Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹59.4 LAdmitted-Finance | -15.25% | ₹59.4 L | L1 | Admitted-Finance |
| 2 | L2₹59.8 L+₹33,254.08 (0.56%)Admitted-Finance | -8.85% | ₹59.8 L+₹33,254.08 (0.56%) | L2 | Admitted-Finance |
| 3 | L3₹61.2 L+₹1.7 L (2.93%)Admitted-Finance | -9.99% | ₹61.2 L+₹1.7 L (2.93%) | L3 | Admitted-Finance |
| 4 | L4₹62.8 L+₹3.4 L (5.68%)Admitted-Finance | -8.33% | ₹62.8 L+₹3.4 L (5.68%) | L4 | Admitted-Finance |
| 5 | L5₹64.2 L+₹4.8 L (8.01%)Admitted-Finance | -5.10% | ₹64.2 L+₹4.8 L (8.01%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S Deepak Construction Company L3 | M/s Karamchand Enterprises L5 | jai bajrang construction L1 | M/s Banwari Lal Choudhary Contractor L6 | M/S UPADHYAY CONTRACTOR PHULELA, BASWA L7 | MAA CHAMUNDA CONSTRUCTION COMPANY L2 | MS SUDESH SAINI L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| .01PART- B (Item Rate Basis) | ||||||||||
| 1.00 | Disposal of Rubbish unwanted material dismantelled material away from site at appropriate place including all lead and lift, loading and unloading, transportation, labour etc. as per direction of Engineer in Charges. | 18 | Cum. | 200 ₹3,600 Lowest | 300 ₹5,400 | 200 ₹3,600 Lowest | 400 ₹7,200 | 430 ₹7,740 | 350 ₹6,300 | 400 ₹7,200 |
| 2.00 | E/W in filling of excavated earth except black cotton soil with watering & compaction of spreaded earth in 15-30cm layers levelled & neatly dressed as per requirement of site & direction of E/I, work includes cost of earth with taxes, loading, unloading, transportation, labour, water & T&P etc. complete with all lead & lift. | 1,450 | Cum | 300 ₹4,35,000 | 290 ₹4,20,500 | 250 ₹3,62,500 Lowest | 320 ₹4,64,000 | 320 ₹4,64,000 | 300 ₹4,35,000 | 290 ₹4,20,500 |
| 3.00 | Supply, stacking & spreading & hand ramming of quarry rubbish in layer not exceeding 15 cm including all lead and lift transportation, loading, unloading with watering and hand ranning with labour, T&P, machinary water etc. complete in all respect finishing in line, level & camber as per directon of Engineer incharge. | 457 | Cum. | 750 ₹3,42,750 | 750 ₹3,42,750 | 620 ₹2,83,340 Lowest | 730 ₹3,33,610 | 810 ₹3,70,170 | 700 ₹3,19,900 | 790 ₹3,61,030 |
| 4.00 | Supply and spreading of graded crusher broken hard stone aggregate free from organic matter including stacking spreading in yard / trenches as per the standard specifications of size 40mm-63mm including all lead and lift transportation, labour, loading unloading T&P required for gravelling work as per direction of engineer in charges including dressing & leveling. | 302 | Cum. | 1,600 ₹4,83,200 | 1,700 ₹5,13,400 | 1,300 ₹3,92,600 Lowest | 1,700 ₹5,13,400 | 1,700 ₹5,13,400 | 1,600 ₹4,83,200 | 1,616 ₹4,88,032 |
Tender Value
₹75 L
EMD Value
₹1.5 L
Closing Date
6 Jul 2026, 3:00 pmClosed
SE (CIVIL) JPD, JAIPUR
OFFICE OF THE SE (CIVIL) JPD, JAIPUR OLD POWER HOUSE PREMISES, NEAR RAM MANDIR, BANIPARK, JAIPUR
Raising of boundary wall and yard level with other development work at 33 KV S/S Beejwad, Malakhera and Baleta
2026_JVVNL_570217_4
NIT-03/2026-27/SE CIVIL JAIPUR
Open Tender
Civil Works
Percentage
240 days
ALWAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,770
AO (O AND M) JVVNL, ALWAR
₹1.5 L
Yes
ALWAR
10 Jul 2026
23 Jun 2026
8 Jul 2026
23 Jun 2026
6 Jul 2026
23 Jun 2026
23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.001 | PART-A | - | - | - | - |
| 1 | (B-162/14.55)
Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meter lead. | 400 | Sqm. | 15 | ₹6,000 |
| 2 | (B-139/12.3.2)
Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish:
20mm thick. | 855 | Sqm. | 190 | ₹1,62,450 |
| 2.01 | (B-139/12.3.3)
12 mm thick | 165 | Sqm. | 160 | ₹26,400 |
| 2.02 | (B-139/12.3.1)
25 mm thick | 1,030 | Sqm. | 211 | ₹2,17,330 |
| 3 | (B-144/12.37.3)
Removing dry or oil bound distemper by scrapping sand papering and preparing surface smooth including necessary repairs to scratches by sandla/loi and all scaffolding (for colour changing only) | 1,010 | Sqm. | 4 | ₹4,040 |
| 4 | (B-144/12.37.1)
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade including all scaffolding:New work (two or more coats) over and including scrapping andpriming coat with cement primer. | 650 | Sqm. | 75 | ₹48,750 |
| 5 | (B-145/12.42)
Finishing walls with Acrylic Smooth exterior paint of required shade including all scaffolding. New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including base coat of water proofing cement paint applied @ 2.20 kg/ 10 sqm ). | 465 | Sqm. | 86 | ₹39,990 |
| 6 | (B-142/12.22.1)
Providing and applying white cement based putty over plastered surface to prepare the surface even and smooth complete.
(A) New Plastered Surface (three or more coats) | 1,100 | Sqm. | 84 | ₹92,400 |
| 7 | (B-145/12.41.1)
Finishing wall with water proofing cement paint of approved brand and manufacture and or required shade to give an even shade including all scaffolding:
(A) New work (Two or more coats applied @ 3.84 kg/10 sqm) | 1,530 | Sqm. | 53 | ₹81,090 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.05 MB
BOQ_1015187.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .