| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹5.8 L
EMD Value
₹5,780
Closing Date
9 Nov 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO BP, SALEM
BDO OFFICE, SALEM
Work No-7 Renovation of the East facing RCC Building in PUES at Chettichavadi H/O Chettichavadi
2023_RDTN_382318_1
1215-2023-A2
Open Tender
Civil Works - Buildings
Item Wise
90 days
BDO OFFICE
as per tender document
3 documents required · 3 mandatory
₹0
₹5,780
Yes
21 Nov 2023
30 Oct 2023
9 Nov 2023
30 Oct 2023
9 Nov 2023
30 Oct 2023
Amount
Renovation of the East facing RCC Building in PUES at Chettichavadi H/O Chettichavadi
Chipping of concrete and roughing the surface (Sl no 31 item no.38 A
Dismantling and clearing away the terracing work in roof,.etc complete
Weathering course with Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete
Finishing the top of roof with one course of PRESSED TILES of size 23 cm X 23 cm X 2 cm laid in cement mortar 1:3 (One cement and three Sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight.(Using 50% new and 50% old tiles)
Paving the floor with best approved quality fine polished Kota stone slabs of size 600 x 600 of 18 / 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three M.Sand) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., .
Providing Granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for paneling wherever necessary and as directed by the departmental officers)
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc complete
Distembering two coats with best approved oil bound distember including cost of painting priming coat over new plastered surface and conveyance of all materials to site and all labour charges
Painting two coats with approved Plastic Emulsion over one coat of Primaring coat of Cement Paint over cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc.
Painting two coats over Old iron works using Synthetic enamel paint including cost and conveyance of paint and all labour charges etc complete
Provision for Electrical arrangements
Providing and fixing P.V.C. Rainwater Downfall pipes of 100mm diametre with necessary shoes, bends and other speicals, clamps, screws, nails, teakwood plugs etc., complete including cost of all materials. The rate is to include cost of removable cast iron Gratings of appropriate size. The size of teakwood plugs to be used is 150mm * 25mm in front and 200mm * 75mm in rear and all other sides with a depth of 100mm. The pipe is to be fixed by means of "U" clamps at the cnetre of the pipe screwed to the plugs. The special type of 'U' clamps at the centre of the pipe to be fixed in addition to these for more than three metres pipe length, complete complying with standard specification.
Provision for Bala painting ( for class room)
Provisions for String Bandal (LR)
Provision for Chappal Rack(AS Per sub estimate)
Brick work in cement mortar 1:5 using country bricks of size 83/4"x41/4"x23/4" etc., complete
Supplying and fixing following thickness of cuddapah slab for cupboard
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Repairs to Doors and windows including cutting,welding charges
Provisions for locking arrangements to existing cupboard for Teacher
Supplying and fixing of PlyWood for Cupboard
Provision for Lock & Key arrangemrents
Provisions for water pedestal(AS Per sub estimate)
Earth work Excavation for Foundation in all soils and Sub Soil as per SS20B for foundation etc. complete.SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Collection and supply of Sand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Plastic Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Provision for Construction of Rainwater Harvesting Structure(AS Per sub estimate)
Earth work Excavation for Foundation in all soils and Sub Soil as per SS20B for foundation etc. complete.SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Brick work in cement mortar 1:5 using country bricks of size 83/4"x41/4"x23/4" etc., complete
Cost and Supply of 40mm HBG Metal from approved quarry including cost and conveyance of all material etc completed
Cost and Supply of 20mm HBG Metal from approved quarry including cost and conveyance of all material etc completed
Cost and Supply of Sand filling from approved quarry including cost and conveyance of all material etc completed
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Sree Shivalaya Constructions
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .