Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-Finance BANDHGORA P O BOLPUR DIST BIRBHUM | BOLPUR | BIRBHUM | WEST BENGAL | 731204 | L1 | Accepted-Finance L1 | |
| 2 | L2₹5.0 L+₹25 (<0.01%)Rejected-Finance 131 NILMONI BHATTACHARJEE LANE KADAL BERHAMPORE MURSHIDABAD W B PIN 742102 | BERHAMPORE | MURSHIDABAD | WEST BENGAL | 742102 | L2 | Rejected-Finance L2 | |
| 3 | L3₹5.0 L+₹50 (0.01%)Rejected-Finance WEST BENGAL | MEDINIPUR EAST | WEST BENGAL | 721130 | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | SANJIB GHOSH L2 | ARIJIT GHOSH L1 | SOUMEN KUMAR DAS L3 |
|---|---|---|---|---|---|---|
| 1.00 | 1. System Overview
• System Type: Air-cooled, direct expansion (DX) VRF Heat Pump system (or Heat Recovery for simultaneous heating/cooling).
• Refrigerant: R-410A (Environmentally friendly).
• Capacity Modulation: 10% to 100% capacity control via inverter-driven scroll compressors.
• Operating Ambient: Capable of operating between -5°C to 48°C (cooling/heating).
2. Outdoor Units (Condensing Units)
• Compressor: 100% DC Inverter Scroll Compressors, factory-assembled, weatherproof casing (heavy gauge steel).
• Performance: Minimum COP of 3.5 at 100% load.
• Features: Automatic oil balancing, liquid injection for high ambient cooling, oil separators for each compressor.
• Mounting: Vibration isolators (rubber/spring type), MS base frame/pedestal on roof/ground.
• Electrical: Weatherproof MCB/MCCB enclosure, 3-phase power, 4-pole isolator near units.
3. Indoor Units (Fan Coil Units)
• Types: High wall mounted, 4-way Cassette, Concealed Ductable (High/Low Static), Floor Standing.
• Component: Factory-fitted electronic expansion valve (EEV).
• Features: Inbuilt drain pump (for cassettes), anti-microbial filters.
• Control: Wireless/Wired LCD remote controller, ability to set individual zone temperature.
• Fixing: Threaded rods, clamps, and support framework for ceiling suspension.
4. Refrigerant Piping System (Copper)
• Material: Seamless copper pipes, ASTM B280, Type 'L' or 'K'.
• Insulation: 19 mm (or 25mm for high ambient) thick Nitrile Rubber Insulation (closed cell) on both suction and liquid lines.
• Joints/Fittings: Factory-manufactured branch joints (Y-joints or Refnet joints).
• Fixing: MS hangers, clamps, and supports for piping.
• Installation: Brazing with nitrogen purging to prevent oxidation.
5. Drain Piping
• Material: Rigid UPVC Pipes (IS: 4985 - Class I).
• Insulation: 9 mm thick closed cell nitrile rubber insulation.
• Fixing: Supported with proper slope (>1%) to avoid water stagnation.
6. Control and Communication Wiring
• Cable Type: 2-core x 1.5 sqmm shielded twisted pair copper cable for transmission.
• Conduit: PVC conduit (25mm dia) for all control cabling (surface/recessed).
• Isolation: Separate routing for power and communication cables to avoid interference.
7. Electrical Power & Controls
• Power Cable: XLPE insulated aluminium armored cable (suitable sizes, e.g., 4C x 10 sqmm).
• Safety: Earthing with 6 SWG GI wire.
• Central Control: Centralized intelligent touch-screen controller for managing multiple indoor units.
8. Installation, Testing & Commissioning
• Pressure Testing: Nitrogen leak test at 550 PSIG for 24 hours.
• Vacuumization: Deep vacuum to 500 microns.
• Charging: Top-up refrigerant R-410A based on calculated pipe length.
• Testing: 14-day performance/reliability run test.
9. Estimation Considerations (Fittings & Fixing Materials)
• Refrigerant Joints: Y-joints (Refnets) for branch piping.
• Piping Support: Hangers, U-clamps, and threaded rods.
• Insulation Tape: Nitrile rubber tape for joints.
• Finishing: White cement or sealant for wall openings.
• Cable Trays: GI perforated cable trays for exposed wiring/piping.
Note: All materials should comply with BIS standards and Manufacturer's guidelines. Rate inclusives GST and labour cess. | 1 | Each | 4,95,025 ₹4,95,025 | 4,95,000 ₹4,95,000 Lowest | 4,95,050 ₹4,95,050 |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
7 Apr 2026, 6:00 pmClosed
Chairman Bolpur Municipality
Bolpur Municipality
VRVAC systems for Bolpur Munucipality Utsarga Auditorium (West Side) under Bolpur Municipality.(Rate shall be quoted as per drawing and design ) (including all Taxes And GST)
2026_MAD_1022330_4
NIQ-08/2025-26 memo no-4735/PWD/BM/2025-26 Date-13.03.2026
Open Tender
ELECTRICAL WORKS ORG
Item Rate
30 days
Chairman Bolpur Municipality
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,000
3 Jun 2026
13 Mar 2026
9 Apr 2026
13 Mar 2026
7 Apr 2026
14 Mar 2026
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: Chairman, Bolpur Municipality
Name of Work:VRVAC systems for Bolpur Munucipality Utsarga Auditorium (West Side) under Bolpur Municipality.(Rate shall be quoted as per drawing & design ) (including all Taxes And GST)
Contract No: NIQ-08/2025-26
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
1 1. System Overview • System Type: Air-cooled, direct expansion (DX) VRF Heat Pump system (or Heat Recovery for simultaneous heating/cooling). • Refrigerant: R-410A (Environmentally friendly). • Capacity Modulation: 10% to 100% capacity control via inverter-driven scroll compressors. • Operating Ambient: Capable of operating between -5°C to 48°C (cooling/heating). 2. Outdoor Units (Condensing Units) • Compressor: 100% DC Inverter Scroll Compressors, factory-assembled, weatherproof casing (heavy gauge steel). • Performance: Minimum COP of 3.5 at 100% load. • Features: Automatic oil balancing, liquid injection for high ambient cooling, oil separators for each compressor. • Mounting: Vibration isolators (rubber/spring type), MS base frame/pedestal on roof/ground. • Electrical: Weatherproof MCB/MCCB enclosure, 3-phase power, 4-pole isolator near units. 3. Indoor Units (Fan Coil Units) • Types: High wall mounted, 4-way Cassette, Concealed Ductable (High/Low Static), Floor Standing. • Component: Factory-fitted electronic expansion valve (EEV). • Features: Inbuilt drain pump (for cassettes), anti-microbial filters. • Control: Wireless/Wired LCD remote controller, ability to set individual zone temperature. • Fixing: Threaded rods, clamps, and support framework for ceiling suspension. 4. Refrigerant Piping System (Copper) • Material: Seamless copper pipes, ASTM B280, Type 'L' or 'K'. • Insulation: 19 mm (or 25mm for high ambient) thick Nitrile Rubber Insulation (closed cell) on both suction and liquid lines. • Joints/Fittings: Factory-manufactured branch joints (Y-joints or Refnet joints). • Fixing: MS hangers, clamps, and supports for piping. • Installation: Brazing with nitrogen purging to prevent oxidation. 5. Drain Piping • Material: Rigid UPVC Pipes (IS: 4985 - Class I). • Insulation: 9 mm thick closed cell nitrile rubber insulation. • Fixing: Supported with proper slope (>1%) to avoid water stagnation. 6. Control and Communication Wiring • Cable Type: 2-core x 1.5 sqmm shielded twisted pair copper cable for transmission. • Conduit: PVC conduit (25mm dia) for all control cabling (surface/recessed). • Isolation: Separate routing for power and communication cables to avoid interference. 7. Electrical Power & Controls • Power Cable: XLPE insulated aluminium armored cable (suitable sizes, e.g., 4C x 10 sqmm). • Safety: Earthing with 6 SWG GI wire. • Central Control: Centralized intelligent touch-screen controller for managing multiple indoor units. 8. Installation, Testing & Commissioning • Pressure Testing: Nitrogen leak test at 550 PSIG for 24 hours. • Vacuumization: Deep vacuum to 500 microns. • Charging: Top-up refrigerant R-410A based on calculated pipe length. • Testing: 14-day performance/reliability run test. 9. Estimation Considerations (Fittings & Fixing Materials) • Refrigerant Joints: Y-joints (Refnets) for branch piping. • Piping Support: Hangers, U-clamps, and threaded rods. • Insulation Tape: Nitrile rubber tape for joints. • Finishing: White cement or sealant for wall openings. • Cable Trays: GI perforated cable trays for exposed wiring/piping. Note: All materials should comply with BIS standards and Manufacturer's guidelines. Rate inclusives GST and labour cess. 1 Each 1 Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
Tendernotice_2.pdf
PDF • 0.80 MB
BOQ_2512662.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .