| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹16.5 LAccepted-AOC | ₹16.5 L | 1 | Accepted-AOC Acceptance of tender |
| 2 | 2₹18.0 L+₹1.5 L (9.10%)Rejected-Finance CIVIL LINE MATATILA ROAD TALBEHAT DISTT LALITPUR U P | TALBEHAT | LALITPUR | U P | ₹18.0 L+₹1.5 L (9.10%) | 2 | Rejected-Finance Not L1 |
| 3 | 3₹18.3 L+₹1.8 L (11.0%)Rejected-Finance C O BIPIN KUMAR VILL SATNAPUR POST BAHADURGANJ DISTT GHAZIPUR UP 275201 | BAHADURGANJ | GHAZIPUR | UTTAR PRADESH | 275201 | ₹18.3 L+₹1.8 L (11.0%) | 3 | Rejected-Finance Not L1 |
| 4 | 4₹19.0 L+₹2.5 L (15.2%)Rejected-Finance | ₹19.0 L+₹2.5 L (15.2%) | 4 | Rejected-Finance Not L1 |
| 5 | 5₹21.5 L+₹5.0 L (30.3%)Rejected-Finance D 91 BLOCK D AMITY GREEN HASEMAU LUCKNOW PIN 226028 | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226028 | ₹21.5 L+₹5.0 L (30.3%) | 5 | Rejected-Finance Not L1 |
| Sl No | Description | Qty | Unit | HARNAM SINGH ANIL SINGH L2 | SIDDHI VINAYAK CONSTRUCTION L4 | M/s Ramesh Chandra L1 | Matrubhoomi Construction L5 | M/s Bipin Construction L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation over area not exc 1.5mtr deep and getting out in soft/loose soil complete all as specified. | 330 | cum | 220 ₹72,600 | 219.73 ₹72,510.9 | 280 ₹92,400 | 200 ₹66,000 Lowest | 200 ₹66,000 Lowest |
| 2.00 | M & L for removing excavated material to a distance not exc 50m and deposting where directed at a level n.exc 1.5 m above from the starting point. | 276 | cum | 120 ₹33,120 | 288.35 ₹79,584.6 | 150 ₹41,400 | 70 ₹19,320 Lowest | 200 ₹55,200 |
| 3.00 | M & L rolling and consolidating formation surfaces in cutting/filling including embankment etc complete with power road roller exc 8 tonne but n.exc 12 tonne etc complete all as directed. | 110 | 10 sqm | 400 ₹44,000 | 25 ₹2,750 Lowest | 300 ₹33,000 | 200 ₹22,000 | 80 ₹8,800 |
| 4.00 | M & L soling (or sub base) with broken boulder or quarried stone filled interstices 150 mm thick spread thickness surface formed and rolled and consolidated with 8 to 10 tonnes power roller to required gradient and camber all as directed. | 110 | 10 sqm | 2,000 ₹2,20,000 Lowest | 2,238.65 ₹2,46,251.5 | 2,800 ₹3,08,000 | 4,000 ₹4,40,000 | 2,000 ₹2,20,000 Lowest |
| 5.00 | M & L for 150 mm thick (compacted thickness) water bound macadam complete laid in two separate layers each layer of 75 mm thick (compacted thickness) having graded stone aggregate (Granite, Trap & Basalt) of grading II ranging from 63 mm to 40 mm, hollows blinded with and including screening with moorum, watered, consolidated and compacted each layer separately to the required gradient and comber with 8 to 10 tonnes power roller complete all as specified | 110 | 10 sqm | 2,800 ₹3,08,000 Lowest | 4,112 ₹4,52,320 | 2,900 ₹3,19,000 | 4,450 ₹4,89,500 | 4,000 ₹4,40,000 |
| 6.00 | M & L preparing surfaces by brushing with wire brushes and mechanical compresser for removing caked mud etc., sweeping with brooms and finally fanning the cleaned surface with air compress to remove all loose dirt etc. on unsurfaced water bound macadam all as specified and as directed. | 110 | 10 sqm | 200 ₹22,000 | 324.5 ₹35,695 | 100 ₹11,000 | 30 ₹3,300 Lowest | 350 ₹38,500 |
| 7.00 | M & L using paving bitumen VG-10 grade, applying evenly a priming / tack coat with bituminous primer at 10 Kg per 10 Sq.m. laying by mechanical sprayer | 110 | 10 sqm | 550 ₹60,500 | 410 ₹45,100 | 350 ₹38,500 | 255 ₹28,050 Lowest | 350 ₹38,500 |
| 8.00 | M & L for 50mm thick (compacted thickness) premix bituminous, macadam with 4% by weight of total mix using paving bitumen VG-30 grade, laid/rolled and compacted with 8 to 10 tonnes power roller to required gradient and camber complete all as directed. | 55 | Cum | 8,500 ₹4,67,500 | 8,025 ₹4,41,375 | 6,000 ₹3,30,000 Lowest | 9,500 ₹5,22,500 | 6,000 ₹3,30,000 Lowest |
| 9.00 | M & L Bituminous premix asphaltic semi-dense concrete 40mm consolidated thickness with 5.5% binder (Paving bitumen VG 30) content by weight of total mix, rolled and compacted to required camber complete laid with self propelled mechanical pavers & rolled with 8 to 10 tonnes power roller & compacted to required camber and gradient complete all as specified and directed. | 110 | 10 Sqm | 2,800 ₹3,08,000 | 3,445 ₹3,78,950 | 2,700 ₹2,97,000 Lowest | 3,400 ₹3,74,000 | 4,500 ₹4,95,000 |
| 10.00 | M & L for preparing bituminous surfaces of road and marking 2.5mm thick centre lines, stop lines, dashes, arrows etc. and the like exc 10cm wide on roads pavements with hot applied thermo plastic road marking paint of approved colour including glass beads confirming to BS 3262-1989 with special applicator machine all as per manufacturers instruction complete all as specified and directed. | 60 | sqm | 500 ₹30,000 | 379.8 ₹22,788 | 350 ₹21,000 Lowest | 419 ₹25,140 | 350 ₹21,000 Lowest |
Tender Value
₹21 L
EMD Value
₹42,000
Closing Date
24 Oct 2025, 6:00 pmClosed
CWE Lucknow
HQ CWE Lucknow, 229 MG Road, Lucknow Cantt, Lucknow-226002
PROVN OF HARD BLACK TOP ROAD FROM SKP-I CREW HUT TO REAR GATE OF 1 ASSAM UNDER GE (WEST) LUCKNOW
2025_MES_733605_1
CWE/LKO/W/T-73 OF 2025-26
Open Tender
Civil Works
Item Rate
90 days
Lucknow
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE West lukcnow
₹42,000
Yes
22 Nov 2025
3 Oct 2025
31 Oct 2025
3 Oct 2025
24 Oct 2025
17 Oct 2025
3 Oct 2025 - 17 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
BOQ_821406.xls
BOQ • 0.28 MB
TenderET73.pdf
Tender Documents • 1.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .