| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | -16.99% | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹8.7 L (7.10%)Admitted-Finance | -11.10% | ₹1.3 Cr+₹8.7 L (7.10%) | L2 | Admitted-Finance |
| 3 | L3₹1.3 Cr+₹10.4 L (8.43%)Admitted-Finance | -9.99% | ₹1.3 Cr+₹10.4 L (8.43%) | L3 | Admitted-Finance |
| 4 | L4₹1.5 Cr+₹25.2 L (20.5%)Admitted-Finance AT PO PANCHUPALLI DIST KEONJHAR PIN 758020 | PANCHUPALLI | KEONJHAR | ODISHA | 758020 | +0.00% | ₹1.5 Cr+₹25.2 L (20.5%) | L4 | Admitted-Finance |
| 5 | L4₹1.5 Cr+₹25.2 L (20.5%)Admitted-Finance AT CHULIA BANGURA ORAF KUSIA BAUNSAPAL PO KAMAKHYANAGAR DISTRICT DHENKANAL | +0.00% | ₹1.5 Cr+₹25.2 L (20.5%) | L4 | Admitted-Finance |
Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
10 Mar 2026, 5:00 pmClosed
Chief Construction Engineer,RWC,Angul
Angul
Construction of Rural Work Division office Building ,Angul for the year 2025-26-Building
2026_CERWI_126773_1
Online-ANG-37/2025-26
National Competitive Bid
Civil Works - Buildings
Percentage
450 days
Angul
2 documents required · 2 mandatory
₹10,000
₹1.5 L
Yes
26 Apr 2026
28 Feb 2026
11 Mar 2026
28 Feb 2026
10 Mar 2026
28 Feb 2026
28 Feb 2026 - 9 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORKS
Earthwork in excavation of foundation in hard soil with all leads and lifts including dressing the sides and levelling the bed of the foundation including cost of all labour required for the work etc. complete with all other T &P required for the work and stacking the excavated materials away from the working area as directed by the Engineer-in-Charge including 1% Cess. | 357.9 | cum | 276.9 | ₹99,102.51 |
| 2 | Supplying and filling foundation and plinth with sand well watered & rammed with cost, conveyance, royalty and taxes of all materials labour required for the work as per specification and direction of the Engineer-in-Charge including royalty of materials including 1% Cess. | 279.17 | cum | 911.8 | ₹2,54,547.21 |
| 3 | Providing and laying P.C.C (1:3:6) with 40 mm size Hand broken hard granite metal of approved quality from approved quarry including hoisting lowering & laying concrete in layers not exceeding 9" thick to the required level including cost,conveyance & royalty of all materials with all taxes & compacting watering curing & all labour with T & P articles required for the work including 1% cess etc, complete as per specification and direction of the Engineer-in-charge. | 123.99 | cum | 5,803.19 | ₹7,19,537.53 |
| 4 | R.C.C. M-25 grade having a minimum compressive strength ( in work test ) 250 kg/ sq. cm in 15 cm cubes at 28 days after mixing and tests conducted in accordance with I.S 456 and I.S 516 using 20 mm and down graded size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering , laying and compacting concrete , watering and curing for 28 days, centring, shuttering , finishing the exposed surface including ceiling smooth, providing grooves , beads where necessary and providing required no of fan hooks as directed including cost, conveyance, royalities and taxes of all the materials and cost of all labour, T&P required for the work etc. complete in all respect including 1% cess as per direction of the Engineer in charge but excluding the cost of M.S rods or Tor steel and binding wire and labour charges for bending, binding and tying the grills as per specification and direction of the Engineer-in-charge.a) Column Base | 47.31 | cum | 6,245.4 | ₹2,95,469.87 |
| 5 | b) Column & Beam Ground Floor | 14.02 | cum | 15,508.3 | ₹2,17,426.37 |
| 6 | b) Column & Beam First Floor | 8.78 | cum | 19,192.1 | ₹1,68,506.64 |
| 7 | b) Column & Beam Second Floor | 3.04 | cum | 23,261.3 | ₹70,714.35 |
| 8 | d) Plinth Band | 19.29 | cum | 11,894.8 | ₹2,29,450.69 |
| 9 | e) Lintel Band
Ground Floor | 7.5 | cum | 13,908.7 | ₹1,04,315.25 |
| 10 | First Floor | 7.5 | cum | 17,272.6 | ₹1,29,544.5 |
stage.html
html • 0.10 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.17 MB
Tendernotice_1.pdf
PDF • 0.78 MB
BOQ_583585.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .