Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC | ₹2.7 L | L1 | Accepted-AOC Aoci Issue |
| 2 | L2₹2.7 L+₹1,368.49 (0.52%)Rejected-Finance | ₹2.7 L+₹1,368.49 (0.52%) | L2 | Rejected-Finance L2 Bidder |
| 3 | L3₹2.7 L+₹2,710.15 (1.02%)Rejected-Finance | ₹2.7 L+₹2,710.15 (1.02%) | L3 | Rejected-Finance L3 bidder |
Tender Value
₹2.7 L
EMD Value
₹26,833
Closing Date
18 Mar 2026, 3:00 pmClosed
Chief Engineer, KNN
Chief Engineer office, KNN, Motijheel
Repairing work of patch by C.C. near selfie point and baba mehandi hasan dwar in colonelganj gammu khan ka hatha under ward-110 zone-4.
2026_NNKAN_1124863_1
707/AA-4/25-26
Open Tender
Civil Works
Percentage
30 days
ward-110, colonelganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹26,833
20 Aug 2026
14 Mar 2026
18 Mar 2026
14 Mar 2026
18 Mar 2026
14 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of cement concrete or brick or granolithic floors including base concrete and including stocking of materials as directed by enge within a distance of 60mt | 172.5 | sqm | 67 | ₹11,557.5 |
| 2 | Brick work with common burnt clay (non modular) bricks of class-150 In foundation and plinth in Cement mortar 1.4 (1 cement: 4 coarse sand) | 0.7 | cum | 6,600 | ₹4,620 |
| 3 | 12 mm cement plaster of mix.1:4 (1 cement: 4 coarse sand) | 4.4 | sqm | 200 | ₹880 |
| 4 | Construction of granular sub base (GSB) by providing coarse graded material, spreading in uniform layer with mortor grader on prepared surface, mixing by mixin place method with rotovator at OMC and compacting with viberatory raller to achieve the desired demiry as per clause 401 | 13.8 | cum | 3,671 | ₹50,659.8 |
| 5 | Providing and laying in petition cement concrete of specified grade excluding the cost of centering and shuttering-All work up to plinth level 1:15:3 (1 Cement. 1.5 coarse sand (zone-111): 3 graded stone aggregate Mmm nominal size) | 17.9 | cum | 7,160 | ₹1,28,164 |
| 6 | Additional for non mettalic cc surface hardner ete all complet | 172.5 | sqm | 96.25 | ₹16,603.13 |
| 7 | Supply and fixing of chequerred precat cement concrete tiles 22 mm thick in footpath & courtyard, Jointed with meat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc complete on 20 thick bed of cement mortar 14 (1 cement: 4 coarse sand | 13 | sqm | 808 | ₹10,504 |
| 8 | Disposal of moorum building rubbish malba similar unserviceable, dismantled or waste material by mechanical transport including 17.30 loading transporting, unloading to approved municipal dumping ground for lead upto 10 km fue ail lifts, complete as per directions of Engineer-in-charge | 17.3 | cum | 255 | ₹4,411.5 |
| 9 | Add 18 % G.S.T. | 1 | Tax | 40,932 | ₹40,932 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_2096397.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 14.84 MB
BOQ_2096397.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .