01 no. 3.3 kV OH line from 33 kV Main Substation to Incline No. 1/2 over the proposed depillaring panel AND Diversion (Erection) of the mentioned OH Lines (02 no. 33 kV an
2023_SECL_293131_1
GM/Bhat/EM/e-open tender/2023-24/61 dtd 06.11.2023
Open Tender
Electrical and Maintenance Works
Item Rate
45 days
SECL BHATGAON AREA
As per NIT
9 documents required · 9 mandatory
₹53,400
1 Dec 2023
7 Nov 2023
28 Nov 2023
7 Nov 2023
27 Nov 2023
7 Nov 2023
7 Nov 2023 - 15 Nov 2023
Amount
Item Description/ Heading
Dismantling of OH Line
Dismantling of damaged old support completely
272 kg 9.1 Mtr long PCC Pole - (Single Poles)
Taking out of V Cross Arm, Top Clamp Insulators, 4 Pin Cross Arm,Guarding,LA,Stay, AB Switch and EP and other items etc. de-erection of pole and shifting
Rail Pole/Tubular Poles/H-Beam/RS Joist (175x85mm)
Cutting of pole by gas cutter/dismantling, taking out of V Cross Arm, top clamp insulators, Guarding, LA, Stay, AB Switch and EP and other items etc, shifting and loading in SECL vehicle
Dismantling of Line
Erection Work of New OH Line
33kV Single Pole (Total 33 kV Single Poles - 84)
Survey, Tree Cutting and Approach Clearance
Pit Digging
Transportation of pole from road side to pole pit for a lead of 1 km (pole will be provided by SECL)
Shifting of material (other no than pole) to pole pits
Cross arm fixing complete with top clamp
Pole erection complete
Concreting of poles @0.6 cmt per pole and 0.05 cmt per pole for base pading (1:3:6)(for Rail Pole)
Insulator fixing at each location
Painting and numbering etc including steel support
33kV Triple Pole (Total 33 kV Triple Poles - 12)
Pit Digging
Stay Pit Digging
Transportation of pole from road side to pole pit for a lead of 1 km (pole will be provided by SECL)
Shifting of material (other no than pole) to pole pits
Cross arm fixing complete with top clamp
Pole erection complete
Stay erection complete
Concreting of poles @0.6 cmt per pole and 0.05 cmt per pole for base pading (1:3:6)(for Rail Pole)
Insulator fixing at each location
Painting and numbering etc including steel support
Stringing of line for all 3 phases (Conductors shall be provided by SECL)
33kV Double Pole (Total 33 kV Double Poles - 2)
Pit Digging
Stay Pit Digging
Transportation of pole from road side to pole pit for a lead of 1 km (pole will be provided by SECL)
Shifting of material (other no than pole) to pole pits
Cross arm fixing complete including insulator
Pole erection complete
Stay erection complete
Concreting of poles @0.6 cmt per pole and 0.05 cmt per pole for base pading (1:3:6)(for Rail Pole)
Painting and numbering etc including steel support
3.3kV Single Pole (Total 3.3 kV Single Poles -54)
Survey, Tree Cutting and Approach Clearance
Pit Digging
Shifting of material to pole pits
Transportation of pole from road side to pole pit for a lead of 1 km (pole will be provided by SECL)
Cross arm fixing complete with top clamp
Pole erection complete (including earthing)
Concreting of base pad for poles @0.5 cmt per pole
Insulator fixing at each location
Painting of cross arm and numbering of poles etc.
Stringing of line for all 3 phases (Conductors shall be provided by SECL)
3.3kV Double Pole (Total 3.3 kV Double Pole -05)
Pit Digging
Stay Pit Digging
Shifting of material to pole pits
Transportation of pole from road side to pole pit for a lead of 1 km (pole will be provided by SECL)
Cross arm fixing complete including insulators etc.
Pole erection complete (including earthing)
Concreting of stay @0.3 cmt/stay and poles
Stay erection complete
Painting of cross arm and numbering of poles etc.
3.3kV Triple Pole (Total 3.3 kV Triple Poles -6)
Pit Digging
Stay Pit Digging
Shifting of material to pole pits
Transportation of pole from road side to pole pit for a lead of 1 km (pole will be provided by SECL)
Cross arm fixing complete with top clamp
Pole erection complete (including earthing)
Stay erection complete
Concreting of base pad for poles @0.5 cmt per pole
Insulator fixing at each location
Painting of cross arm and numbering of poles etc.
Running Earth
Providing and fixing 6 SWG dia G.I. wire on surface or in recess for loop earthing as required (Running Earth)
Earthing pit
Earthing with G.I. earth pipe 4.5 metre long, 40 mm dia including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe etc. (with charcoal/ coke and salt ) as required. (Total Over Head Lines = 4)
Material Part for Erection Work of 02 nos. 33 kV OH Lines and 02 nos. 3.3 kV OH Lines
Earthing coil per pole (coil of 115 turns of 50mm dis and 2.5 mtrs lead of 4mm GI Wire)
Barbed Wire @2kg/pole
Back Clamp for Pole
Stay Set 20mm
Stay Wire 7/8 SWG @8.5Kg/stay
Stay Clamp
Stay Insulator
33KV Polymeric Pin Insulator
MS Nut and Bolt 16x160mm
DC Cross Arm 5' center 100x50mm MS Channel
Bracing Set 5' center DP
33KV Polymeric Disc Insulator
MS Nut and Bolt 16x40mm
MS Nut and Bolt 16x200mm
L.T. 3 Pin Cross Arm 50x50x6 mm
11KV Pin Insulator
11 kV Guarding Channel 100x50mm
11KV Disc Insulator
GI Wire 6 SWG (Guarding)
GI Wire 8 SWG (Guarding)
Running Earth
Earthing pit
33KV Lightening Arrester
11 KV Lightening Arrester
Overhead Charges (market fluctuation, contractor's profit on material cost)
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_303616.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .