Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance KHOITADIH PROJECT BILPAHARI BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.1 Cr+₹2.9 L (2.77%)Admitted-Finance PANDANESWAR BARDHAMAN BARDHAMAN 713346 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713346 | ₹1.1 Cr+₹2.9 L (2.77%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SWAPAN KUMAR AKHULI L2 | BABLU SINHA L1 |
|---|---|---|---|---|---|
| 1.00Item Description/ Heading | |||||
| 2.00 | (1)Transportation & installation of complete 1200 mm dual drive with gear motor& base frame 21.0MT + discharge unit 2.75 MT + loop take up with tenssion trolley drum 3.6MT + fixed unit with drum 1MT +load table 01 nos =1MT +tailend 1MT +1200 mm wide conveyor structure with top bottom roller & foot stool 830 mtr 80kg /mtr =66.4MT + starter 1.5 MT + tail end (24 times ) shifting =24MT+ load table shifting 24 times =24MT Total weight =146.25 MT (2)Transportation & installation of complete 1200 mm dual drive with gear motor& base frame 21.0MT + discharge unit 2.75 MT + loop take up with tenssion trolley drum 3.6MT + fixed unit with drum 1MT +load table 01 nos =1MT +tailend 1MT +1200 mm wide conveyor structure with top bottom roller & foot stool 360 mtr 80kg /mtr =28.8MT + starter 1.5 MT + tail end (8 times ) shifting =8MT+ load table shifting 8 times =8MT total weight =76.65 MT, All Total Weight=222.90 | 222.9 | MT | 27,148 ₹60,51,289.2 | 26,421.71 ₹58,89,399.16 Lowest |
| 3.00 | Making of tailend & discharge skapper for 2 nos belt | 4 | Nos | 1,252 ₹5,008 | 1,218.32 ₹4,873.28 Lowest |
| 4.00 | Fitting of tail end and skapper for 2 nos belt | 4 | Nos | 1,252 ₹5,008 | 1,218.32 ₹4,873.28 Lowest |
| 5.00 | Making of Load Table 04 nos for 2nos of belt | 4 | Nos | 28,905 ₹1,15,620 | 28,131 ₹1,12,524 Lowest |
| 6.00 | Making of discharge unit-2nos of belt | 2 | Nos | 90,375 ₹1,80,750 | 87,956 ₹1,75,912 Lowest |
| 7.00 | Making of Loop take up structure along with fixed unit as per site condition | 1 | Nos | 1,30,515 ₹1,30,515 | 1,27,022 ₹1,27,022 Lowest |
| 8.00 | Making of Tailend | 1 | Nos | 29,778 ₹29,778 | 28,981 ₹28,981 Lowest |
| 9.00 | Making of new base frame for dual drive unit consists of 2 nos motor 2nos gear 2nos drum at surface workshop with proper alignment | 1 | Nos | 2,19,711 ₹2,19,711 | 2,13,831 ₹2,13,831 Lowest |
| 10.00 | Belt laying including transportation of belt jointing tenssioning trail run etc for 2nos belt | 2,400 | Mtr | 605 ₹14,52,000 | 588.45 ₹14,12,280 Lowest |
Tender Value
₹1.1 Cr
EMD Value
₹1.3 L
Closing Date
21 Feb 2023, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Installation and commissioning of 1) 1200mm width x 830 Mtrs. Length Belt conveyor (from 29L and 2WD to 29L and 25ED), 2)1200mm width x 360 Mtrs. Length Belt Conveyor (from 25D and 29L to 25D and 39L)
2023_ECL_269898_1
ECL/GM/BA/E TENDER/22-23/Enm/120 Dt. 03.02.2023
Open Tender
Electrical and Maintenance Works
Item Rate
120 days
Shyamsundarpur Colliery
Please refer to NIT document
6 documents required · 6 mandatory
₹1.3 L
27 Feb 2023
3 Feb 2023
22 Feb 2023
3 Feb 2023
21 Feb 2023
3 Feb 2023
3 Feb 2023 - 7 Feb 2023
Amount
Item Description/ Heading
(1)Transportation & installation of complete 1200 mm dual drive with gear motor& base frame 21.0MT + discharge unit 2.75 MT + loop take up with tenssion trolley drum 3.6MT + fixed unit with drum 1MT +load table 01 nos =1MT +tailend 1MT +1200 mm wide conveyor structure with top bottom roller & foot stool 830 mtr 80kg /mtr =66.4MT + starter 1.5 MT + tail end (24 times ) shifting =24MT+ load table shifting 24 times =24MT Total weight =146.25 MT (2)Transportation & installation of complete 1200 mm dual drive with gear motor& base frame 21.0MT + discharge unit 2.75 MT + loop take up with tenssion trolley drum 3.6MT + fixed unit with drum 1MT +load table 01 nos =1MT +tailend 1MT +1200 mm wide conveyor structure with top bottom roller & foot stool 360 mtr 80kg /mtr =28.8MT + starter 1.5 MT + tail end (8 times ) shifting =8MT+ load table shifting 8 times =8MT total weight =76.65 MT, All Total Weight=222.90
Making of tailend & discharge skapper for 2 nos belt
Fitting of tail end and skapper for 2 nos belt
Making of Load Table 04 nos for 2nos of belt
Making of discharge unit-2nos of belt
Making of Loop take up structure along with fixed unit as per site condition
Making of Tailend
Making of new base frame for dual drive unit consists of 2 nos motor 2nos gear 2nos drum at surface workshop with proper alignment
Belt laying including transportation of belt jointing tenssioning trail run etc for 2nos belt
Providing bolts and nut for fitting of above structure , load table discharge & bend pulley loop take up for 2nos belt
Foundation bolting for drive unit ,discharge unit, loop take with fixed unit for 2nos belt-452
Making vertical support from roof and floor for hanging the conveyor structure from drive head to discharge by welding gas cutting etc considering cost of consumbles for 2nos belt
Cost of fastner 35 pkts
Cleaning coal and unused materials & laveling the floor before installation of drive unit base discharge unit base loop take up tail end for 2nos belt
Fencing of drive & tail end etc for 2nos belt
Drive base frame, discharge base & loop take up cement concrete for 2nos belt
Total impact of GST for the purpose of CTC
SWAPAN KUMAR AKHULI
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.38 MB
BOQ_279240.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .