Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 CrAccepted-AOC SUARMARI LALMATIA GODDA MAHAGAMA JHARKHAND 814165 | GODDA | GODDA | JHARKHAND | 814165 | L1 | Accepted-AOC Eligible L1 bidder. | |
| 2 | L2₹3.6 Cr+₹9.4 L (2.71%)Rejected-Finance MAHAGAMA PO MAHAGAMA GODDA JHARKHAND 814154 | MAHAGAMA | GODDA | JHARKHAND | 814154 | L2 | Rejected-Finance As per TC Recommendation. | |
| 3 | L3₹3.6 Cr+₹11.3 L (3.24%)Rejected-Finance | L3 | Rejected-Finance As per TC Recommendation. | |
| 4 | L4₹3.6 Cr+₹14.8 L (4.25%)Rejected-Finance | L4 | Rejected-Finance As per TC Recommendation. |
Tender Value
₹4.8 Cr
EMD Value
₹5.9 L
Closing Date
16 Feb 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GM(Civil)/HOD, ECL HQ
Civil Engineering Department, Office of the Chairman-cum-Managing Director Sanctoria, P.O. Dishergarh, Dist. Burdwan, West Bengal-713333
Construction of an RCC Security Wall at the Coal Handling Plant (CHP) around Project 3.0 MTPA at Hurra-C OCP, Rajmahal Area.
2026_ECL_351694_1
ECL/HQ/GM(C)/e-Tender/25-26/26 date 22.01.2026
Open Tender
Civil Works - Others
Percentage
150 days
Rajmahal Area, ECL.
Please refer Tender documents.
5 documents required · 5 mandatory
₹5.9 L
23 Sept 2026
29 Jan 2026
17 Feb 2026
29 Jan 2026
16 Feb 2026
30 Jan 2026
29 Jan 2026 - 9 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil Work | |||||
| 1.01 | Earthwork in excavation bymechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 1,637.64 | cum | 188.75 | ₹3,09,104.55 |
| 1.02 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 128.51 | cum | 1,061.6 | ₹1,36,426.22 |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 128.51 | cum | 5,434.55 | ₹6,98,394.02 |
| 1.04 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 899.53 | cum | 6,903.9 | ₹62,10,265.17 |
| 1.05 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fllets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 962.13 | cum | 8,030.65 | ₹77,26,529.28 |
| 1.06 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. | 3,189.31 | sqm | 269.3 | ₹8,58,881.18 |
| 1.07 | Centering and shuttering including strutting, propping etc. and removal of form for Walls any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 10,319.2 | sqm | 562.9 | ₹58,08,677.68 |
| 1.08 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 80,957.7 | kg | 95.75 | ₹77,51,699.77 |
| 1.09 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 86,591.7 | kg | 95.75 | ₹82,91,155.27 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.20 MB
Tendernotice_2.pdf
PDF • 0.65 MB
BOQ_364459.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .