Loading…
Loading…
Tender Value
₹4.8 L
EMD Value
₹9,680
Closing Date
31 Jul 2026, 4:00 pm5d left
Er Vinod Raina
Executive Engineer Irrigation Division Bhaderwah
Up-gradation/improvement of Neroj khul, Sarna khul, Kharothi khul and Panwara Malani khul at spots
2026_IFC_317311_5
eNIT 10 of 2025-26 dated 22.07.2026
Open Tender
Civil Works
Percentage
30 days
Bhaderwah
as per eNIT
2 documents required · 2 mandatory
₹600
Executive Engineer Irrigation Division Bhaderwah
₹9,680
22 Jul 2026
22 Jul 2026
1 Aug 2026
22 Jul 2026
31 Jul 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 37.4 | M³ | 592.9 | ₹22,174.46 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 18.91 | M³ | 5,733.6 | ₹1,08,422.38 |
| 3 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: | 36.36 | M³ | 5,402.9 | ₹1,96,449.44 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 2.75 | M³ | 6,591.25 | ₹18,125.94 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 34 | M² | 286.35 | ₹9,735.9 |
| 6 | Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) 50 % dry and 50% wet | 19.25 | M3 | 147.98 | ₹2,848.62 |
| 7 | Carriage of sand and 20 mm aggregate from crusher to site of work average distance of 45 km by MT and 0.5 km by head load | 43.11 | M³ | 1,279.82 | ₹55,173.04 |
| 8 | Carriage of stones average distance of 1.5 km by head load | 41.09 | M³ | 1,726.68 | ₹70,949.28 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_1039283.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].