| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.5 CrAdmitted-Finance | -26.87% | ₹3.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.6 CrAdmitted-Finance MAHAGAMA PO MAHAGAMA GODDA JHARKHAND 814154 | MAHAGAMA | GODDA | JHARKHAND | 814154 | -24.89% | ₹3.6 Cr | L2 | Admitted-Finance |
| 3 | L3₹3.6 CrAdmitted-Finance | -24.50% | ₹3.6 Cr | L3 | Admitted-Finance |
| 4 | L4₹3.6 CrAdmitted-Finance | -23.76% | ₹3.6 Cr | L4 | Admitted-Finance |
Tender Value
₹4.8 Cr
EMD Value
₹5.9 L
Closing Date
16 Feb 2026, 5:00 pmClosed
GM(Civil)/HOD, ECL HQ
Civil Engineering Department, Office of the Chairman-cum-Managing Director Sanctoria, P.O. Dishergarh, Dist. Burdwan, West Bengal-713333
Construction of an RCC Security Wall at the Coal Handling Plant (CHP) around Project 3.0 MTPA at Hurra-C OCP, Rajmahal Area.
2026_ECL_351694_1
ECL/HQ/GM(C)/e-Tender/25-26/26 date 22.01.2026
Open Tender
Civil Works - Others
150 days
Rajmahal Area, ECL.
Please refer Tender documents.
5 documents required · 5 mandatory
₹5.9 L
1 Jun 2026
29 Jan 2026
17 Feb 2026
29 Jan 2026
16 Feb 2026
30 Jan 2026
29 Jan 2026 - 9 Feb 2026
Civil Work
Earthwork in excavation bymechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fllets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete.
Centering and shuttering including strutting, propping etc. and removal of form for Walls any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Finishing walls with water proofing cement paint of required shade : New work (Two or more coats applied @ 3.84 kg/10 sqm)
Providing and fixing 1 mm thick M.S. sheet sliding-shutters, with frame and diagonal braces of 40x40x6 mm angle iron, 3 mm M.S. gusset plates at the junctions and corners, 25 mm dia pulley, 40x40x6 mm angle and T- iron guide at the top and bottom respectively, including applying a priming coat of approved steel primer
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Providing and fixing concertina coil fencing with punched tapeconcertina coil 600 mm dia 10 metre openable length ( total length90 m), having 50 nos rounds per 6 metre length, upto 3 m height ofwall with existing angle iron 'Y' shaped placed 2.4m or 3.00 m apartand with 9 horizontal R.B.T. reinforced barbed wire, stud tied withG.I. staples and G.I. clips to retain horizontal, including necessarybolts or G.I. barbed wire tied to angle iron, all complete as per directionof Engineer-in-charge, with reinforced barbed tape(R.B.T.) / Springcore (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mmwith tape (0.52 mm thick) and weight 43.478 gm/ metre (cost ofM.S. angle, C.C. blocks shall be paid separately)
Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts
Filling available excavated earth (excluding rock) in trenches, plinth. sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50m and for all lift
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.20 MB
Tendernotice_2.pdf
PDF • 0.65 MB
BOQ_364459.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid