| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 CrAccepted-AOC PLOT NO 212 VAISHNAV NAGAR KEDGAON AHMEDNAGAR 411 001 | AHMEDNAGAR | PUNE | MAHARASHTRA | 411001 | ₹6.1 Cr | L1 | Accepted-AOC Being Reasonable and Accepted |
| 2 | L2₹6.2 Cr+₹8.2 L (1.34%)Rejected-AOC 223 3 E B 1 MALTI TOWER TARABAI PARK KOLHAPUR 416 003 | KOLHAPUR | KOLHAPUR | MAHARASHTRA | 416003 | ₹6.2 Cr+₹8.2 L (1.34%) | L2 | Rejected-AOC Other Than L1 |
| 3 | L3₹6.2 Cr+₹11.7 L (1.91%)Rejected-AOC | ₹6.2 Cr+₹11.7 L (1.91%) | L3 | Rejected-AOC Other Than L1 |
| 4 | L4₹6.4 Cr+₹27.2 L (4.45%)Rejected-AOC BHAPKAR PATIL PLOT NO 24 GURHSHIP HOUSING SOCIETY SATBHAL MALA DEHIGATE AHMEDNAGAR 414001 | AHMEDNAGAR | AHMEDNAGAR | MAHARASHTRA | 414001 | ₹6.4 Cr+₹27.2 L (4.45%) | L4 | Rejected-AOC Other Than L1 |
| 5 | L5₹6.7 Cr+₹62.4 L (10.2%)Rejected-AOC | ₹6.7 Cr+₹62.4 L (10.2%) | L5 | Rejected-AOC Other Than L1 |
| Sl No | Description | Qty | Unit | Sharda Infratech L3 | D R CONSTRUCTION L2 | M/s S. R. Constructions L4 | N. H. Saluji & Associates L5 | SIDDHESH CONSTRUCTION L1 | SHREE KRISHNA INFRASTRUCTURE L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00SCH 'A' PART-I To XIII Note: This schedule is pre-priced by MES and the rate indicated under Col 5 signifies this fact only | |||||||||
| 2.00 | Total amount of Sch 'A' Part-I (Building and Structures) | 1 | LUMP SUM | 5,50,00,000 ₹5,50,00,000 | 5,37,52,000 ₹5,37,52,000 | 5,70,00,000 ₹5,70,00,000 | 5,95,00,000 ₹5,95,00,000 | 5,30,00,000 ₹5,30,00,000 Lowest | 5,94,00,000 ₹5,94,00,000 |
| 3.00 | Total amount of Sch 'A' Part-II (Site Clearance, Excavation and Earthwork) | 1 | LUMP SUM | 6,25,000 ₹6,25,000 | 10,63,784 ₹10,63,784 | 7,00,000 ₹7,00,000 | 5,90,232.93 ₹5,90,232.93 Lowest | 9,50,000 ₹9,50,000 | 11,07,000 ₹11,07,000 |
| 4.00 | Total amount of Sch ‘A’ Part III (Internal Water supply) | 1 | LUMP SUM | 4,00,000 ₹4,00,000 | 3,13,355.4 ₹3,13,355.4 Lowest | 4,00,000 ₹4,00,000 | 5,08,022.8 ₹5,08,022.8 | 4,38,000 ₹4,38,000 | 4,05,000 ₹4,05,000 |
| 5.00 | Total amount of Sch ‘A’ Part IV (Internal Electric Supply) | 1 | LUMP SUM | 13,50,000 ₹13,50,000 | 12,94,427 ₹12,94,427 Lowest | 15,00,000 ₹15,00,000 | 14,99,665.67 ₹14,99,665.67 | 16,50,000 ₹16,50,000 | 13,50,000 ₹13,50,000 |
| 6.00 | Total amount of Sch ‘A’ Part V (Road, Path and Culverts) | 1 | LUMP SUM | 8,25,000 ₹8,25,000 | 8,62,985 ₹8,62,985 | 6,50,000 ₹6,50,000 Lowest | 11,19,865.86 ₹11,19,865.86 | 10,46,000 ₹10,46,000 | 8,10,000 ₹8,10,000 |
| 7.00 | Total amount of Sch ‘A’ Part VI (Sewage Disposal) | 1 | LUMP SUM | 1,50,000 ₹1,50,000 | 1,37,050 ₹1,37,050 | 1,50,000 ₹1,50,000 | 1,30,432.3 ₹1,30,432.3 Lowest | 1,51,600 ₹1,51,600 | 1,44,000 ₹1,44,000 |
| 8.00 | Total amount of Sch ‘A’ Part VII (Area Drainage) | 1 | LUMP SUM | 7,00,000 ₹7,00,000 | 5,48,000 ₹5,48,000 | 5,50,000 ₹5,50,000 | 6,83,479.9 ₹6,83,479.9 | 5,94,330 ₹5,94,330 | 5,40,000 ₹5,40,000 Lowest |
| 9.00 | Total amount of Sch 'A' Part-VIII (External Water Supply) | 1 | LUMP SUM | 1,30,000 ₹1,30,000 Lowest | 1,86,480 ₹1,86,480 | 2,50,000 ₹2,50,000 | 3,11,499.8 ₹3,11,499.8 | 1,89,950 ₹1,89,950 | 2,25,000 ₹2,25,000 |
| 10.00 | Total amount of Sch 'A' Part-IX (External Electric Supply) | 1 | LUMP SUM | 8,00,000 ₹8,00,000 | 6,41,280 ₹6,41,280 Lowest | 7,25,000 ₹7,25,000 | 9,86,740.96 ₹9,86,740.96 | 8,00,000 ₹8,00,000 | 8,10,000 ₹8,10,000 |
Tender Value
₹7 Cr
EMD Value
₹6.8 L
Closing Date
3 Apr 2026, 6:00 pmClosed
Chief Engineer Pune Zone
HQ Chief Engineer Pune Zone Camp, Pune 411001
PROVISION OF SINGLE MEN BARRAKS FOR 100 AGNIVEERS UNDER GE (S) AHILYANAGAR
2026_MES_753999_1
84640
Open Tender
Civil Works
Lump-sum
457 days
Garrison Engineer (South) Ahilyanagar
Class A and Category a(i)
7 documents required · 7 mandatory
₹3,000
Garrison Engineer (South) Ahilyanagar
₹6.8 L
Yes
20 May 2026
27 Feb 2026
10 Apr 2026
27 Feb 2026
3 Apr 2026
27 Mar 2026
28 Feb 2026 - 7 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SCH 'A' PART-I To XIII
Note: This schedule is pre-priced by MES and the rate indicated under Col 5 signifies this fact only | - | - | - | - |
| - | Total amount of Sch 'A' Part-I (Building and Structures) | 1 | LUMP SUM | 5,69,26,000 | ₹5,69,26,000 |
| - | Total amount of Sch 'A' Part-II (Site Clearance, Excavation and Earthwork) | 1 | LUMP SUM | 12,55,814.74 | ₹12,55,814.74 |
| - | Total amount of Sch ‘A’ Part III (Internal Water supply) | 1 | LUMP SUM | 3,50,360.55 | ₹3,50,360.55 |
| - | Total amount of Sch ‘A’ Part IV (Internal Electric Supply) | 1 | LUMP SUM | 14,28,253.02 | ₹14,28,253.02 |
| - | Total amount of Sch ‘A’ Part V (Road, Path and Culverts) | 1 | LUMP SUM | 9,10,460.05 | ₹9,10,460.05 |
| - | Total amount of Sch ‘A’ Part VI (Sewage Disposal) | 1 | LUMP SUM | 1,51,665.46 | ₹1,51,665.46 |
| - | Total amount of Sch ‘A’ Part VII (Area Drainage) | 1 | LUMP SUM | 5,94,330.35 | ₹5,94,330.35 |
| - | Total amount of Sch 'A' Part-VIII (External Water Supply) | 1 | LUMP SUM | 1,89,938.9 | ₹1,89,938.9 |
| - | Total amount of Sch 'A' Part-IX (External Electric Supply) | 1 | LUMP SUM | 6,90,028.64 | ₹6,90,028.64 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.53 MB
MainDrawing.rar
Tender Documents • 11.72 MB
TDset1.rar
Additional Documents • 14.51 MB
TDset2.rar
Additional Documents • 17.18 MB
BOQ_844542.xls
BOQ • 0.61 MB
84640-SMB-100-IFA.pdf
Tender Documents • 5.17 MB
Amendment.pdf
PDF • 1.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .