Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
21 Jun 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE Pochampally
The Executive Engineer Operation and Maintenance Pochampally
Work contract for Erection of link line for the proposed 11 KV Samalpatty feeder and 11 KV Pasanthy feeder from kunnathur 33 KV SS
2023_EB_324518_1
Popy/15/DT.08.06.23/Pasanthy11 KV
Open Tender
Electrical Works
Works
180 days
Pochampally
Should be TNEB Registered Contractor
2 documents required · 2 mandatory
₹0
₹5,000
Yes
26 Jun 2023
8 Jun 2023
22 Jun 2023
8 Jun 2023
21 Jun 2023
8 Jun 2023
8 Jun 2023 - 21 Jun 2023
Amount
Excavation of Pole Pit for above 8.00 m length using JCB/Manual.
Excavation of Stay Pit of 4.5' to 5 ' depth using JCB/Manual
Erection of RCC,REC,PSC Poles above 8.00 m length using JCB/Manual
Fixing of LT Pin Insulator
Fixing of V X arm 3.5 Feet/4.5 Feet/5 Feet
Fixing of HT/LT TI Fitting
Erection of Stay set complete with fixing of stay wire , eye , bow Guy shackle binding etc.,
Fixing of two Tapping X arm per cut Point upto 33 KV line including fixing of Disc,Insulators and Jumpering etc
Paving and String of Conductors of 1 run upto 7/4.09 mm ACSR OR other equivalent Conductor
Dismandling of RCC,REC, PSC and Metal poles of all sizes including the closing of the pit
Loading and unloading Charges of All REC,RCC Pole above 8.00 m length
Transporting of all types and sizes of poles and other associated materials from road side to pole pit and vice versa up to 0.50KM
Transporting of Conductors of all Size from road side to pit location upto one KM of conductor
GST. @18 % For labour
EPF. @13 % should be Entered by the Bidder
ESI. @3.25% should be Entered by the Bidder
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .