| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.3 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.3 L+₹2,260.66 (1.00%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.4 L+₹11,348.52 (5.02%)Admitted-Finance 25 2 1D DARGA ROAD PARK CIRCUS KOLKATA KOLKATA KOLKATA 700017 | KOLKATA | WEST BENGAL | 700017 | L3 | Admitted-Finance |
Tender Value
₹2.3 L
EMD Value
₹4,600
Closing Date
27 Oct 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE(C),BR-II
79,BIDHAN SARANI
REPAIRING OF UTTARAN TOILET AND PRIVIES AT 2,9,6 SEN LANE,5,NATHER BAGAN LN ,15,17,18 BENIATOLA ST ETC IN WARD NO -19
2026_KMC_1044510_1
KMC/EE (C)/BR-II/019/10/26-27/UTTARAN
Open Tender
CIVIL WORKS
Percentage
45 days
WARD-19
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹4,600
4 Nov 2026
6 Oct 2026
29 Oct 2026
6 Oct 2026
27 Oct 2026
6 Oct 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 10. Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed. | 53.98 | SQM | 19 | ₹1,025.62 |
| 2 | BUILDING WORKS (D) Flooring B. REPAIR AND REHABILITATION 9. Taking out Mirzapur or glazed porcelain tiles carefully by chiselling from walls or floor including stacking serviceable material as directed. | 39.6 | SQM | 106 | ₹4,197.6 |
| 3 | BUILDING WORKS (G) WOOD AND PVC WORKS B. DOOR WINDOW SHUTTER 14. Supplying, fitting & fixing fibre reinforced polymer (FRP) Composite door shutters as per approved design with glass fibre reinforced plastic moulded skins and a special sandwich core, so as to impart monolitaheic composite structure as per approved technology of Department of Science and Technology (DST) to satisfy IS:4020 door testing performance criteria. In ground floor (ii) 25 mm thick (For upper floors refer to item H(4) also) | 23.4 | SQM | 2,581 | ₹60,395.4 |
| 4 | BUILDING WORKS (G) WOOD AND PVC WORKS A. DOOR WINDOW FRAME 3. Supplying, fitting and fixing fibre reinforced polymer (FRP) Composite door frame as per approved section with glass fibre reinforced plastic moulded skins and a special sandwich core, so as to impart monolitaheic composite structure as per approved technology of Department of Science and Technology (DST) to safisfy IS: 4020 door testing performance criteria (ii) 66mm x 70mm | 88 | MTR | 446 | ₹39,248 |
| 5 | BUILDING WORKS (D) Flooring A. ORIGINAL WORKS 35. Supplying, fitting & fixing 1st quality Ceramic tiles in walls and floors to match with the existing work & 4 nos. of key stones (10mm) fixed with araldite at the back of each tile & finishing the joints with white cement mixed with colouring oxide if required to match the colour of tiles includingroughening of concrete surface, if necessary or by synthetic adhesive & grout materials etc. (B) Wall. With Sand Cement Mortar (1:3) 15 mm thick & 2 mm thick cement slurry at back side of tiles using cement @ 2.91 Kg/Sq.m & joint filling using white cement slurry @ 0.20kg/Sq.m. (a) Area of each tile upto 0.09 Sq.m (i) Coloured decorative. Note: 2. Add extra for each addl, floor over the rate for item 35 & 36 of subhead A. (i) upto 4 th floor-Rs 5/ Sq.m (i) above 4 th floor-Rs 6.25/ Sq.m | 39.6 | SQM | 749 | ₹29,660.4 |
| 6 | BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS?(20)Supplying, fitting and fixing 18 mm. to 22 mm. thick kota stone slab in wall, dado in 15 mm thick [avg] cement mortar (1:3) including making suitable arrangement to hold the stone properly by brass / copper hooks including pointing in cement mortar (1:2) (1 cement : 2 marble dust) with admixture of pigments matching the stone shade, including grinding and polishing all complete as per direction of Engineer-in-charge including cost of materials, labour, scaffolding, staging, curing complete. [Using cement slurry for bedding @4.4 kg/Sq.m and for jointing @1.8 kg/Sq.m](Add extra for each addl, floor over the rate for item 22, 25, 26, 17, 20, 31, 32 & 15 of subhead A. (I) upto 4 th floor- Rs. 12/-per Sq.m II) above 4th floor -Rs. 16/- per Sq.m | 9.36 | SQM | 1,154 | ₹10,801.44 |
| 7 | (B) - SANITARY AND DRAINAGE WORKS.(B)-(III) WATER CLOSETS AND URINALS.a) Original Works.(4)Supplying, fitting and fixing Orissa pattern water closet in white glazed vitreous chinaware of approved make in position complete excluding 'P' or 'S' trap (excluding cost of concrete for fixing).(ii) 530 mm X 410 mm | 8 | EA | 1,522 | ₹12,176 |
| 8 | (B) - SANITARY AND DRAINAGE WORKS.(B)-(III) WATER CLOSETS AND URINALS.a) Original Works.(9)Supplying, fitting and fixing Foot rest for water closet of size 275 mm X 125 mm with.(b) Porcelain of approved make. | 6 | PAR | 214 | ₹1,284 |
| 9 | SECTION(B) - SANITARY AND DRAINAGE WORKS.(B)-(II) SOIL PIPE AND FITTINGS.(a) Original Works.(14)Supplying,fitting and fixing cast iron 'P' or 'S' trap conformimg to I.S. 3989/ 2009 and 1729/ 2002 including lead caulked joints and painting two coats to the exposed surface. (Painting to be paid seperately).(A) 'P' Trap.(iii) 100 mm. | 8 | EA | 948 | ₹7,584 |
| 10 | BUILDING WORKS (G) WOOD AND PVC WORKS D. ACCESSORIES 4. Supplying, fitting and fixing M.S. clamps for door and window frame made of flat bent bar, end bifurcated with necessary screws etc. by cement concrete(1:2:4) as per direction. (Cost of concrete will be paid separately) (a) 40mm X 6mm, 250mm Length (The concreting will have to be done for equivalent thickness of 2 layers of brick work and for the entire width of the wall. No deduction on brick work will be made). | 120 | EA | 29 | ₹3,480 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
form.pdf
Tender Documents • 0.59 MB
civil.pdf
Additional Documents • 4.88 MB
BOQ_2561740.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .