Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹43.2 LAccepted-AOC GSTIN: 09AOEPR3881G2ZJSAKARA HUSENPUR GHAZIPUR | ₹43.2 L | 1 | Accepted-AOC 1 |
| 2 | 2₹50.9 LRejected-Finance GSTIN: 09AJRPP5758N1ZO | ₹50.9 L | 2 | Rejected-Finance 2 |
| 3 | 3₹51.0 LRejected-Finance UTTAR PRADESH | PILIBHIT | UTTAR PRADESH | 262001 | ₹51.0 L | 3 | Rejected-Finance 3 |
Updated dates
Tender Value
₹73.6 L
EMD Value
₹5.7 L
Closing Date
17 Mar 2026, 12:00 pmClosed
SE BSRO PWD BULANDSHAHR
SE BSRO PWD BULANDSHAHR
New Construction work from Babugarh Baghadpur Road to Police Line -under construction-
2026_CEMRT_1123634_10
2571/96M/E-TENDER/BSRO/2025-26 DT 28.02.2026
Open Tender
Civil Works
180 days
HAUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹5.7 L
Yes
23 May 2026
11 Mar 2026
17 Mar 2026
11 Mar 2026
17 Mar 2026
11 Mar 2026
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 Including cost of all material, labour, T&P,and royalty but excluding cost of GST.
construction of sub grade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads transporting to site spreading grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000m as per technical speciftcation clause 303.1 (with ordinary earth in patri work) Including cost of all material, labour, T&P,and royalty but excluding cost of GST.
(Cement Treated Sub base) providing, laying and spreading in uniform layers with motor grader on a prepared sub grade/Sub base, Cement @ 2% by weight to the spread Material manually,mixing in place with Rotavator and compacting with Road roller at OMC to achieve the desired unconfined compressive strength and form a layer of base. Including cost of all material, labour, T&P,and royalty but excluding cost of GST.
(Cement Treated Base) providing, laying and spreading in uniform layers with motor grader on a preparedSub base, Cement @ 4% by weight to the spread Material manually,mixing in place with Rotavator and compacting with Road roller at OMC to achieve the desired unconfined compressive strength and form a layer of base. Including cost of all material, labour, T&P,and royalty but excluding cost of GST.
Providing and applying tack coat with bitumen VG-10 grade using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. Including cost of all material, labour, T&P,and royalty but excluding cost of GST.
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using grade VG-10 bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades by manual means As per Technical Specification Clause 508. Including cost of all material, labour, T&P,and royalty but excluding cost of GST.
Providing and laying seal coat by manual means with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 Including cost of all material, labour, T&P,and royalty but excluding cost of GST.
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 Including cost of all material, labour, T&P,and royalty but excluding cost of GST.
Providing concrete for plain/reinforced concrete Grade M10 (1:3:6) in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Including cost of all material, labour, T&P,and royalty but excluding cost of GST.
Brick masonry work in cement mortar (1:4) in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 Including cost of all material, labour, T&P,and royalty but excluding cost of GST.
Laying Reinforced cement concrete pipe NP3/prestressed concrete pipe of 350 mm dia for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets. Including cost of all material, labour, T&P,and royalty but excluding cost of GST.
Laying Reinforced cement concrete pipe NP3/prestressed concrete pipe of 600 mm dia for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets. Including cost of all material, labour, T&P,and royalty but excluding cost of GST.
Providing & fixing reinforced cement concrete M15 grade Ordinary Kilometre Stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703. Including cost of all labour, T&P, labour cess and all taxes complete.
Providing & fixing reinforced cement concrete M-15 grade 200 m Stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703. Including cost of all labour, T&P, labour cess and all taxes complete.
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Second Year @0.75%
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Third Year @1.50%
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Fourth Year @2.25%
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Fifth Year @3.0%
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
Tendernotice_2.pdf
PDF • 19.63 MB
BOQ_2093397.xls
BOQ • 1.11 MB
Download all tender documents and submit your bid