Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-AOC | ₹2.4 L | L1 | Accepted-AOC Lowest bidder |
| 2 | L2₹2.9 L+₹45,244.20 (18.7%)Rejected-Finance | ₹2.9 L+₹45,244.20 (18.7%) | L2 | Rejected-Finance Not the Lowest bidder |
| 3 | L3₹2.9 L+₹45,285.90 (18.7%)Rejected-Finance AT PUNDILO LANKAPADA PATKURA KENDRAPARA PIN 754134 | CUTTACK | ODISHA | 754134 | ₹2.9 L+₹45,285.90 (18.7%) | L3 | Rejected-Finance Not the Lowest bidder |
| 4 | L4₹3.0 L+₹57,795.82 (23.8%)Rejected-Finance AT AT PO BASANDARA P S BIRIDI DIST JAGATSINGHPUR ODISHA | BHADRAK | ODISHA | 755007 | ₹3.0 L+₹57,795.82 (23.8%) | L4 | Rejected-Finance Not the Lowest bidder |
| 5 | L5₹3.3 L+₹82,773.95 (34.1%)Rejected-Finance | ₹3.3 L+₹82,773.95 (34.1%) | L5 | Rejected-Finance Not the Lowest bidder |
Tender Value
₹4.2 L
EMD Value
₹4,170
Closing Date
8 Jun 2026, 5:00 pmClosed
Superintending Engineer, Mahanadi Barrage Division
Superintending Engineer, Mahanadi Barrage Division,Gandarpur, Cuttack 753003
Bed Clearance of PRD from RD 00 Mtr. to 5000 Mtr. for the year 2026-27 (MBD36/2026-27)
2026_CELBB_130144_1
e Procurement Notice No. 05/2026-27
Open Tender
Civil Works - Canal
Percentage
10 days
Cuttack
Please refer Tender documents
2 documents required · 2 mandatory
₹2,000
₹4,170
Yes
17 Aug 2026
30 May 2026
9 Jun 2026
30 May 2026
8 Jun 2026
30 May 2026
30 May 2026 - 8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing of grass and removal of rubbish upto a distance of 50 mtrs. outside the periphery of the area including labour charges and cess but excluding GST etc. complete as per direction of the Engineer-in-charge. | - | Sqm | 2.9 | - |
| - | Earth work in all kinds of soil in canal bed cutting with all lead, lift and delift including dressing and levelling the bed and depositing the excavated soil away from the bed of canal including labour, T&P and cess but excluding GST etc. complete as per direction of the Engineer-in-charge. | - | Cum | 175.4 | - |
| - | Puddle filling of good clay with initial lead, lift and delifts including cost, labour and cess but excluding GST etc. complete as per direction of the Engineer-in-charge. | - | Cum | 509.9 | - |
| - | Earth work in excavation of foundation of structure in all kinds of soil with all leads, lifts and delifts including dressing and levelling the bed and deposited the excavated soil awary from the work site including royalty, labour and cess but excluding GST etc. complete as per direction of the Engineer-in-charge. | - | Cum | 210.5 | - |
| - | Filling foundation and plinth with sand well watered and rammed with all leads, lifts and delifts including cost, carriage, royalty with DMF, EMF and Addl. charge of materials, labour charges and cess but excluding GST etc. complete as per the direction of Engineer-in-Charge. | 1 | Cum | 649.6 | ₹648.95 |
| - | Cement concrete (1:2:4) with 20mm size down graded HGCB chips including cost, carriage, royalty with DMF, EMF and Addl. charge of materials, labour charges, curing and cess, hire & running charges of machinaries but excluding GST etc. complete as per the direction of the Engineer-in-Charge. | - | Cum | 8,774.4 | - |
| - | Rigid and smooth centering and shuttering for RCC foundation, plinth band and footing base of columns mass concrete precast slab work and dismantling them after required period of casting with cost, labour, T&P and cess but excluding GST etc. complete as per direction of the Engineer-in-charge. | 1 | Sqm | 250.9 | ₹250.65 |
| - | Filling in foundation & plinth with excavated materials including watering and ramming with all leads, lifts and delifts including labour charges and cess but excluding GST etc. complete as per the direction of Engineer-in-Charge. | 1 | Cum | 140.3 | ₹140.16 |
| - | Providing, laying and fixing in position of RCC Spun pipe with collar jointed with cement mortar (1:3) with cost of materials, labour charges and cess but excluding GST etc. complete as per the direction of Engineer-in-Charge. | - | Rmt. | 869 | - |
stage.html
html • 0.07 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
bid36.pdf
Tender Documents • 14.90 MB
BOQ_593267.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .