Tender Value
₹41.2 Cr
EMD Value
₹22.1 L
Closing Date
10 Mar 2026, 3:00 pmClosed
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
Above/Below/Par
WORKS
13 conditions · 2 needing a document upload
Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Technical Eligibility Criteria: As regards similar work, tenderer should have executed erection, testing, commissioning of any one of the following types of works. Similar nature work means:- "Execution of any work of overhead Transmission lines/HT switch yard of 66 KV or above voltage in any Central Government department/ State Government department /Central Government PSU's/ State Government PSU's" . The tenderer must have successfully completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: -Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or -Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or -One similar work each costing not less than the amount equal to 60% of advertised value of the tender. in Central / Sate Govt / Semi-Govt Organizations / Authorities, PSUs, Govt of India undertakings shall only be considered to qualify above eligibility criteria. Necessary Certificate to be submitted along with offer. Note for item 10.1 of GCC 2022 shall be applicable. Tenderers may carefully note that their Contract Agreement for this work is liable to be terminated at any time later, in case any of the information furnished by them is found to be untrue or any adverse point comes to light subsequently. The decision of Railway in this regard shall be final and binding Note:The Joint Venture (JV) will be applicable for this tender as JV is only applicable for tender cost more than 10 crores as per Railway Board's letter No. 2002/CE-I/CT/37/JV Pt.VIII dated 14.12.2012.
6 conditions · 4 needing a document upload
Affidavit as per attached format Annexure-V.
ANNEXURE.V(A)
Power of Attorney.
Tender Form (First Sheet)
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
For Crop Land & Tree Compensation - See clause 1.2.60 point 4 of Conditions of Contract. (Page 98 of tender booklet)
Shifting and Diversion of various existing EHV transmission tower lines of 132 kV and 220 kV in connection with Solapur-Osmanabad section under Parli MSETCL Circle of Ch. Sambhajinagar Zone and Solapur MSETCL circle of Pune Zone and 220 kV in connection with Baramati-Phaltan section Solapur MSETCL circle of Pune Zone
PA-LD-C-T-2025-17
PA-LD-C-T-2025-17
Open
Works - General
12 Months
Solapur, Maharashtra
₹0
₹22.1 L
10 Mar 2026
16 Feb 2026
24 Feb 2026
295 items across 6 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 4,84,35,135.79 | ||
| — | 299.42 | — | — | ||
| Fabrication, Galvanising, Supply at site store of towers (Viz, 2°, 15°, 30°, 60°) normal, its extensions with set of stubs, Superstructure, templates, step bolts, U-bolts, D'Shackles, Chain links etc,complete as per approved design & drawings. | — | — | — | 3,23,32,245.91 | |
| — | 13.00 | — | — | ||
| Supply at site store of Galvanised Bolts & Nuts with Spring Washers. | — | — | — | 24,68,399.83 | |
| — | 18.00 | — | — | ||
| Supply of Tower accessories-Danger Board | — | — | — | 6,191.28 | |
| — | 18.00 | — | — | ||
| Supply of Tower accessories-Number Plate | — | — | — | 5,153.04 | |
| — | 30.00 | — | — | ||
| Supply of Tower accessories-Phase plates (set of RYB) | — | — | — | 13,758 | |
| — | 18.00 | — | — | ||
| Supply of Tower accessories-Circuit Plate(set of C1 & C2) | — | — | — | 8,555.22 | |
| — | 18.00 | — | — | ||
| Supply of Tower accessories-Anti-climbing devices with Barbed wire. | — | — | — | 1,01,257.56 | |
| — | 10.00 | — | — | ||
| Supply of Tower accessories-Bird Guards | — | — | — | 7,753.5 | |
| — | 467.00 | — | — | ||
| Disc Insulators (Normal) - 70 KN | — | — | — | 4,79,282.1 | |
| — | 1860.00 | — | — | ||
| Disc Insulators (Normal)- 120KN | — | — | — | 22,62,206.4 | |
| — | 42.00 | — | — | ||
| Hardwares suitable for 0.2 ACSR Conductor -STN/STA | — | — | — | 1,85,499.72 | |
| — | 156.00 | — | — | ||
| Hardwares suitable for 0.2 ACSR Conductor-DTN/DTA | — | — | — | 15,37,429.92 | |
| — | 36.60 | — | — | ||
| Supply of Conductor - 0.2 Conductor including 2% extra for sag, jumpering and wastage | — | — | — | 81,57,684.33 | |
| — | 50.00 | — | — | ||
| Accessories for 0.2 ACSR conductor-Mid Span Joints | — | — | — | 54,514.5 | |
| — | 38.00 | — | — | ||
| Accessories for 0.2 ACSR conductor-Repair Sleeves | — | — | — | 14,074.06 | |
| — | 150.00 | — | — | ||
| Accessories for 0.2 ACSR conductor-Vibration dampers. | — | — | — | 1,35,469.5 | |
| — | 12.00 | — | — | ||
| Accessories for 0.2 ACSR conductor-P.A.RODS | — | — | — | 19,167.72 | |
| — | 9.19 | — | — | ||
| Supply of Earth Wire-G.I. Earthwire 7/3.15 mm | — | — | — | 5,78,229.38 | |
| — | 36.00 | — | — | ||
| Accessories for G.I. Earthwire 7/3.15 mm-Tension Clamps | — | — | — | 34,686.36 | |
| — | 6.00 | — | — | ||
| — | 34.00 | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
AnnexureVA.pdf
ATTACHMENT
AnnexureV.pdf
ATTACHMENT
AnnexureVIB.pdf
ATTACHMENT
GCC April 2022CorrectionSlipNo1to10
ATTACHMENT
LetterofCredit.pdf
ATTACHMENT
ShramikkalyanPortal.pdf
ATTACHMENT
TenderBooklet2025_17_1.pdf
ATTACHMENT
TenderFormFirstSheet.pdf
ATTACHMENT
GCCApril2022.pdf
ATTACHMENT
GCCApril2022CorrectionSlipNo.1-10.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].