| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.8 LAccepted-AOC LOCATION ASSAM AS | L1 | Accepted-AOC L1 | |
| 2 | L2₹24.7 L+₹3.9 L (18.9%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹24.7 L+₹3.9 L (18.9%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
₹23.1 L
EMD Value
₹46,213
Closing Date
17 Oct 2023, 2:00 pmClosed
SE PWD Silchar Building Circle Silchar
SE PWD Silchar Building Circle Silchar
Civil, Work
2023_PWBNH_32732_1
SBC/CS/2023-24/13/593
Open Tender
Civil Works - Building
Item Rate
180 days
Bhanga Nirala in Karimganj
As per NIT
5 documents required · 5 mandatory
₹1,000
₹46,213
Yes
SE PWD Silchar Building Circle Silchar
8 Nov 2023
7 Oct 2023
18 Oct 2023
7 Oct 2023
17 Oct 2023
7 Oct 2023
7 Oct 2023 - 17 Oct 2023
16 Oct 2023
Amount
Earthwork in excavation for foundation trenches of walls, retaining walls, footings of column, steps, septic tank etc. including refilling (return filling) the quantity as necessary after completion of work, breaking clods in return filling, dressing, watering and ramming etc. and removal of surplus earth with all lead and lifts as directed and specified in the following classification of soils including bailing out water where necessary as directed and specified. (A) Up to a depth of 2.00m below the existing ground level. (a) In ordinary soil
Providing soling in foundation and under floor with stone/ best quality picked jhama brick, sand packed and laid to level and in panel after preparing the subgrade as directed including all labour and materials and if necessary dewatering, complete. (a).Brick on flat soling.
Plain cement concrete works with coarse aggregate of sizes 13mm to 32mm in foundation bed for footing steps, walls, brick works etc. as directed and specified including dewatering if necessary, and curing complete (shuttering where necessary shall be measured and paid separately). (a) In prop 1cement: 3 sand :6 coarse aggregate by volume
Supplying, fitting and fixing in position reinforcement bars conforming to relevant I.S. Code for R.C.C. work/ R.B. walling including straightening, cleaning, cutting and bending to proper shapes and length as per details, supplying and binding with 20G annealed black wire and placing in position with proper blocks, supports, chairs, spacers etc. complete. (No extra measurement for lap, hook, chair, anchor etc. will be entertained in the measurement as they are included in the rate) (Upto 1st floor level) a) From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL (ii)Super Ductile (SD) TMT reinforcement bars
Supplying, fitting and fixing in position reinforcement bars conforming to relevant I.S. Code for R.C.C. work/ R.B. walling including straightening, cleaning, cutting and bending to proper shapes and length as per details, supplying and binding with 20G annealed black wire and placing in position with proper blocks, supports, chairs, spacers etc. complete. (No extra measurement for lap, hook, chair, anchor etc. will be entertained in the measurement as they are included in the rate) (Upto 1st floor level) b) Other ISI approved TMT reinforcement bar (SAI/BISCON/THERMAX) (For Assam Type Bldg., drain works,,retaining wall&boundary wall etc. .
Providing and laying plain/reinforced cement croncrete works using cement, coarse sand & 20mm down graded stone aggregate with cost of necessary form work including dewatering if necessary, and curing for reinforced cement concrete work complete as directed (Reinforcement will be measured and paid separately) I) Using mixture machine (A) In sub - structure up to plinth level Foundation, footing, columns with base tie and plinth beam, pile cap, base slab, retaining walls, walls of septic tank, inspection pit and the like and other works not less than 100mm thick up to plinth level. N) Without using admixture, plasticiser (b) M20 or Prop. 1:11/2:3
Providing and laying plain/reinforced cement croncrete works using cement, coarse sand & 20mm down graded stone aggregate with cost of necessary form work including dewatering if necessary, and curing for reinforced cement concrete work complete as directed (Reinforcement will be measured and paid separately) I) Using mixture machine (B) In super structure up to 1st floor level i) Vertical members like column, pillars, post, struts etc N) Without using admixture, plasticiser (b) M20 or Prop. 1:11/2:3
Providing and laying plain/reinforced cement croncrete works cement, coarse sand & 20mm down graded stone aggregate including dewatering if necessary, and curing complete but excluding cost of form work and reinforcement for reinforced cement concrete work (form work and reinforcement will be measured and paid separately) (I) Using Mixer Machine (A) In substructure up to plinth level Foundation, footing, columns with base tie and plinth beam, pile cap, base slab, retaining walls, walls of septic tank, inspection pit and the like and other works not less than 100mm thick up to plinth level. (N) Without using admixture, plasticiser (b) M20 grade concrete or Prop. 1:1.5:3
Providing and laying plain/reinforced cement croncrete works cement, coarse sand & 20mm down graded stone aggregate including dewatering if necessary, and curing complete but excluding cost of form work and reinforcement for reinforced cement concrete work (form work and reinforcement will be measured and paid separately) (I) Using Mixer Machine (B) In super structure from plinth level up to 1st floor level. (ii) Columns, pillars, posts, struts, suspended floor, roof, landing, shelf and support, balcony, lintel, sill band, beam, girder, bressumer, cantilever, staircase (except spiral staircase and landing ) including preparing the top surface and finishing of nosing. (N) Without using admixture, plasticiser (b) M20 grade concrete or Prop. 1:1.5:3
Providing and laying plain/reinforced cement croncrete works cement, coarse sand & 20mm down graded stone aggregate including dewatering if necessary, and curing complete but excluding cost of form work and reinforcement for reinforced cement concrete work (form work and reinforcement will be measured and paid separately) (I) Using Mixer Machine i) Walls (thickness not less than 100mm) including attached pillasters, buttresses, plinth and string course etc. (N) Without using admixture, plasticiser (b) M20 grade concrete or Prop. 1:1.5:3
Providing form work of ordinary timber planking so as to give a rough finish including centering, shuttering, strutting and propping etc., height of propping and centering below supporting floor to ceiling not exceeding 4.0M and removal of the same for in-situ reinforced concrete and plain concrete work in: Foundation, footings, bases of columns, pile cap, raft and mass concrete works etc. (ii) Using 25mm thick plank
Providing form work of ordinary timber planking so as to give a rough finish including centering, shuttering, strutting and propping etc., height of propping and centering below supporting floor to ceiling not exceeding 4.0M and removal of the same for in-situ reinforced concrete and plain concrete work in: Sides of tie beams, grade beams etc. at or below ground level. (ii) Using 25mm thick plank
Providing form work of ordinary timber planking so as to give a rough finish including centering, shuttering, strutting and propping etc., height of propping and centering below supporting floor to ceiling not exceeding 4.0M and removal of the same for in-situ reinforced concrete and plain concrete work in: Columns, Pillars, Posts & Strut (a) Square, Rectangular, polygonal in plan or any shape like Tee/L etc. having plane vertical face (ii) Using 25mm thick plank
Providing form work of ordinary timber planking so as to give a rough finish including centering, shuttering, strutting and propping etc., height of propping and centering below supporting floor to ceiling not exceeding 4.0M and removal of the same for in-situ reinforced concrete and plain concrete work in: Sides and Soffits of Beams, beam haunchings, cantilever girders, bressumers, lintels and horizontal ties. (a) For depth not exceeding 1.0M. (ii) Using 25mm thick plank
Flat Surfaces such as soffits of suspended floors, roofs, landings, cantelever slabs, chajjas, balconies and the like. (a) Floors etc. upto 200mm in thickness. (ii) Using 25mm thick plank
Brick work in cement morter with 1st class brick including racking out joints and curing complete as directed. (II) In superstructure above plinth level up to 1st floor level. (b) In proportion 1:4.(1 cement:4 sand)
15 mm thick Cement plaster in single coat on single or half brick wall for interior plastering up to 1st floor level including arises, internal rounded angles, not exceeding 80mm girth and finished even and smooth including curing complete as directed. (A) On rough side (b) In cement mortar 1:4
Cement plaster skirting with cement mortar in prop. 1:3 (1 cement : 3 coarse sand) finished with a floating coat of neat cement including rounding of junctions with floor. (a) 15 mm thick
Badrul Islam Barbhuiya
AVENUE INFRATEL
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .